Home / Browse projects / Jalna, Maharashtra / SHREE SAI CITY PHASE-I
SHREE SAI CITY PHASE-I
By SHREE SAI CITY BUILDERS AND DEVELOPERS
RG-MH-01848 · RERA P51400008469 · Last updated on MahaRERA portal: 6 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 81 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE SAI CITY PHASE-I is a Residential / Group Housing project by SHREE SAI CITY BUILDERS AND DEVELOPERS in Jalna, Maharashtra, registered with MahaRERA as P51400008469 on 19 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 81 months from the original filing. 157 of the 247 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE SAI CITY PHASE-I
- TypeResidential / Group Housing
- Location
- S NO 63
- JALNA
- Jalna (M Cl)
- 431203
- Pincode431203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51400008469
- ReraGenie IDRG-MH-01848
Builder
- NameSHREE SAI CITY BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersSURESH RAOSAHEB SUPARKAR, GANESH RAOSAHEB SUPARKAR, RAMESH RAOSAHEB SUPARKAR
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Sep 2020)
- Buildings1 building record
- Documents filed186 files
Current status
Figures as on 6 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI CITY PHASE 1 | NA | 480 | 247 | 223 | 24 | 247 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 92%.
SAI CITY PHASE 1: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 92% |
| Podiums (if any) | 0% |
| Plinth | 75% |
| Stilt Floor | 73% |
| Slabs of Super Structure | 73% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 73% |
| Sanitary Fittings within the flats / premises | 73% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities15
As on 6 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 50% |
Parking filed240
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAI CITY PHASE 1 | NA | Rs 15.63 cr | Rs 7.58 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUDHAKAR SHITALCHAND DAHALE |
| Architect | SHRIKANT MAHAJAN |
| Engineer | ARFOZ KHAN |
| Engineer | HEMANT RAJMANE |
| Engineer | VISHAL PARSHARAM JAYBHAYE |
| Chartered Accountant | VAIJINATH DHANDE |
| Chartered Accountant | YASH NAGAR |
| Chartered Accountant | KEDAR KESHAV JOSHI |
| Partner | Role in project |
|---|---|
| SHREE SAI CITY BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterLack of Demand and Shortage of Fund
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed186
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 186 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2017-2018)File: 2A 19-20.pdf | 6 Mar 2026 |
| Form 2A (FY 2018-2019)File: 2A 19-20.pdf | 6 Mar 2026 |
| Form 5 (FY 2017-2018)File: FORM 5 1718.pdf | 6 Mar 2026 |
| Form 5 (FY 2018-2019)File: FORM 5 18-19.pdf | 6 Mar 2026 |
| Form 5 (FY 2019-2020)File: FORM 5 20-21.pdf | 6 Mar 2026 |
| Form 5 (FY 2020-2021)File: 2A 20-21.pdf | 6 Mar 2026 |
| Form 5 (FY 2021-2022)File: FORM 5 21-22.pdf | 6 Mar 2026 |
| Form 5 (FY 2022-2023)File: FORM 5 21-22.pdf | 6 Mar 2026 |
| Form 5 (FY 2023-2024)File: 1-4-2023 TO 31-03-2024.pdf | 6 Mar 2026 |
| Form 5 (FY 2024-2025)File: 1-4-2024 TO 31-3-2025.pdf | 6 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 5 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 5 Mar 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalna
Computed across the 100+ Jalna projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 186 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE SAI CITY PHASE-I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JALNA100+ in Jalna
VITTHALA TOWERS
TIRUPATI BUILDCON
JINDAL GOYAL SQUARE
JINDAL GOYAL REALITY LLP
Krishna Capital
Krishna Capital
Lalbag, Plotting
GO Developers LLP
RUKHMINI HEIGHTS
TIRUPATI INFRA JALNA
Anandi Business Complex
RIIVA BUILDERS AND DEVELOPERS LLP
See every Jalna project, with the district possession charts
Builder: SHREE SAI CITY BUILDERS AND DEVELOPERS
SHREE SAI CITY BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including SHREE SAI CITY PHASE-I and SHREE SAI CITY PHASE-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.
Frequently asked questions
What are my rights if SHREE SAI CITY PHASE-I is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE SAI CITY PHASE-I?
The registered promoter entity is SHREE SAI CITY BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE SAI CITY PHASE-I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE SAI CITY PHASE-I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE SAI CITY PHASE-I?
The professionals named in the filing: Architect: SUDHAKAR SHITALCHAND DAHALE; Architect: SHRIKANT MAHAJAN; Engineer: ARFOZ KHAN; Engineer: HEMANT RAJMANE; Engineer: VISHAL PARSHARAM JAYBHAYE; Chartered Accountant: VAIJINATH DHANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SAI CITY PHASE-I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback