Home / Browse projects / Jalna, Maharashtra / VITTHALA TOWERS
VITTHALA TOWERS
RG-MH-08768 · RERA P51400022318 · Last updated on MahaRERA portal: 24 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 20 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VITTHALA TOWERS is a Others project by TIRUPATI BUILDCON in Jalna, Maharashtra, registered with MahaRERA as P51400022318 on 16 Sep 2019. Possession was promised by 3 Feb 2025 and is now 20 months past that date. 149 of the 319 units on this registration are recorded sold or booked, and 11 of 55 construction stages are filed complete.
At a glance
Project
- NameVITTHALA TOWERS
- TypeOthers
- Location
- NEAR BHAGYANAGAR
- SHANI MANDIR CHOWK
- OLD JALNA.
- ANANDI GINNING
- Jalna (M Cl)
- Jalna
- 431203
- Pincode431203
- RERA no.P51400022318
- ReraGenie IDRG-MH-08768
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Sep 2019
- Promised completion3 Feb 2025
- Revised completionNone
- Buildings5 building records
- Documents filed65 files
Current status
Figures as on 24 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 10 | 10 | 28 | 0 | 28 |
| BUILDING B1-B2 | NA | 10 | 10 | 56 | 0 | 56 |
| BUILDING B3-B4 | NA | 10 | 10 | 56 | 0 | 56 |
| BUILDING 5 | NA | 10 | 10 | 28 | 0 | 28 |
| BUILDING C | NA | 9 | 9 | 0 | 151 | 151 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 24 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
BUILDING A45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B1-B20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B3-B40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING 544%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 24 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| COMPOUND WALL AND ENTRANCE GATE | Yes | 0% |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING A | 1 | 1 | 2 |
| BUILDING B1-B2 | 1 | 1 | 2 |
| BUILDING B3-B4 | 0 | 1 | 1 |
| BUILDING 5 | 0 | 1 | 1 |
| BUILDING C | 1 | 0 | 1 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| LEELADEVI BHAGWANDAS LAHOTI | Jalna (M Cl) | Jalna |
| RAJESH KISHANLAL LAHOTI | Jalna (M Cl) | Jalna |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMEER N AUSEKAR |
| Engineer | MILIND M WADEKAR |
| Chartered Accountant | SARANG GOVIND YADKIKAR |
| Partner | Role in project |
|---|---|
| TIRUPATI BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Aug 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Jan To March 2025.pdf | 24 Feb 2026 |
| Form 2File: Form 2 Jan To March 2025.pdf | 24 Feb 2026 |
| Form 3File: Form 3 March 2025 new.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold Unsold Vitthala Tower 31-03-2025.pdf | 24 Feb 2026 |
| Form 1File: Form 1 30-06-24.pdf | 23 Feb 2026 |
| Form 2File: Form 2 30-06-24.pdf | 23 Feb 2026 |
| Form 3File: Form 3 Vittala tower.pdf | 23 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-2024.pdf | 23 Feb 2026 |
| Form 1File: Form 1 30-09-24.pdf | 23 Feb 2026 |
| Form 2File: Form 2 30-09-24.pdf | 23 Feb 2026 |
| Form 3File: Form 3 Vittala Tower.pdf | 23 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-09-2024.pdf | 23 Feb 2026 |
| Form 1File: Form 1 31-12-24.pdf | 23 Feb 2026 |
| Form 2File: Form 2 31-12-2024.pdf | 23 Feb 2026 |
| Form 3File: Form 3 Vittala Tower.pdf | 23 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12-2024.pdf | 23 Feb 2026 |
| Form 2A (FY 2021-2022)File: Form 2A-2021-22.pdf | 11 Feb 2026 |
| Form 2A (FY 2022-2023)File: Form 2A-2022-23.pdf | 11 Feb 2026 |
| Form 2A (FY 2023-2024)File: Form 2A-2023-24.pdf | 11 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A-2024-25.pdf | 11 Feb 2026 |
| Form 5 (FY 2020-2021)File: Form 5 - 2020-21.pdf | 11 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - 2022-23.pdf | 11 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5 -2023-24.pdf | 11 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 -2024-25.pdf | 11 Feb 2026 |
| Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER_VITTHALA TOWERS.pdf | 3 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation RERA.pdf | 3 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation RERA.pdf | 3 Mar 2023 |
| Declaration about Commencement CertificateFile: Format-D_29 Nov 2021.pdf | 19 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate 2_05 July 2020.pdf | 19 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate 3_03 OCT 2020.pdf | 19 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate 1-05 Jan 2021.pdf | 19 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate 4_03 April 2021.pdf | 19 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineers Ceriticate 2_05 July 2020.pdf | 19 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineers Certificate 3_03 oct 2020.pdf | 19 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineers Cerificate 1_05 Jan 2021.pdf | 19 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineers Certificate 4_03 April2021.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Quality Assurance Certificate_20-21.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Quality Assurance 2_25 Nov 2021.pdf | 19 Jan 2022 |
| Certificates of CA (Form 3)File: 3 C A Form -3_30 june 2020.pdf | 19 Jan 2022 |
| Certificates of CA (Form 3)File: 4 C A Form -3_30 sept 2020.pdf | 19 Jan 2022 |
| Certificates of CA (Form 3)File: 2 C A Form-3_31 Dec 2020.pdf | 19 Jan 2022 |
| Certificates of CA (Form 3)File: 1 C A Form-3_31 March 2021.pdf | 19 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: C A Form-5_15 dec 2021.pdf | 19 Jan 2022 |
| Proforma of Allotment letterFile: allotment letter.pdf | 19 Aug 2019 |
| Proforma of Allotment letterFile: Vitthala Towre Agreement to Sale August - 2019.pdf | 19 Aug 2019 |
| Copy of the legal title reportFile: Search report.pdf | 7 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: commensmnt old.PDF | 7 Aug 2019 |
| OtherFile: Deed Of Declaration .PDF | 7 Aug 2019 |
| Layout approvalFile: layout.pdf | 6 Aug 2019 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 6 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 6 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate .PDF | 6 Aug 2019 |
| Certificates of CA (Form 3)File: C A From .PDF | 6 Aug 2019 |
| Building plan approvalFile: 1by10 (10 files merged).pdf | 5 Aug 2019 |
| Building plan approvalFile: 1by10 (11 files merged.pdf | 5 Aug 2019 |
| PAN CardFile: pan.pdf | 5 Aug 2019 |
| Details of encumbrancesFile: encumbranc.pdf | 5 Aug 2019 |
| Building Plan Approval (IOD)File: 1by10 (10 files merged).pdf | 5 Aug 2019 |
| Building Plan Approval (IOD)File: 1by10 (11 files merged.pdf | 5 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate 2019.PDF | 5 Aug 2019 |
| Declaration in FORM BFile: form B.pdf | 5 Aug 2019 |
| OtherFile: partners GPA.pdf | 5 Aug 2019 |
| OtherFile: owner GPA.PDF | 5 Aug 2019 |
| OtherFile: 712.pdf | 5 Aug 2019 |
| OtherFile: Development Agreement .PDF | 5 Aug 2019 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| RUKHMINI HEIGHTSP51400080917 | JALNA, Jalna | 93 | Aug 2025 | Ongoing | Mar 2031 | Not due yet |
| RAGHUKUL COMPLEXP51400029891 | S.T COLONY, Jalna | - | Jul 2021 | Completed | Jul 2024 | Mar 2022 |
| Tirupati PlazaP51400002779 | Jalna (M Cl), Jalna | - | Aug 2017 | Completed | Dec 2020 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalna
Computed across the 100+ Jalna projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VITTHALA TOWERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANANDI GINNING100+ in Jalna
SHREE SAI CITY PHASE-I
SHREE SAI CITY BUILDERS AND DEVELOPERS
JINDAL GOYAL SQUARE
JINDAL GOYAL REALITY LLP
Krishna Capital
Krishna Capital
Lalbag, Plotting
GO Developers LLP
RUKHMINI HEIGHTS
TIRUPATI INFRA JALNA
Anandi Business Complex
RIIVA BUILDERS AND DEVELOPERS LLP
See every Jalna project, with the district possession charts
Builder: TIRUPATI BUILDCON
TIRUPATI BUILDCON has 3 registrations on MahaRERA, including SAI NAKSHATRA and VITTHALA TOWERS. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Jalna district page.
Frequently asked questions
What does it mean that VITTHALA TOWERS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VITTHALA TOWERS is delayed beyond 3 Feb 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VITTHALA TOWERS?
The registered promoter entity is TIRUPATI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VITTHALA TOWERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VITTHALA TOWERS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VITTHALA TOWERS?
The professionals named in the filing: Architect: SAMEER N AUSEKAR; Engineer: MILIND M WADEKAR; Chartered Accountant: SARANG GOVIND YADKIKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VITTHALA TOWERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback