Millennium Towers

By Nasa Construction Pvt Ltd

RG-MH-39272 · RERA P51600048892 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
71 of 104Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

Millennium Towers is a Others project by Nasa Construction Pvt Ltd in Nashik, Maharashtra, registered with MahaRERA as P51600048892 on 24 Jan 2023. Possession is promised by 31 Mar 2030. 33 of the 104 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameMillennium Towers
  • TypeOthers
  • Location
    • Nashik
    • Nashik (M Corp.)
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600048892
  • ReraGenie IDRG-MH-39272

Builder

  • NameNasa Construction Pvt Ltd
  • Entity typeCompany
  • DirectorsAnand Bansi Patil, Sagar Mahadeorao Bonde
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed127 files

Current status

32%33 of 104 units booked
54.4%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing-ANA1616601272
Wing BNA9832032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Wing-A67%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Wing B22%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes30%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntYes35%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes30%

Parking filed94

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots94
Closed/Covered37
Open Space57
BuildingClosed/CoveredOpen SpaceTotal
Wing-A294574
Wing B81220

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,582 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Aug 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI9542.1
Proposed, not sanctioned9,541 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRavivar Karanja, Nasik City, Distt Nasik Maharashtra
Estimated costRs 20.41 cr
Cost incurredRs 11.09 cr
Work done54.35%
BuildingWingEstimatedIncurred
Wing-ANARs 12.00 crRs 10.09 cr
Wing BNARs 7.50 crRs 1.00 cr
-NARs 91.00 lakh-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNitin Kshirsagar
ArchitectRavi Amrutkar
EngineerShailesh Dumne
EngineerAmol Tade
Chartered AccountantParesh Sabadra
Chartered AccountantP N Sabadra & Associates
Chartered AccountantRSPH & Associates
Chartered AccountantSuchita Rakesh Pawar
PartnerRole in project
Nasa Construction Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - March 26 .pdf4 Jul 2026
Withdrawal Update Form 1File: AR .pdf18 May 2026
Withdrawal Update Form 2File: Engineer Certificate May-2026.pdf18 May 2026
Withdrawal Update Form 3File: CA.pdf18 May 2026
Building plan approvalFile: Page 2 of 6-Millenium Towers.pdf10 Feb 2026
Building plan approvalFile: Page 3 of 6-Millenium Towers.pdf10 Feb 2026
Building plan approvalFile: Page 4 of 6-Millenium Towers.pdf10 Feb 2026
Building plan approvalFile: Page 5 of 6-Millenium Towers.pdf10 Feb 2026
Building plan approvalFile: Page 6 of 6-Millenium Towers.pdf10 Feb 2026
Building plan approvalFile: Page 1 of 6-Millenium Towers.pdf10 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25.pdf7 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A - March 2024.pdf7 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A - March 2023.pdf7 Feb 2026
Withdrawal Update Form 1File: AR final.pdf28 Jan 2026
Withdrawal Update Form 2File: ER.pdf28 Jan 2026
Withdrawal Update Form 3File: CA Cert final.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: RERA Audit report 2024-25 final.pdf24 Nov 2025
Withdrawal Update Form 1File: AR - Sept 25.pdf30 Oct 2025
Withdrawal Update Form 2File: ER - sept 25.pdf30 Oct 2025
Withdrawal Update Form 3File: CA Certificate - sept 25 - Final.pdf30 Oct 2025
Form 1File: Architect mar 23.pdf29 Sep 2025
Form 2File: engineer mar 23.pdf29 Sep 2025
Form 3File: CA certificate mar 23.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure 23.pdf29 Sep 2025
Form 1File: Architect june 23.pdf29 Sep 2025
Form 2File: Engineer Certificate-June23.pdf29 Sep 2025
Form 3File: CA Certificate june 23.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure june 23.pdf29 Sep 2025
Form 1File: Architect Certificate-Dec 23.pdf29 Sep 2025
Form 2File: engineer dec 23.pdf29 Sep 2025
Form 3File: CA Certificate Dec 23 Final.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: CA Certificate Dec 23 Final.pdf29 Sep 2025
Form 1File: NASA Jun 24 AR Final.pdf22 Sep 2025
Form 2File: NASA ER Jun 24 Final.pdf22 Sep 2025
Form 3File: NASA CA Jun 24 Final.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure June 24.pdf22 Sep 2025
Form 1File: AR.pdf22 Sep 2025
Form 2File: ER.pdf22 Sep 2025
Form 3File: CA - Sept 24.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf22 Sep 2025
Form 1File: Architect-Final.pdf22 Sep 2025
Form 2File: ER - Dec 24-Final.pdf22 Sep 2025
Form 3File: CA dec 24 final.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure A B.pdf22 Sep 2025
Form 5 (FY 2022-2023)File: 2022-23 - Millenium Towers.pdf22 Sep 2025
Form 5 (FY 2023-2024)File: 2023-24 - Millenium Tower.pdf22 Sep 2025
Form 1File: AR - June 25.pdf25 Aug 2025
Form 2File: ER - June 25.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - june 25.pdf25 Aug 2025
Form 3File: CA - June 25 sign Final.pdf25 Aug 2025
Form 1File: Architect Certificate-March-25.pdf27 Jun 2025
Form 2File: Engineer Certificate-March-25.pdf27 Jun 2025
Form 3File: CA Certificate-March-25_Final.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE-NASA CONSTRUCTIONS PVT LTD_11zon.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE-NASA CONSTRUCTIONS PVT LTD.pdf3 May 2025
Other - TechnicalFile: Form 2A.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure A B.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect-Final.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA dec 24 final.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA dec 24 final.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER - Dec 24-Final.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Sept 24 Signed_compressed.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NASA Jun 24 AR Final.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NASA ER Jun 24 Final.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NASA CA Jun 24 Final.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure merged.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- March-24 Sign Copy.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate March 24.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- March-24 Sign Copy- Fin.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Disclosure_compressed.pdf17 Apr 2024
Other - TechnicalFile: Form 2A.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclousre A and B Wing.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engineers Certificate - Dac-2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 23 Final.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner.pdf24 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Sagar Nakshtra ApartmentP51600033692Nashik Shiwar, Nashik, NashikMar 2022CompletedDec 2026Dec 2023

How this compares with Nashik

32%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Millennium Towers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmMillennium TowersCompleted 47Lapsed / revoked 12Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: Nasa Construction Pvt Ltd

NASA CONSTRUCTION PVT.LTD. has 3 registrations on MahaRERA, including SAI SAGAR A and Sagar Nakshtra Apartment. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Millennium Towers is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Millennium Towers?

The registered promoter entity is Nasa Construction Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Millennium Towers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Millennium Towers?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Millennium Towers?

The professionals named in the filing: Architect: Nitin Kshirsagar; Architect: Ravi Amrutkar; Engineer: Shailesh Dumne; Engineer: Amol Tade; Chartered Accountant: Paresh Sabadra; Chartered Accountant: P N Sabadra & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Millennium Towers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Millennium Towers. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Millennium Towers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.