Mont Vert Belcreek
RG-MH-21443 · RERA P52100029714 · Last updated on MahaRERA portal: 10 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 27 complaints at MahaRERA
- Completion date moved by 43 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mont Vert Belcreek is a Others project by Mont Vert Elegance in Pune, Maharashtra, registered with MahaRERA as P52100029714 on 26 Jun 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 43 months from the original filing. 120 of the 123 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 27 complaints are on record with the regulator.
At a glance
Project
- NameMont Vert Belcreek
- TypeOthers
- Location
- Pirangut Rd
- Bhugaon
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100029714
- ReraGenie IDRG-MH-21443
Builder
- NameMont Vert Elegance
- Entity typePartnership
- PartnersDhirajlal G Hansaliya, Jayant Vallabhdas Kaneria, Paresh M Changela
- Other registrations3 more →
- Completed2 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Jun 2021
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 31 May 2025)
- Buildings1 building record
- Documents filed134 files
Current status
Figures as on 10 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Mont Vert Belcreek | NA | 22 | 17 | 103 | 20 | 123 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.
Mont Vert Belcreek: 59% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 90% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 64% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 62% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 5% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed105
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Dr Subhas Nathmal Pallod | Pashan | Pune |
| Mrs Neha Harshal Limaye (nee Ms. Neha Subhash Pall | Pashan | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Mont Vert Belcreek | NA | Rs 23.22 cr | Rs 15.10 cr |
| - | NA | Rs 1.88 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vikas Achalakar AT consultants |
| Architect | Shrinivas V Kadkol |
| Engineer | Narendra Chaudhary |
| Engineer | Sachin Thangan |
| Engineer | S P Raut |
| Chartered Accountant | RSAR & Associates |
| Chartered Accountant | SAC & Co LLP |
| Partner | Role in project |
|---|---|
| Mont Vert Elegance | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. Demolition of old structure and Excavation took at least 6 months more due to unexpectedly hard rock strata. 2. Revision of plan took 1 months more than expected 3. We had to let go of a non-performing RCC contractor and hire a new contractor adding to 3 months of transition delays. 4. This project is a part of multiple projects in a basket funding with a financial institution(lenders). There is a default of loan payment of these loans. The financial institution has initiated proceedings under SARFAESI Act. We are in process of negotiations with our lenders. As a result, the work had stalle
Complaints filed with MahaRERA27
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504049 | Mangesh Suresh Shaharkar | Mont Vert Elegance | 17/11/2025 |
| CC12600613 | Shrinivas Gangadhar Pawar | Mont Vert Elegance | 02/02/2026 |
| CC12601296 | Dattatray Baban Marne | Mont Vert Elegance | 10/03/2026 |
| CC12601315 | Bhagyashree Jitendra Pawar | Mont Vert Elegance | 10/03/2026 |
| CC12601317 | Ranjana Bangar | Mont Vert Elegance | 10/03/2026 |
| CC12601319 | KRISHNA SHIVAJIRAO SHINDE | Mont Vert Elegance | 10/03/2026 |
| CC12601318 | SHRIKRISHNA SUBHASH KALE | Mont Vert Elegance | 10/03/2026 |
| CC12601321 | Sagar Dnyaneshwar papal | Mont Vert Elegance | 10/03/2026 |
| CC12601443 | Prasanna Sharadchandra Nirantare | Mont Vert Elegance | 15/03/2026 |
| CC12601345 | Shriniwas Krishnaji Joshi | Mont Vert Elegance | 11/03/2026 |
| CC12601348 | DEEPAK Rajaram Inamdar | Mont Vert Elegance | 11/03/2026 |
| CC12601531 | Vivekchandra Manohar More | Mont Vert Elegance | 20/03/2026 |
| CC12601371 | DEEPAK RAMCHANDRA ZORE | Mont Vert Elegance | 12/03/2026 |
| CC12601379 | Manoj Kumar Bhagat | Mont Vert Elegance | 12/03/2026 |
| CC12601384 | Akshada Ashok Sansare | Mont Vert Elegance | 12/03/2026 |
| CC12601395 | Tushar Sugandhi | Mont Vert Elegance | 13/03/2026 |
| CC12601401 | laxman pandurang pawar | Mont Vert Elegance | 13/03/2026 |
| CC12601402 | Rahul Prabhakar Wani | Mont Vert Elegance | 13/03/2026 |
| CC12601403 | Satish Kumar Kashinath Malusare | Mont Vert Elegance | 14/03/2026 |
| CC12601415 | KAPIL SUBHASH RATHOD | Mont Vert Elegance | 14/03/2026 |
| CC12601441 | Sujata Vishwas Limaye | Mont Vert Elegance | 15/03/2026 |
| CC12601442 | Sujata Vishwas Limaye | Mont Vert Elegance | 15/03/2026 |
| CC12601445 | Hiral Anil Taunk | Mont Vert Elegance | 15/03/2026 |
| CC12601469 | Kkomal Vijay Agrawal | Mont Vert Elegance | 16/03/2026 |
| CC12601525 | Yogesh Vasant Jadhav | Mont Vert Elegance | 19/03/2026 |
| CC12601639 | Kalpana Avinash Mundke | Mont Vert Elegance | 23/03/2026 |
| CC12601725 | Pradeep Arora | Mont Vert Elegance | 25/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed134
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Belcreek Q2 2025 final.pdf | 10 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Belcreek Q3 2025 final.pdf | 10 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Belcreek Q3 2025 final.pdf | 10 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Belcreek Q1 2026 final.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: RERA FORM 2 MV Belcreek Sep 2025.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 Belcreek Q3 Dec 2025.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 Belcreek Q4 March 2025.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 Belcreek Q1 June 2026.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Belcreek Sept 2025.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 Belcreek Q3 Dec 2025.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 Belcreek Q4 March 2025.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 Belcreek Q1 June 2026.pdf | 10 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Mont Vert Belcreek FY 2024 2025 sign.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Form 1 Belcreek June 2025.pdf | 20 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 BELCREEK June 2025.pdf | 20 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Belcreek 06 2025.pdf | 20 Mar 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 Montvert Belcreek March 2025.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ELEGANCE BELCREEK MARCH 2025 (1).pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 BELCREEK MARCH 2025.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsol List March 2025 Belcreek .pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD BELCREEK DEC 2024.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD BELCREEK DEC 2024.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD BELCREEK DEC 2024.pdf | 9 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Mont Vert Belcreek Dec 2024.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Mont Vert Belcreek Dec 2024.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Mont Vert Belcreek Dec 2024.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Belcreek Dec 2024.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024 Belcreek.pdf | 4 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Belcreek Dec 2024.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024 Belcreek.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024 Belcreek.pdf | 4 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Belcreek Dec 2024.pdf | 4 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Belcreek RERA 2022-2023.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Belcreek RERA 2023-2024.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Belcreek RERA 2022-2023.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Belcreek RERA 2023-2024.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Belcreek RERA 2022-2023.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Belcreek RERA 2023-2024.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA Dec 2023.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA June 2024.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA Sept 2024.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AXIS 2022-2023.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA Dec 2023.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA June 2024.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA Sept 2024.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AXIS 2022-2023.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA Dec 2023.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA June 2024.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Belcreek RERA Sept 2024.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AXIS 2022-2023.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belcreek Form 2 Dec 2023 (1).pdf | 15 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belcreek Form 2 Dec 2023 (1).pdf | 15 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belcreek Form 2 Dec 2023 (1).pdf | 15 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELCREEK 30 sep 24.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELCREEK Sept 2024.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Mont Vert Belcreek Sold Unsold Sept 2024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELCREEK 30 sep 24.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELCREEK Sept 2024.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Mont Vert Belcreek Sold Unsold Sept 2024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELCREEK Sept 2024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELCREEK 30 sep 24.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Mont Vert Belcreek Sold Unsold Sept 2024.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Mont Vert Belcreek 2023 2024.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Mont Vert Belcreek 2023 2024.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Mont Vert Belcreek 2023 2024.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Belcreek June 2024.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold BELCREEK June 2024 .pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Most Vert Becreek June 2024.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: BELCREEK.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 BELCREEK March 2024.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belcreek Form 2 Dec 2023.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELCREEK .pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Mont Vert Belcreek March 2024_compressed.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BELCREEK Form 1 CERTIFICATE March 2024.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: ELEGANCE BELCREEK .pdf | 8 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: ELEGANCE BELCREEK .pdf | 8 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MONT VERT BELCREEK Sept 2023 low res.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belcreek Form 1 Sept 2023.pdf | 7 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-9-23 BELCREEK.pdf | 6 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Belcreek Form 3 June 2023 signed.pdf | 6 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 134 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mont Vert Belcreek on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhugaon13,700+ in Pune
Filed coordinates, straight-line distance. 106 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Mont Vert Elegance
Mont Vert Elegance has 4 registrations on MahaRERA, including Mont Vert Belair and Mont Vert Belbrook. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Mont Vert Belcreek is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mont Vert Belcreek?
The registered promoter entity is Mont Vert Elegance, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mont Vert Belcreek?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mont Vert Belcreek?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Mont Vert Belcreek?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mont Vert Belcreek?
The professionals named in the filing: Architect: Vikas Achalakar AT consultants; Architect: Shrinivas V Kadkol; Engineer: Narendra Chaudhary; Engineer: Sachin Thangan; Engineer: S P Raut; Chartered Accountant: RSAR & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mont Vert Belcreek?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback