Home / Browse projects / Aurangabad, Maharashtra / RYANS RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

RYANS RESIDENCY

By G K SANCHETI (HUF)

RG-MH-08074 · RERA P51500017633 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 3 months past the filed date
  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
367 of 462Construction stages doneacross 42 buildings; furthest along: Podiums (if any), 0%
0 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

RYANS RESIDENCY is a Residential / Group Housing project by G K SANCHETI (HUF) in Aurangabad, Maharashtra, registered with MahaRERA as P51500017633 on 29 Aug 2018. Possession was promised by 31 Jul 2026 and is now 3 months past that date. The completion date has moved by 23 months from the original filing. 42 of the 42 units on this registration are recorded sold or booked, and 367 of 462 construction stages are filed complete.

At a glance

Project

  • NameRYANS RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • NANDGAON ROAD
    • SHIOOR
    • Vaijapur
    • Aurangabad
    • 431116
  • Pincode431116
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500017633
  • ReraGenie IDRG-MH-08074

Builder

  • NameG K SANCHETI (HUF)
  • Entity typeOthers
  • Named personGAUTAM KACHARDAS SANCHETI
  • Declared earlier projects1 →

Key dates

3 months past promisethis monthRegisteredAug 2018First promiseAug 2024Revised toJul 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Aug 2018
  • Promised completion31 Jul 2026
  • Revised completionRevised to 31 Jul 2026 (originally 29 Aug 2024)
  • Buildings42 building records
  • Documents filed70 files

Current status

100%42 of 42 units booked
129.0%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLOT NO 3 R H NO 3NA22101
PLOT NO 4 R H NO 4NA33101
PLOT NO 5 RH NO 5NA22101
PLOT NO 6 R H NO 6NA22101
PLOT NO 7 R H NO 7NA22101
PLOT NO 8 R H NO 8NA22101
PLOT NO 9 R H NO 9NA22101
PLOT NO 10 R H NO 10NA22101
PLOT NO 31 R H NO 31NA22101
PLOT NO 11 R H NO 11NA22101
PLOT NO 12 R H NO 12NA22101
PLOT NO 32 RH NO 32NA20101
PLOT NO 13 R H NO 13NA22101
PLOT NO 14 R H NO 14NA32101
PLOT NO 33 RH NO 33NA22101
PLOT NO 15 R H NO 15NA22101
PLOT NO 16 R H NO 16NA22101
PLOT NO 34 RH NO34NA22101
PLOT NO 17 R H NO 17NA22101
PLOT NO 18 R H NO 18NA22101
PLOT NO 19 R H NO 19NA22101
PLOT NO 35 R H NO 35NA22101
PLOT NO 20 R H NO 20NA22101
PLOT NO 21 R H NO 21NA22101
PLOT NO 36 R H NO 36NA22101
PLOT NO 22 R H NO 22NA22101
PLOT NO 23 R H NO 23NA22101
PLOT NO 37 R H NO 37NA22101
PLOT NO 24 R H NO 24NA22101
PLOT NO 38 RH NO 38NA22101
PLOT NO 25 R H NO 25NA22101
PLOT NO 27 R H NO 27NA22101
PLOT NO 26 R H NO 26NA22101
PLOT NO 39 RH NO 39NA22101
PLOT NO 40 RH NO 40NA22101
PLOT NO 41 RH NO 41NA22101
PLOT NO 42 RH NO 42NA22101
PLOT NO 43 RH NO 43NA22101
PLOT NO 28 R H NO 28NA22101
PLOT NO 29 R H NO 29NA22101
PLOT NO 30 R H NO 30NA22101
PLOT NO 44 RH NO 44NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 42 buildings; the table lists the first 20.

367 of 462 construction stages are filed complete across 42 buildings. The stage furthest along is Podiums (if any), at 0%.

PLOT NO 3 R H NO 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 4 R H NO 482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 5 RH NO 5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 6 R H NO 682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 7 R H NO 782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 8 R H NO 8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 9 R H NO 982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 10 R H NO 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 31 R H NO 3182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 11 R H NO 1182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 12 R H NO 1282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 32 RH NO 3282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 13 R H NO 1382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 14 R H NO 1482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 33 RH NO 3373%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PLOT NO 15 R H NO 1573%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PLOT NO 16 R H NO 1673%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PLOT NO 34 RH NO3482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PLOT NO 17 R H NO 1773%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PLOT NO 18 R H NO 1873%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered1
Open Space84
BuildingClosed/CoveredOpen SpaceTotal
PLOT NO 3 R H NO 3022
PLOT NO 4 R H NO 4123
PLOT NO 5 RH NO 5022
PLOT NO 6 R H NO 6022
PLOT NO 7 R H NO 7022
PLOT NO 8 R H NO 8022
PLOT NO 9 R H NO 9022
PLOT NO 10 R H NO 10022
PLOT NO 31 R H NO 31022
PLOT NO 11 R H NO 11022
PLOT NO 12 R H NO 12022
PLOT NO 32 RH NO 32022
PLOT NO 13 R H NO 13022
PLOT NO 14 R H NO 14022
PLOT NO 33 RH NO 33022
PLOT NO 15 R H NO 15022
PLOT NO 16 R H NO 16022
PLOT NO 34 RH NO34022
PLOT NO 17 R H NO 17022
PLOT NO 18 R H NO 18022
PLOT NO 19 R H NO 19022
PLOT NO 35 R H NO 35022
PLOT NO 20 R H NO 20022
PLOT NO 21 R H NO 21022
PLOT NO 36 R H NO 36022
PLOT NO 22 R H NO 22022
PLOT NO 23 R H NO 23022
PLOT NO 37 R H NO 37022
PLOT NO 24 R H NO 24022
PLOT NO 38 RH NO 38022
PLOT NO 25 R H NO 25022
PLOT NO 27 R H NO 27022
PLOT NO 26 R H NO 26022
PLOT NO 39 RH NO 39022
PLOT NO 40 RH NO 40022
PLOT NO 41 RH NO 41022
PLOT NO 42 RH NO 42022
PLOT NO 43 RH NO 43022
PLOT NO 28 R H NO 28022
PLOT NO 29 R H NO 29022
PLOT NO 30 R H NO 30022
PLOT NO 44 RH NO 44022

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGAR RACHNA ANI MULIYANIRDHARAN VIBHAG
Permissible FSI3804.82
Proposed, not sanctioned1,805 sq m
Buildings approved42
Buildings sanctioned42

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIOOR BUNGALOW
Estimated costRs 2.07 cr
Cost incurredRs 2.67 cr
Work done128.96%
BuildingWingEstimatedIncurred
PLOT NO 3 R H NO 3NARs 4.93 lakhRs 6.36 lakh
PLOT NO 4 R H NO 4NARs 4.93 lakhRs 6.36 lakh
PLOT NO 5 RH NO 5NARs 4.93 lakhRs 6.36 lakh
PLOT NO 6 R H NO 6NARs 4.93 lakhRs 6.36 lakh
PLOT NO 7 R H NO 7NARs 4.93 lakhRs 6.36 lakh
PLOT NO 8 R H NO 8NARs 4.93 lakhRs 6.36 lakh
PLOT NO 9 R H NO 9NARs 4.93 lakhRs 6.36 lakh
PLOT NO 10 R H NO 10NARs 4.93 lakhRs 6.36 lakh
PLOT NO 31 R H NO 31NARs 4.93 lakhRs 6.36 lakh
PLOT NO 11 R H NO 11NARs 4.93 lakhRs 6.36 lakh
PLOT NO 12 R H NO 12NARs 4.93 lakhRs 6.36 lakh
PLOT NO 32 RH NO 32NARs 4.93 lakhRs 6.36 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAKA ROHIT SUNIL
ArchitectMOHAMMED IMRAN SHAIKH
ArchitectSS CONSULTANTS
EngineerRAKA SUNIL MULCHAND
EngineerSS CONSULTANTS
Chartered AccountantBANGAD PARJANE & CO
PartnerRole in project
SANCHETI GAUTAM KACHARDAS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02032620055Aug 2024 → Jul 2026

Reason as filed by the promoterWe hereby request an extension of the project period for a further five months, i.e up to 31/07/2026. We would like to inform you that the project activities have been completed successfully. However, we are currently in the process of updating the Occupancy Certificate (OC), which requires additional time for formal completion and documentation. All Quarterly Progress Reports (QPRs) up to the date of the Occupancy Certificate have already been prepared and are ready for submission. We kindly request you to grant the required extension and enable the QPR submission tab, after which we shall pr

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jun 2026
Withdrawal Update Form 2File: form 2.pdf22 Jun 2026
Withdrawal Update Form 2File: form 2.pdf22 Jun 2026
Withdrawal Update Form 2File: form 2.pdf22 Jun 2026
Withdrawal Update Form 2File: form 2.pdf22 Jun 2026
Withdrawal Update Form 3File: CA 30-09-2024.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 .pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 .pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 .pdf22 Jun 2026
Form 1File: Form 1 31-03-19.pdf2 Jan 2026
Form 2File: Form 2 31-03-2019.pdf2 Jan 2026
Form 3File: CA 31-03-2019.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2019.pdf2 Jan 2026
Form 1File: Form 1 31-03-19.pdf2 Jan 2026
Form 2File: Form 2 31-03-2019.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2019.pdf2 Jan 2026
Form 3File: CA 31-03-2019.pdf2 Jan 2026
Form 1File: Form 1 31-03-19.pdf2 Jan 2026
Form 2File: Form 2 31-03-2019.pdf2 Jan 2026
Form 3File: CA 31-03-2019.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2019.pdf2 Jan 2026
Form 1File: Form 1 31-03-20.pdf2 Jan 2026
Form 2File: Form 2 31-03-2020.pdf2 Jan 2026
Form 3File: CA 31-03-2020.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2020.pdf2 Jan 2026
Form 1File: Form 1 31-03-21.pdf2 Jan 2026
Form 2File: Form 2 31-03-2021.pdf2 Jan 2026
Form 3File: CA 31-03-2021.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2021.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2022.pdf2 Jan 2026
Form 1File: Form 1 31-03-22.pdf2 Jan 2026
Form 2File: Form 2 31-03-2022.pdf2 Jan 2026
Form 3File: CA 31-03-2022.pdf2 Jan 2026
Form 1File: Form 1 31-03-23.pdf2 Jan 2026
Form 2File: Form 2 31-03-2023.pdf2 Jan 2026
Form 3File: CA 31-03-2023.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2023.pdf2 Jan 2026
Form 1File: Form 1 31-03-24.pdf2 Jan 2026
Form 2File: Form 2 31-03-2024.pdf2 Jan 2026
Form 3File: CA 31-03-2024.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2024.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-06-2024.pdf2 Jan 2026
Form 1File: Form 1 31-06-24.pdf2 Jan 2026
Form 2File: Form 2 30-06-2024.pdf2 Jan 2026
Form 3File: CA 30-06-2024.pdf2 Jan 2026
Form 1File: Form 1 31-09-24.pdf2 Jan 2026
Form 2File: Form 2 30-09-2024.pdf2 Jan 2026
Form 3File: CA 30-09-2024.pdf2 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-2024.pdf2 Jan 2026
Building plan approvalFile: 2ND SACTION PLAN 246.pdf8 Aug 2020
Building Plan Approval (IOD)File: 2ND SACTION PLAN 246.pdf8 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: 2DN ORDER.pdf8 Aug 2020
Certificates of CA (Form 3)File: 10 CA CERTIFICATE SHIOOR.pdf7 Aug 2018
Building plan approvalFile: 12 BUILDING PLAN SHIOOR 1.pdf4 Aug 2018
Layout approvalFile: 16 N A AND LAY OUT ORDER WITH PLAN.pdf4 Aug 2018
Building plan approvalFile: 12 BUILDING PLAN SHIOOR 2.pdf4 Aug 2018
Building plan approvalFile: 12 BUILDING PLAN SHIOOR 3.pdf4 Aug 2018
PAN CardFile: 2 PAN CARD G K SANCHETI SHIOOR.pdf4 Aug 2018
Copy of the legal title reportFile: 9 TITLE SEARCH REPORT SHIVOOR.pdf4 Aug 2018
Details of encumbrancesFile: 3 DETAILS OF ENCUMBRANCES SHIVOOR.pdf4 Aug 2018
Copy of Layout Approval (in case of layout)File: 16 N A AND LAY OUT ORDER WITH PLAN.pdf4 Aug 2018
Building Plan Approval (IOD)File: 12 BUILDING PLAN SHIOOR 1.pdf4 Aug 2018
Building Plan Approval (IOD)File: 12 BUILDING PLAN SHIOOR 2.pdf4 Aug 2018
Building Plan Approval (IOD)File: 12 BUILDING PLAN SHIOOR 3.pdf4 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: 8 COMMENCEMENT CERTIFICATE SHIVOOR.pdf4 Aug 2018
Declaration in FORM BFile: 1 DECLARATION IN FORM B SHIVOOR.pdf4 Aug 2018
Proforma of Allotment letterFile: 13 SAMPLE DRAFT FOR AGREEMENT TO SALE ALLOTMENT LETTER SHIOOR.pdf4 Aug 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
MAYUR RESIDENCYP51500006370BHOKARDAN, JalnaAug 2017CompletedSep 2022Registered original: Sep 2019Sep 2019

How this compares with Aurangabad

100%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 23 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep RYANS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIOOR1,400+ in Aurangabad

Builder: G K SANCHETI (HUF)

G K SANCHETI (HUF) has 1 registration on MahaRERA, including RYANS RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that RYANS RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RYANS RESIDENCY is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RYANS RESIDENCY?

The registered promoter entity is G K SANCHETI (HUF), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RYANS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RYANS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RYANS RESIDENCY?

The professionals named in the filing: Architect: RAKA ROHIT SUNIL; Architect: MOHAMMED IMRAN SHAIKH; Architect: SS CONSULTANTS; Engineer: RAKA SUNIL MULCHAND; Engineer: SS CONSULTANTS; Chartered Accountant: BANGAD PARJANE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RYANS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RYANS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RYANS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.