Home / Browse projects / Jalna, Maharashtra / Nandigram Township

Registered No litigation declared Residential / Group Housing project

Nandigram Township

By Anandi Buildcon

RG-MH-45462 · RERA P51400077504 · Last updated on MahaRERA portal: 25 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
0 of 572Construction stages doneacross 52 buildings; furthest along: Excavation, 12%
340 of 470Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Nandigram Township is a Residential / Group Housing project by Anandi Buildcon in Jalna, Maharashtra, registered with MahaRERA as P51400077504 on 20 Aug 2024. Possession is promised by 31 Mar 2029. 130 of the 470 units on this registration are recorded sold or booked, and 0 of 572 construction stages are filed complete.

At a glance

Project

  • NameNandigram Township
  • TypeResidential / Group Housing
  • Location
    • Gut No 75
    • At post Daregaon
    • Daregaon (jalna)
    • Jalna
    • 431214
  • Pincode431214
  • RERA no.P51400077504
  • ReraGenie IDRG-MH-45462

Builder

  • NameAnandi Buildcon
  • Entity typePartnership
  • PartnersAmol Jindal, Anand Jindal, Amol Mahajan, Pankaj Agrawal, Anup Jaykishan Jindal

Key dates

this monthRegisteredAug 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings52 building records
  • Documents filed66 files

Current status

28%130 of 470 units booked
54.5%Work done, per cost certificate

Figures as on 25 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block ANA2110010
Block BNA21808
Block CNA21808
Block DNA21707
Block ENA2110010
Block FNA2110010
Block GNA21909
Block HNA21808
Block INA21808
Block JNA21808
BLock KNA21808
Block LNA2110010
Block MNA2110010
Block NNA2110010
Block ONA21808
Block PNA21808
Block QNA21808
Block RNA21707
Block SNA2110010
Block TNA2110010
Block UNA2110010
Block VNA21707
Block WNA21808
Block XNA21808
Block YNA1110010
Block ZNA21707
Block AANA21808
Block BBNA21808
Block CCNA1110010
Block DDNA21707
Block EENA21808
Block FFNA21808
Block GGNA11909
Block HHNA21707
Block IINA21808
Block JJNA21808
Block KKNA11909
Block LLNA11909
Block MMNA11808
Block NNNA1112012
Block OONA1112012
Block PPNA1110010
Block QQNA1110010
Block RRNA11808
Block SSNA1112012
Block TTNA1112012
Block UUNA1110010
Block VVNA1110010
Block WWNA11808
Block XXNA1112012
Block YYNA1112012
Block ZZNA1110010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 25 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 52 buildings; the table lists the first 20.

0 of 572 construction stages are filed complete across 52 buildings. The stage furthest along is Excavation, at 12%.

Block A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block E1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block F3%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block G3%
ActivityProgress
Excavation9%
Basement (if any)9%
Podiums (if any)0%
Plinth9%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block I0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block J0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLock K0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block L1%
ActivityProgress
Excavation7%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block M1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block N1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block O0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block P0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block Q0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block R0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block S1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block T1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed661

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots661
Open Space661
BuildingOpen SpaceTotal
Block A1616
Block B1616
Block C1616
Block D1616
Block E1616
Block F1616
Block G1616
Block H1616
Block I1616
Block J1616
BLock K1616
Block L1616
Block M1616
Block N1616
Block O1616
Block P1616
Block Q1616
Block R1616
Block S1616
Block T1616
Block U1616
Block V1616
Block W1616
Block X1616
Block Y77
Block Z1616
Block AA1616
Block BB1616
Block CC77
Block DD1616
Block EE1616
Block FF1616
Block GG77
Block HH1616
Block II1616
Block JJ1616
Block KK77
Block LL77
Block MM77
Block NN77
Block OO77
Block PP77
Block QQ77
Block RR77
Block SS77
Block TT77
Block UU77
Block VV77
Block WW77
Block XX77
Block YY77
Block ZZ77

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area65,800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025

Approvals and building plan

Sanctioning authorityCollector office Jalna
Permissible FSI24267.75
Proposed, not sanctioned24,268 sq m
Buildings approved52
Buildings sanctioned52

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPritishudha Shopping Center, Benjonji Road - Shivaji Chowk, Raymonds Showroom, Dist Jalna, 431203
Estimated costRs 27.93 cr
Cost incurredRs 15.23 cr
Work done54.52%
BuildingWingEstimatedIncurred
Block ANARs 71.70 lakhRs 7.17 lakh
Block ENARs 71.70 lakhRs 71.70 lakh
Block FNARs 71.70 lakhRs 71.70 lakh
Block LNARs 71.70 lakhRs 71.70 lakh
Block MNARs 71.70 lakhRs 71.70 lakh
Block NNARs 71.70 lakhRs 71.70 lakh
Block SNARs 71.70 lakhRs 71.70 lakh
Block TNARs 71.70 lakhRs 71.70 lakh
Block UNARs 71.70 lakhRs 71.70 lakh
Block GNARs 64.53 lakhRs 64.53 lakh
Block BNARs 57.36 lakhRs 5.74 lakh
Block CNARs 57.36 lakhRs 5.74 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnandKumar Baburao Mhaske Mhaske
EngineerGOPAL PRABHAKAR PAWAR PAWAR
Chartered AccountantSABS & Associates
Chartered AccountantR B Sharma & Co
Chartered AccountantNARENDRA NAVANDAR & CO
Chartered AccountantBSKY AND ASSOCIATES
PartnerRole in project
Anandi Buildcon-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A (1).pdf25 Feb 2026
Form 5 (FY 2024-2025)File: FORM-5.pdf21 Jan 2026
Form 1File: form 1 anandi.pdf5 Aug 2025
Form 2File: form 2 anandi.pdf5 Aug 2025
Form 3File: FORM 3.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf5 Aug 2025
Withdrawal Update Form 1File: form 1 anandi.pdf5 Aug 2025
Withdrawal Update Form 1File: form 1 anandi.pdf5 Aug 2025
Withdrawal Update Form 2File: form 2 anandi.pdf5 Aug 2025
Withdrawal Update Form 2File: form 2 anandi.pdf5 Aug 2025
Withdrawal Update Form 3File: form 3 nandi.pdf5 Aug 2025
Withdrawal Update Form 3File: form 3 nandi.pdf5 Aug 2025
Copy of the legal title reportFile: Title Report.pdf12 Aug 2024
Details of encumbrances concerned to FinanceFile: declaration-2.pdf12 Aug 2024
Details of encumbrances concerned to LegalFile: declaration-2.pdf12 Aug 2024
Declaration about Commencement CertificateFile: doc-2 format d.pdf12 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT - A.pdf12 Aug 2024
Other - LegalFile: DECLARATION.pdf12 Aug 2024
Other - LegalFile: DIstribution deed.pdf1 Aug 2024
Other - LegalFile: ANANDI BUILDCON_DURUSTI.pdf1 Aug 2024
Other - LegalFile: ANANDI BUILDCON_REGISTRY-1.pdf1 Aug 2024
Other - LegalFile: ANANDI BUILDCON_REGISTRY-2.pdf1 Aug 2024
Other - LegalFile: ANANDI BUILDCON_REGISTRY-3.pdf1 Aug 2024
Other - LegalFile: ANANDI BUILDCON_REGISTRY-4.pdf1 Aug 2024
Other - TechnicalFile: DIstribution deed.pdf1 Aug 2024
Other - TechnicalFile: ANANDI BUILDCON_DURUSTI.pdf1 Aug 2024
Other - TechnicalFile: ANANDI BUILDCON_REGISTRY-1.pdf1 Aug 2024
Other - TechnicalFile: ANANDI BUILDCON_REGISTRY-2.pdf1 Aug 2024
Other - TechnicalFile: ANANDI BUILDCON_REGISTRY-3.pdf1 Aug 2024
Other - TechnicalFile: ANANDI BUILDCON_REGISTRY-4.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Anandi Buildcon.pdf31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (All 5 Partners) NANDIGRAM.pdf31 Jul 2024
Proforma of Agreement for saleFile: Anandi Buildcon_ Agreement to sale.pdf24 Jul 2024
Other - TechnicalFile: ANNEXURE A.pdf24 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: New Doc 19.pdf22 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement cert without splitting.pdf28 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report_200298719091_For_Asset_Based_Search_29_02_2024_18_15_26_768.pdf29 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Encumbrances.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: img20240210_15143134.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf12 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrances on letter head.pdf30 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrances on letter head.pdf30 Jan 2024
Declaration in FORM BFile: Form B.pdf30 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Encumbrances.pdf30 Jan 2024
Deviation Report with respect to Allotment letterFile: No Devitaion.pdf30 Jan 2024
Deviation Report with respect to model copy of AgreementFile: No Devitaion.pdf30 Jan 2024
Proforma of Allotment letterFile: 7 Other - Legal.pdf29 Jan 2024
Layout approvalFile: Land Layout.pdf25 Jan 2024
Building plan approvalFile: Sanction Plan A - H.pdf25 Jan 2024
Building plan approvalFile: Sanction Plan I - P.pdf25 Jan 2024
Building plan approvalFile: Sanction Plan Q - X.pdf25 Jan 2024
Building plan approvalFile: Sanction Plan Y - PP.pdf25 Jan 2024
Building plan approvalFile: Sanction Plan QQ - ZZ.pdf25 Jan 2024
Building plan approvalFile: Sanction Plan Y - ZZ.pdf25 Jan 2024
Building plan approvalFile: Sanction plan Overall.pdf25 Jan 2024
Building plan approvalFile: Parking Sanction Plan.pdf25 Jan 2024
PAN CardFile: PAN.pdf25 Jan 2024
Copy of Layout Approval (in case of layout)File: Land Layout.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan A - H.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan I - P.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Q - X.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Y - PP.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan QQ - ZZ.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Y - ZZ.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction plan Overall.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Parking Sanction Plan.pdf25 Jan 2024

How this compares with Jalna

28%of this project is bookeddistrict median 0%
8%of Jalna projects moved their completion datethis one has not
41%of Jalna registrations have lapsed or been cancelledthis one is on the register

Computed across the 100+ Jalna projects on ReraGenie, from their own filings.

Keep Nandigram Township on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near At post Daregaon100+ in Jalna

Builder: Anandi Buildcon

Anandi Buildcon has 1 registration on MahaRERA, including Nandigram Township. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.

Frequently asked questions

What are my rights if Nandigram Township is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nandigram Township?

The registered promoter entity is Anandi Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nandigram Township?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nandigram Township?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nandigram Township?

The professionals named in the filing: Architect: AnandKumar Baburao Mhaske Mhaske; Engineer: GOPAL PRABHAKAR PAWAR PAWAR; Chartered Accountant: SABS & Associates; Chartered Accountant: R B Sharma & Co; Chartered Accountant: NARENDRA NAVANDAR & CO; Chartered Accountant: BSKY AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nandigram Township?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nandigram Township. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nandigram Township to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.