Completed No litigation declared Residential / Group Housing project

Mont Vert Grande Bldg Type G plot 2

By Niraj Kumar Associates Pvt Ltd

RG-MH-04901 · RERA P52100020880 · Last updated on MahaRERA portal: 9 Aug 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Mont Vert Grande Bldg Type G plot 2 is a Residential / Group Housing project by Niraj Kumar Associates Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100020880 on 15 May 2019. The registration is recorded completed; possession was promised by 30 Apr 2024.

At a glance

Project

  • NameMont Vert Grande Bldg Type G plot 2
  • TypeResidential / Group Housing
  • Location
    • s no 119/1
    • 5/3
    • 4/5
    • Pashan
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020880
  • ReraGenie IDRG-MH-04901

Builder

  • NameNiraj Kumar Associates Pvt Ltd
  • Entity typeCompany
  • CINU45209MH1995PTC094283
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorJayant Vallabhdas Kaneria
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2019PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 May 2019
  • Promised completion30 Apr 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mont Vert Grande Bldg G1NA150000
Mont Vert Grande Bldg G2NA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Mont Vert Grande Bldg G191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Mont Vert Grande Bldg G291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80
BuildingClosed/CoveredTotal
Mont Vert Grande Bldg G14040
Mont Vert Grande Bldg G24040

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,220 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17412.34
Proposed, not sanctioned6,281 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAundh, Pune

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTeam Work Architects
PartnerRole in project
Niraj Kumar Associates Pvt Ltd-

Litigation declared1

CaseCourtStatus
682/2019Hon Civil Judge Senior Division Pune at PunePending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Jun 2024

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 G BUILDING June 2024.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Grande G June 2024.pdf9 Aug 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 grande plot 2 G bldg signed.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A grande G RERA 2023 2024.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22 23 G.pdf14 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grande G bldg plot 2 completion certificate.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: GRANDE G.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 G Bldg.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GRANDE G.pdf15 May 2024
Certificates of CA (Form 3)File: MONTVERT GRAND G BUILDING FORM 3 March 2024_compressed.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: NKAPL GRANDE G.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GRAND G BUILDING FORM 3 Dec 2023.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Grande G Plot 2 Form 2 Dec 2023.pdf3 Feb 2024
Certificates of CA (Form 3)File: GRAND G BUILDING FORM 3 Dec 2023_compressed.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-9-23 GRANDE G.pdf6 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Mont Grande Bldg Type G plot 2.pdf28 Nov 2023
Certificates of CA (Form 3)File: FORM 3 MONTVERT GRAND G BUILDING Sept 2023_compressed.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2 Grande G Bldg June 2023.pdf9 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-6-23 GRANDE G.pdf9 Nov 2023
Certificates of CA (Form 3)File: FORM 3 - G BUILDING June 2023_compressed.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: G BLDG.pdf6 Nov 2023
Certificates of CA (Form 3)File: Form 3 M V Grande G Bldg Mar 23.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande G Bldg Mar 23.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande G Bldg Mar 23.pdf8 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A M V Grande G Bldg Mar 23.pdf8 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Grande G Bldg Mar 23.pdf8 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Grande G Mar 21.pdf28 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Grande G Bldg Mar 22.pdf28 Feb 2023
Certificates of CA (Form 3)File: FORM 3 G BUILDING MARCH 2020.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 G BUILDING MARCH 2021.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 M V Grande G June 2022.pdf25 Feb 2023
Certificates of CA (Form 3)File: FOrm 3 Grande G June 2022.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande G Bldg Mar 20.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande G Bldg Mar 21.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande G Bldg Mar 22.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande G Bldg Mar 20.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande G Bldg Mar 21.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande G Bldg Mar 22.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Grande Bldg G FY 2021-22.pdf4 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Grande G Dec 22 Qtr.pdf18 Jan 2023
Building plan approvalFile: G Bldg Section Elevation 5.pdf10 Nov 2022
Building plan approvalFile: G Bldg Second Eleventh 3.pdf10 Nov 2022
Building plan approvalFile: G Bldg Parking Floor 4.pdf10 Nov 2022
Building plan approvalFile: G Bldg Layout 2021.pdf10 Nov 2022
Layout approvalFile: G Bldg Layout 2021.pdf10 Nov 2022
Copy of Layout Approval (in case of layout)File: G Bldg Layout 2021.pdf10 Nov 2022
Building Plan Approval (IOD)File: G Bldg Section Elevation 5.pdf10 Nov 2022
Building Plan Approval (IOD)File: G Bldg Second Eleventh 3.pdf10 Nov 2022
Building Plan Approval (IOD)File: G Bldg Parking Floor 4.pdf10 Nov 2022
Building Plan Approval (IOD)File: G Bldg Layout 2021.pdf10 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: G Bldg C C GRANDE 2021.pdf10 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Scan Copy of Society Registration Certificate.pdf24 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Grande G Mar 22.pdf23 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - FY 19-20 Mont Vert Grande Bldg Type G plot 2 Final.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - FY 20-21 Mont Vert Grande Bldg Type G plot 2 Final.pdf13 Dec 2021
Proforma of Allotment letterFile: New-Mont Vert Grande, bldg G allotment letter -- Draft .pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A M V Grande G Bldg March 2021.pdf21 Jul 2021
Disclosure of sold/ booked inventoryFile: Inventory Report M V Grande G Bldg.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A M V Grande G Bldg.pdf9 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Grande G Bldg December 20 Qtr.pdf23 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM_2A G Bldg.pdf11 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-M V Grande G Bldg-Qtr-June20.pdf3 Sep 2020
Building plan approvalFile: 2-5.pdf29 Jul 2020
Building plan approvalFile: 3-5.pdf29 Jul 2020
Building Plan Approval (IOD)File: 2-5.pdf29 Jul 2020
Building Plan Approval (IOD)File: 3-5.pdf29 Jul 2020
Proforma of Allotment letterFile: Grande G Agmt Draft RERA Upload.pdf29 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Grande Plot 2 Q4 2019.pdf6 Mar 2020
Building plan approvalFile: Layout sheet 1 Jan 16 2020 R.pdf27 Jan 2020
Building Plan Approval (IOD)File: Layout sheet 1 Jan 16 2020 R.pdf27 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Grande commencement certificate.pdf27 Jan 2020
Details of encumbrancesFile: Encumrance plot 2 Grande RERA.pdf16 Nov 2019
Certificates of CA (Form 3)File: FORM 3 SIGN COPY Grande G Plot 2.pdf6 May 2019
Building plan approvalFile: Grande G Layout sanction RERA.pdf30 Apr 2019
Layout approvalFile: Grande G Layout sanction RERA.pdf30 Apr 2019
PAN CardFile: NKAPL PAN.pdf30 Apr 2019
Copy of the legal title reportFile: Grande Search Report Part 2 RERA.pdf30 Apr 2019
Copy of the legal title reportFile: Grande Search Report Part 2 RERA.pdf30 Apr 2019
Details of encumbrancesFile: Legal incumbrances Grande RERA.pdf30 Apr 2019
Copy of Layout Approval (in case of layout)File: Grande G Layout sanction RERA.pdf30 Apr 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Avion1401A Pashan-Sus Rd Pashan93CompletedDec 2017Late, Jul 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mont Vert Grande Bldg Type G plot 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pashan13,700+ in Pune

2 kmMont Vert Grande Bldg TyCompleted 84Lapsed / revoked 28Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 191 registered projects within 2 km.

Builder: Niraj Kumar Associates Pvt Ltd

Niraj Kumar Associates Pvt Ltd has 7 registrations on MahaRERA, including Mont Vert Avion and Mont Vert Velocity. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mont Vert Grande Bldg Type G plot 2 is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mont Vert Grande Bldg Type G plot 2?

The registered promoter entity is Niraj Kumar Associates Pvt Ltd, a company as per the filing. Its CIN U45209MH1995PTC094283 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mont Vert Grande Bldg Type G plot 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mont Vert Grande Bldg Type G plot 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mont Vert Grande Bldg Type G plot 2?

The professionals named in the filing: Architect: Team Work Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mont Vert Grande Bldg Type G plot 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mont Vert Grande Bldg Type G plot 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mont Vert Grande Bldg Type G plot 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.