Home / Browse projects / Palghar, Maharashtra / MATOSHRI HEIGHTS

Registered No litigation declared Residential / Group Housing project

MATOSHRI HEIGHTS

By NAGESH HEMANT PATIL

RG-MH-10224 · RERA P99000003089 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 58 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 58 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 90%
25 of 73Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

MATOSHRI HEIGHTS is a Residential / Group Housing project by NAGESH HEMANT PATIL in Palghar, Maharashtra, registered with MahaRERA as P99000003089 on 4 Aug 2017. Possession is promised by 31 Oct 2026. The completion date has moved by 58 months from the original filing. 48 of the 73 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameMATOSHRI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • JUCHANDRA
    • NAIGAON EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000003089
  • ReraGenie IDRG-MH-10224

Builder

  • NameNAGESH HEMANT PATIL
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed102 files

Current status

66%48 of 73 units booked
84.3%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MATOSHRI HEIGHTSNA9065873

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

MATOSHRI HEIGHTS: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes30%
Street LightingYes30%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered4
Open Space18

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI3550.74
Proposed, not sanctioned3,551 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRASHMI NAGAR, PHASE I BUILDING NO A 12 SHOP NO 5 6 7 8 JUCHANDRA ROAD NAIGAON EAST 401208
Estimated costRs 8.40 cr
Cost incurredRs 7.08 cr
Work done84.29%
BuildingWingEstimatedIncurred
MATOSHRI HEIGHTSNARs 7.60 crRs 6.84 cr
-NARs 80.00 lakhRs 24.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON
EngineerSanjay S Narang
EngineerVIMAL AGRAWAL
Chartered AccountantBHAKTI K MODY & ASSOCIATES
Chartered AccountantAAKASH R DADIA & CO
Chartered AccountantUmesh P Mestry
PartnerRole in project
NAGESH HEMANT PATIL-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012823Dec 2021 → Mar 2025

Reason as filed by the promoterTHE PROJECT LAND WAS AFFECTED BY WETLAND AS PER NATIONAL WETLAND ATLAS. KINDLY GRANT US THE PROJECT EXTENSION

EA17062501623Dec 2021 → Oct 2026

Reason as filed by the promoterEARLIER, THE PROJECT LAND WAS AFFECTED BY WETLAND AS PER NATIONAL WETLAND ATLAS. HOWEVER, WE WERE AFFECTED DUE TO DEATH OF PROMOTER AND HAD TO APPLY FOR CHANGE OF PROMOTER U/S 15. WE ARE NOW INTO FINAL STAGES OF COMPETION AND INTERNAL WORK SHALL BE COMPLETED BY 30/04/2026 AND EXTERNAL WORK BY 30/09/2026.THE PROJECT SHALL BE COMPLETED SURELY BY 31/10/2026. KINDLY GRANT US PROJECT EXTENSION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - FY 2024-25 Signed.pdf22 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25 VIMAL AGARWAL signed.pdf19 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26 VIMAL AGARWAL signed.pdf19 Jun 2026
Form 2A (FY 2018-2019)File: Form 2A FY 2018-19 signed.pdf19 Jun 2026
Form 2A (FY 2017-2018)File: Form 2A FY 2017-18 signed.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 Final.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf28 Apr 2026
Withdrawal Update Form 3File: FORM 3_Final.pdf28 Apr 2026
Withdrawal Update Form 1File: form-1.pdf19 Feb 2026
Withdrawal Update Form 1File: FORM-1.pdf19 Feb 2026
Withdrawal Update Form 2File: form-2.pdf19 Feb 2026
Withdrawal Update Form 2File: form-2 Q2.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM-3.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM-3.pdf19 Feb 2026
Form 1File: FORM 1 Dated 21-07-2023.pdf2 Jun 2025
Form 2File: FORM 2 Dated 21-07-2023.pdf2 Jun 2025
Form 3File: FORM 3 JUN23.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE23.pdf2 Jun 2025
Form 1File: FORM 1 Dated 30-09-2023.pdf2 Jun 2025
Form 2File: FORM 2 Dated 30-09-2023.pdf2 Jun 2025
Form 3File: FORM 3 SEP23.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP23.pdf2 Jun 2025
Form 1File: FORM 1 Dated 30-12-2023.pdf2 Jun 2025
Form 2File: FORM 2 Dated 30-12-2023.pdf2 Jun 2025
Form 3File: FORM 3 DEC23.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC23.pdf2 Jun 2025
Form 1File: FORM 1 Dated 23-03-2024.pdf2 Jun 2025
Form 2File: FORM 2 Dated 23-03-2024.pdf2 Jun 2025
Form 3File: FORM 3 MAR24.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNLSOLD MAR24.pdf2 Jun 2025
Form 1File: FORM 1 Dated 29-06-2024.pdf2 Jun 2025
Form 2File: FORM 2 Dated 29-06-2024.pdf2 Jun 2025
Form 3File: FORM 3 JUN24.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN24.pdf2 Jun 2025
Form 1File: FORM 1 Dated 30-09-2024.pdf2 Jun 2025
Form 2File: FORM 2 Dated 30-09-2024.pdf2 Jun 2025
Form 3File: FORM 3 SEP24.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP24.pdf2 Jun 2025
Form 1File: FORM 1 Dated 31-12-2024.pdf2 Jun 2025
Form 2File: FORM 2 Dated 31-12-2024.pdf2 Jun 2025
Form 3File: FORM 3 DEC24.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLDDEC24.pdf2 Jun 2025
Form 1File: FORM 1 Dated 31-03-2025.pdf2 Jun 2025
Form 2File: FORM 2 Dated 31-03-2025.pdf2 Jun 2025
Form 3File: FORM 3 MAR25.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR25.pdf2 Jun 2025
Form 2A (FY 2019-2020)File: FORM 2A F.Y. 2019-20.pdf2 Jun 2025
Form 2A (FY 2020-2021)File: FORM 2A F.Y. 2020-21.pdf2 Jun 2025
Form 2A (FY 2021-2022)File: FORM 2A F.Y. 2021-22.pdf2 Jun 2025
Form 2A (FY 2022-2023)File: FORM 2A F.Y. 2022-23.pdf2 Jun 2025
Form 2A (FY 2023-2024)File: FORM 2A F.Y. 2023-24.pdf2 Jun 2025
Form 5 (FY 2017-2018)File: FORM 5 F Y 2017-18.pdf2 Jun 2025
Form 5 (FY 2018-2019)File: FORM 5 F Y 2018-19.pdf2 Jun 2025
Form 5 (FY 2019-2020)File: FORM 5 F Y 2019-20.pdf2 Jun 2025
Form 5 (FY 2020-2021)File: FORM 5 F Y 2020-21.pdf2 Jun 2025
Form 5 (FY 2021-2022)File: FORM 5 F Y 2021-22.pdf2 Jun 2025
Form 5 (FY 2022-2023)File: FORM 5 F Y 2022-23.pdf2 Jun 2025
Form 5 (FY 2023-2024)File: FORM 5 F Y 2023-24.pdf2 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 15 FORM 5 - FY 21 - 22.pdf4 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 16 FORM 5 - FY 22 - 23.pdf4 Jun 2024
Declaration about Commencement CertificateFile: CC DECLARATION FINAL.pdf14 Jun 2023
Certificates of CA (Form 3)File: FORM 3 FINAL.pdf14 Jun 2023
Layout approvalFile: LAYOUT_11zon.pdf13 Apr 2023
Building plan approvalFile: BLDG PLAN 1_11zon.pdf13 Apr 2023
Building plan approvalFile: BLDG PLAN 1_11zon.pdf13 Apr 2023
Building plan approvalFile: BLDG PLAN 0_11zon.pdf13 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT_11zon.pdf13 Apr 2023
Building Plan Approval (IOD)File: BLDG PLAN 1_11zon.pdf13 Apr 2023
Building Plan Approval (IOD)File: BLDG PLAN 1_11zon.pdf13 Apr 2023
Building Plan Approval (IOD)File: BLDG PLAN 0_11zon.pdf13 Apr 2023
Declaration about Commencement CertificateFile: CC DECLARATION.pdf13 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2.pdf13 Apr 2023
Certificates of CA (Form 3)File: FORM 3 NEW.pdf13 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf1 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf1 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2.pdf1 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_11.pdf17 Nov 2022

How this compares with Palghar

66%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 58 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MATOSHRI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAIGAON EAST3,200+ in Palghar

2 kmMATOSHRI HEIGHTSCompleted 35Lapsed / revoked 17Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: NAGESH HEMANT PATIL

NAGESH HEMANT PATIL has 1 registration on MahaRERA, including MATOSHRI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if MATOSHRI HEIGHTS is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MATOSHRI HEIGHTS?

The registered promoter entity is NAGESH HEMANT PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MATOSHRI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MATOSHRI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MATOSHRI HEIGHTS?

The professionals named in the filing: Architect: ENCON; Engineer: Sanjay S Narang; Engineer: VIMAL AGRAWAL; Chartered Accountant: BHAKTI K MODY & ASSOCIATES; Chartered Accountant: AAKASH R DADIA & CO; Chartered Accountant: Umesh P Mestry. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MATOSHRI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MATOSHRI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MATOSHRI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.