Home / Browse projects / Jalna, Maharashtra / MAYUR RESIDENCY
MAYUR RESIDENCY
RG-MH-01065 · RERA P51500006370 · Last updated on MahaRERA portal: 5 Dec 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAYUR RESIDENCY is a Residential / Group Housing project by GAUTAM KACHARDAS SANCHETI in Jalna, Maharashtra, registered with MahaRERA as P51500006370 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2022. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameMAYUR RESIDENCY
- TypeResidential / Group Housing
- Location
- GUT NO. 57
- NEAR ZILLA PARISHAD HIGH SCHOOL
- BHOKARDAN
- Bhokardan (M Cl)
- Jalna
- 431114
- Pincode431114
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500006370
- ReraGenie IDRG-MH-01065
Builder
- NameGAUTAM KACHARDAS SANCHETI
- Entity typeIndividual
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Aug 2017
- Promised completion30 Sep 2022
- Revised completionRevised to 30 Sep 2022 (originally 30 Sep 2019)
- Buildings15 building records
- Documents filed41 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| R H NO 1 TO 4A | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 5 TO 11 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 12 TO 17 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 18 TO 23 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 24 TO 29 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 30 TO 35 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 36 TO 42 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 43 TO 49 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 50 TO 56 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 57 TO 63 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 64 TO 69 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 70 TO 75 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 76 TO 81 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 82 TO 88 | NA | 2 | 0 | 0 | 0 | 0 |
| R H NO 89 TO 95 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building15
As on 5 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 165 construction stages are filed complete across 15 buildings. The stage furthest along is Excavation, at 46%.
R H NO 1 TO 4A4%
| Activity | Progress |
|---|---|
| Excavation | 46% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 5 TO 112%
| Activity | Progress |
|---|---|
| Excavation | 25% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 12 TO 173%
| Activity | Progress |
|---|---|
| Excavation | 31% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 18 TO 230%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 24 TO 290%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 30 TO 350%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 36 TO 420%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 43 TO 490%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 50 TO 560%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 57 TO 630%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 64 TO 6964%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 70 TO 7555%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 76 TO 8143%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 17% |
| Sanitary Fittings within the flats / premises | 17% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 17% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 82 TO 8827%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R H NO 89 TO 9527%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BARI ASSOCIATES PROPRIETOR ABDUL KHALIL SIDDIQUI |
| Engineer | S S CONSULTANTS PROPRIETOR SHAIKH MOHAMMED IMRAN |
| Chartered Accountant | PRAVEEN KACHRULAL BANGAD |
| Partner | Role in project |
|---|---|
| GAUTAM KACHARDAS SANCHETI | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHE PROJECT IS RUNNING VERY SLOW BECAUSE OF NON BOOKING OF ROW HOUSES DUR TO LOW RAIN IN THE TERRITORY FROM LAST TWO TO THREE YEARS.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed41
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Mayur Residency Bhokardan Completion Certificate.pdf | 5 Dec 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RERA AUDIT FY 2022-23.pdf | 22 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE BARI ASSOCIATES AFTER CHANGE 13 02 2023.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - S S CONSULTANTS - AFTER CHANGE - 13 02 2023.pdf | 13 Feb 2023 |
| Layout approvalFile: 1 REVISED PLAN LETTER AND NOC AND LAYOUT PLAN 22122022.pdf | 22 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: 1 REVISED PLAN LETTER AND NOC AND LAYOUT PLAN 22122022.pdf | 22 Dec 2022 |
| Other - TechnicalFile: 1 MAYUR RES CANCELLATION LETTER FOR RH 1 TO 63 AND 4A AND NOC 22122022.pdf | 22 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 RERA AUDIT FY 2021-22 NEW FORM.pdf | 14 Oct 2022 |
| Building plan approvalFile: CANCELLATION PLAN OF RH NO 1 TO 63 AND 44A.pdf | 15 Jul 2022 |
| Layout approvalFile: CANCELLATION PLAN OF RH NO 1 TO 63 AND 44A.pdf | 15 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: CANCELLATION PLAN OF RH NO 1 TO 63 AND 44A.pdf | 15 Jul 2022 |
| Building Plan Approval (IOD)File: CANCELLATION PLAN OF RH NO 1 TO 63 AND 44A.pdf | 15 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf | 18 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Certificates of CA (Form 5).pdf | 18 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Certificates of CA (Form 5).pdf | 18 Apr 2022 |
| Layout approvalFile: REVISED LAYOUT APPROVAL MAYUR RESIDENCY 30062021.pdf | 12 Oct 2021 |
| Layout approvalFile: REVISED LAYOUT APPROVAL MAYUR RESIDENCY 30 06 2021.pdf | 12 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: REVISED LAYOUT APPROVAL MAYUR RESIDENCY 30062021.pdf | 12 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: REVISED LAYOUT APPROVAL MAYUR RESIDENCY 30 06 2021.pdf | 12 Oct 2021 |
| Certificates of CA (Form 5)File: FORM 5 RERA AUDIT FY 2020-21.pdf | 24 Jun 2021 |
| Certificates of CA (Form 5)File: FORM 5 RERA AUDIT MAYUR RESIDENCY FY 2019-20.pdf | 19 Oct 2020 |
| Certificates of CA (Form 5)File: FORM 5 RERA AUDIT FY 2018-19.pdf | 28 Sep 2019 |
| Certificates of CA (Form 5)File: Form 5 RERA AUDIT FY 2017-18 GKS.pdf | 28 Dec 2018 |
| Building plan approvalFile: BUILDING PLAN MAYUR 2.PDF | 13 Aug 2017 |
| Copy of the legal title reportFile: SEARCH REPORT - MAYUR RESIDENCY.pdf | 13 Aug 2017 |
| Details of encumbrancesFile: MAYUR RESIDENCY - ENCUMBRANCE.pdf | 13 Aug 2017 |
| Details of encumbrancesFile: MAYUR RESIDENCY - ENCUMBRANCE.pdf | 13 Aug 2017 |
| Building Plan Approval (IOD)File: BUILDING PLAN MAYUR 2.PDF | 13 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT MAYUR RESIDENCY.pdf | 13 Aug 2017 |
| Certificates of CA (Form 3)File: CA CERTIFICATE MAYUR RESIDENCY.pdf | 13 Aug 2017 |
| Proforma of Allotment letterFile: MAYUR RESIDENCY ATS DRAFT.pdf | 13 Aug 2017 |
| Layout approvalFile: LAYOUT PLAN MAYUR RESIDENCY 1.pdf | 2 Aug 2017 |
| Layout approvalFile: LAYOUT PLAN MAYUR RESIDENCY 2.pdf | 2 Aug 2017 |
| Building plan approvalFile: BUILDING PLAN MAYUR 1.pdf | 2 Aug 2017 |
| Building plan approvalFile: BUILDING PLAN MAYUR 3.pdf | 2 Aug 2017 |
| PAN CardFile: GAUTAM SANCHETI - PAN CARD.pdf | 2 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN MAYUR RESIDENCY 1.pdf | 2 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN MAYUR RESIDENCY 2.pdf | 2 Aug 2017 |
| Building Plan Approval (IOD)File: BUILDING PLAN MAYUR 1.pdf | 2 Aug 2017 |
| Building Plan Approval (IOD)File: BUILDING PLAN MAYUR 3.pdf | 2 Aug 2017 |
| Declaration in FORM BFile: FORM B MAYUR RESIDENCY 1.pdf | 2 Aug 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| RYANS RESIDENCYP51500017633 | SHIOOR, Aurangabad | 42 | Aug 2018 | Completed | Aug 2024 | Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalna
Computed across the 100+ Jalna projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 41 filed documents as one ZIP, foldered, with a manifest
Keep MAYUR RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHOKARDAN100+ in Jalna
Nandigram Township
Anandi Buildcon
SECTOR 101
MANISH RAMNIRANJAN AGRAWAL
VITTHALA TOWERS
TIRUPATI BUILDCON
SHREE SAI CITY PHASE-I
SHREE SAI CITY BUILDERS AND DEVELOPERS
JINDAL GOYAL SQUARE
JINDAL GOYAL REALITY LLP
Krishna Capital
Krishna Capital
See every Jalna project, with the district possession charts
Builder: GAUTAM KACHARDAS SANCHETI
GAUTAM KACHARDAS SANCHETI has 1 registration on MahaRERA, including MAYUR RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Jalna district page.
Frequently asked questions
What are my rights if MAYUR RESIDENCY is delayed beyond 30 Sep 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAYUR RESIDENCY?
The registered promoter entity is GAUTAM KACHARDAS SANCHETI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAYUR RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAYUR RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAYUR RESIDENCY?
The professionals named in the filing: Architect: BARI ASSOCIATES PROPRIETOR ABDUL KHALIL SIDDIQUI; Engineer: S S CONSULTANTS PROPRIETOR SHAIKH MOHAMMED IMRAN; Chartered Accountant: PRAVEEN KACHRULAL BANGAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAYUR RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback