Red flags

  • Rs 22.00 crore secured on the land, in favour of Godrej Finance Limited
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • All 6 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 27Construction stages doneacross 3 buildings; furthest along: Basement (if any), 50%
106 of 144Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Millennium Amara Phase 2 is a Residential / Group Housing project by Millennium Developers in Pune, Maharashtra, registered with MahaRERA as PR1261012500899 on 22 Sep 2025. Possession is promised by 31 Dec 2029. 38 of the 144 units on this registration are recorded sold or booked, and 3 of 27 construction stages are filed complete.

At a glance

Project

  • NameMillennium Amara Phase 2
  • TypeResidential / Group Housing
  • Location
    • Little Earth Road
    • Mamurdi
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1261012500899
  • ReraGenie IDRG-MH-31879

Builder

  • NameMillennium Developers
  • Entity typePartnership
  • GSTIN27ABAFM7942A1ZH
  • PartnersSachin Srichand Kukreja, Haresh Govindram Abichandani, Neeraj Srichand Kukreja, Rajkumar Srichand Kukreja
  • Other registrations9 more →
  • Completed6 of 10
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed46 files

Current status

26%38 of 144 units booked
16.0%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E WingE141248048
F wingF141248048
G WingG Wing141248048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 50%.

E Wing · wing E17%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F wing · wing F17%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G Wing · wing G Wing18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Stilt / Ground40
Basement104
BuildingStilt / GroundBasementTotal
E Wing E242448
F wing F84048
G Wing G Wing84048

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area9,365 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofGodrej Finance Limited
Secured amountRs 22.00 crore
CERSAI search filedYes
Declared on16 Jan 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI12636.55
Proposed, not sanctioned12,637 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Survey No. 207/2/1/4A/1, Kaspate Wasti, Fortune Business Center, Wakad, Maharashtra.411057
Estimated costRs 4,200.00 cr
Cost incurredRs 672.00 cr
Work done16.0%
BuildingWingEstimatedIncurred
E WingERs 1,282.63 crRs 226.50 cr
F wingFRs 1,282.63 crRs 226.50 cr
G WingG WingRs 1,240.09 crRs 218.99 cr
-NARs 394.66 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU SHAILI
EngineerSantosh Salunkhe
EngineerSalim Shaikh
EngineerSujit Kondekar
Chartered AccountantSoniya Goel & Associates
Chartered AccountantMRK & COMPANY
Chartered AccountantPGMJ & ASSOCIATES
PartnerRole in project
Millennium Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Highlighted Layout.pdf13 May 2026
Building plan approvalFile: Building Plan Page 2 Basement Parking.pdf13 May 2026
Building plan approvalFile: Building Plan Page 3 Ground Parking.pdf13 May 2026
Building plan approvalFile: Building Plan Page 4 Commercial.pdf13 May 2026
Building plan approvalFile: Building Plan Page 5 Commercial Mezzanine.pdf13 May 2026
Building plan approvalFile: Building Plan Page 6 A Wing 2 to 13.pdf13 May 2026
Building plan approvalFile: Building Plan Page 7.pdf13 May 2026
Building plan approvalFile: Building Plan Page 8 B Wing 2 to 13.pdf13 May 2026
Building plan approvalFile: Building Plan Page 9.pdf13 May 2026
Building plan approvalFile: Building Plan Page 10 C Wing 1 to 13.pdf13 May 2026
Building plan approvalFile: Building Plan Page 11.pdf13 May 2026
Building plan approvalFile: Building Plan Page 12 D Wing 1 to 13.pdf13 May 2026
Building plan approvalFile: Building Plan Page 13.pdf13 May 2026
Building plan approvalFile: Building Plan Page 14 E Wing 1 to 12.pdf13 May 2026
Building plan approvalFile: Building Plan Page 15.pdf13 May 2026
Building plan approvalFile: Building Plan Page 16 F Wing 1 to 12.pdf13 May 2026
Building plan approvalFile: Building Plan Page 17.pdf13 May 2026
Building plan approvalFile: Building Plan Page 18 G Wing 1 to 12.pdf13 May 2026
Building plan approvalFile: Building Plan Page 19.pdf13 May 2026
Form 2A (FY 2025-2026)File: Form 2A Amara 2.pdf9 May 2026
Withdrawal Update Form 1File: FORM 1 - Amara PH 2.pdf14 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Amara PH 2.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3- AMARA PH2_compressed.pdf14 Apr 2026
Withdrawal Update Form 1File: FROM 1 - AMARA Ph 2.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 Amara Ph 2.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3Amara Ph 2 Revised Form 3_compressed.pdf7 Feb 2026
Layout approvalFile: Layout_compressed.pdf23 Dec 2025
Building plan approvalFile: Basement Layout Plan_compressed.pdf23 Dec 2025
Building plan approvalFile: Basement Plan_compressed.pdf23 Dec 2025
Building plan approvalFile: Elevation E wing_compressed.pdf23 Dec 2025
Building plan approvalFile: Elevation F wing_compressed.pdf23 Dec 2025
Building plan approvalFile: Elevation G wing_compressed.pdf23 Dec 2025
Building plan approvalFile: Floor Plan E wing_compressed.pdf23 Dec 2025
Building plan approvalFile: Floor Plan F wing_compressed.pdf23 Dec 2025
Building plan approvalFile: Floor Plan G wing_compressed.pdf23 Dec 2025
Building plan approvalFile: COMMENCEMENT CERTIFICATE -10-11-25_compressed.pdf23 Dec 2025
Withdrawal Update Form 1File: Form 1 Amara Phase 2.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 Amara Phase 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 - Amara Phase 2.pdf18 Oct 2025
Building plan approvalFile: E Wing Elevation (1).pdf7 Aug 2025
Building plan approvalFile: F Wing Elevation-1.pdf7 Aug 2025
Layout approvalFile: LAYOUT (1).pdf9 Jul 2025
Building plan approval or NA orderFile: NA Order Phase 2.pdf28 May 2025
Declaration and undertaking (Annexure A)File: Annexure A Order 50-2024.pdf8 May 2025
Building plan approvalFile: E WING.pdf6 May 2025
Building plan approvalFile: F WING.pdf6 May 2025

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MILLENNIUM FALCONP52100053875RAM NAGAR,TATHAWADE, Pune482Dec 2023OngoingDec 2028Not due yet
Millennium AmaraP52100052838Mamurdi, Pune217Oct 2023OngoingMar 2028Not due yet
MILLENNIUM PACIFICP52100027204TATHAWADE, Pune215Nov 2020CompletedMar 2024Mar 2024
Millennium AtlasP52100035007Tathawade,Pune, Pune124Apr 2022CompletedDec 2023Aug 2023
Millennium ManorP52100021632Chikhali, Pune127Jul 2019CompletedDec 2023Feb 2022
Acropolis 2P52100015821Vinode Wasti, Pune111Mar 2018CompletedApr 2022Jun 2020
AcropolisP52100000088NEAR BHUMKAR CHOWK, Pune152Jun 2017CompletedJan 2020Mar 2019
DivineP52100000055BORHADEWADI, Pune92Jun 2017CompletedAug 2018May 2018

How this compares with Pune

26%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Millennium Amara Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mamurdi13,700+ in Pune

2 kmMillennium Amara Phase 2Completed 58Lapsed / revoked 35Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 178 registered projects within 2 km.

Builder: Millennium Developers

Millennium Developers has 10 registrations on MahaRERA, including Acropolis and Divine. Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Millennium Amara Phase 2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Millennium Amara Phase 2?

The registered promoter entity is Millennium Developers, a partnership as per the filing. Its GSTIN 27ABAFM7942A1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Millennium Amara Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Millennium Amara Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Millennium Amara Phase 2?

The professionals named in the filing: Architect: VASTU SHAILI; Engineer: Santosh Salunkhe; Engineer: Salim Shaikh; Engineer: Sujit Kondekar; Chartered Accountant: Soniya Goel & Associates; Chartered Accountant: MRK & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Millennium Amara Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Millennium Amara Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Millennium Amara Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.