MARVEL AQUANAS
By MARVEL REALTORS AND DEVELOPERS LTD
RG-MH-09304 · RERA P52100001521 · Last updated on MahaRERA portal: 13 Aug 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 31 months past the filed date
- 22 complaints at MahaRERA
- Completion date moved by 51 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARVEL AQUANAS is a Residential / Group Housing project by MARVEL REALTORS AND DEVELOPERS LTD in KHARADI, 411014, registered with MahaRERA as P52100001521 on 28 Jul 2017. Possession was promised by 31 Mar 2024 and is now 31 months past that date. The completion date has moved by 51 months from the original filing. 76 of the 82 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 22 complaints are on record with the regulator.
At a glance
Project
- NameMARVEL AQUANAS
- TypeResidential / Group Housing
- Location
- S.No. 69 / 4 (P) + S.No. 69 / 5 (P)
- KHARADI
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100001521
- ReraGenie IDRG-MH-09304
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Jul 2017
- Promised completion31 Mar 2024
- Revised completionRevised to 31 Mar 2024 (originally 31 Dec 2019)
- Buildings2 building records
- Documents filed135 files
Current status
Figures as on 13 Aug 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 26 | 22 | 41 | 0 | 41 |
| B | NA | 26 | 22 | 41 | 0 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.
A76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
B76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities16
As on 13 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 30% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Open Spaces | Yes | 80% |
Parking filed140
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A | 74 | 74 |
| B | 66 | 66 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CHAITANYA KAMAL INFRACON LLP | Mumbai City | Mumbai City |
| C N SANGHAVI AND CO (FORWARDS) PVT LTD | Mumbai City | Mumbai City |
| IDEAL PRIME REALTORS LLP | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CATALYSER DESIGN |
| Architect | RAHUL MALWADKAR |
| Engineer | AVINASH MATE |
| Chartered Accountant | AKSHAT SUNIL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MARVEL REALTORS AND DEVELOPERS LTD | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. That there are two residential buildings in the project namely ‘Marvel Aquanas’. The construction of the buildings are completed near about 80 to 83 % and only the internal construction and finishing works is pending. Considering the pending work, in November 2022, the extension of the project was applied with consent of the allottees and the extension was granted till 30/04/2023 by the Hon’ble Authority. 2. Further, a Company Petition (IB) 646/MB/2022 was filed by IDFC First Bank Limited against Marvel Realtors and Developers Limited before the Hon’ble National Company Law Tribunal, Mumbai
Reason as filed by the promoterThe project, namely Marvel Aquanus, comprising of 82 flats (i.e. Sold units - 54 and Unsold units - 28). We have completed 90 % of the work, and some work is remaining due to an unavoidable situation, which we as a Promoter undertakes to expedite. We require time to complete the remaining work and apply for the Completion Certificate, thus seeking an extension until 31/10/2022. Consent for an extension of project registration has been taken from 51% of the allottees. We are requesting to permit us to extend the project registration.
Reason as filed by the promoterDelay due to covid and other unavoidable reasons
Reason as filed by the promoterAdverse market condition and money dismemberment issue form bank
Complaints filed with MahaRERA22
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000010472 | Priya Eidnani | Marvel Realtors | 03/11/2017 |
| CC005000000011069 | Priya Eidnani | Vishwajeet Jhavar | 04/03/2018 |
| CC005000000011446 | Asheet Pasricha and Ors | Marvel Promoters and Developers (Pune) Pvt Ltd | 20/04/2018 |
| CC005000000023365 | Mrs. Arnaz Gautam Dembla | Marvel promoters and developers pune pvt ltd and others | 25/08/2019 |
| CC005000000023366 | Sujata A Mangharam | marvel promoters and developers pune pvt ltd | 25/08/2019 |
| CC005000000023368 | srinivasa rao duddupudi | marvel promoters and developers pune pvt ltd and others | 25/08/2019 |
| CC005000000023395 | Marvel Aquanas Cooperative Housing Society Limited through secretary | Marvel Promoters and Developers Pune Pvt Ltd and Others | 04/09/2019 |
| CC005000000064253 | SAPNA RATAN | Marvel Realtors and Developers Limited | 08/06/2020 |
| CC005000000064257 | SURESH BHIMRAO DESHMUKH | Marvel Realtors and Developers Limited | 09/06/2020 |
| CC005000000064259 | RAJESH RAJAN OVALEKAR | Marvel Realtors and Developers Limited | 10/06/2020 |
| CC005000000064260 | MARVEL ACQUANAS COOPERATIVE HOUSING SOCIETY LIMITED | Marvel Realtors and Developers Ltd. | 10/06/2020 |
| CC005000000075129 | Chaitanya Kamal Infracon LLP | Marvel Realtors and Developers Ltd. | 28/01/2021 |
| CC005000000022770 | SADHNA RAJANI | MARVEL PROPERTERS AND DEVELOPER | 09/03/2019 |
| CC005000000022945 | RAJKUMAR RAJABHAU SHINDE | MARVEL PROMOTERS AND DEVELOPERS (PUNE) PVT LTD | 25/05/2019 |
| CC005000000054158 | Sameer Jabbar Sayed | Marvel Promoters and Developers (Pune) Pvt. Ltd, | 17/03/2020 |
| CC005000000085534 | MARVEL ACQUANAS COOPERATIVE HOUSING SOCIETY LTD | MARVELPROMOTERS AND DEVELOPERS (PUNE) PVT LTD., | 10/05/2021 |
| CC005000000269342 | MARVEL CHSL | Marvel Realtors and Developers Pvt Ltd | 25/08/2023 |
| CC005000000471314 | MARVEL CHSL | MARVEL REALTORS AND DEVELOPERS LTD | 17/07/2024 |
| CC005000000106512 | Smt. Neelam Sushil Kapur | Marvel Promoters and Developers (Pune) Pvt. Ltd | 19/01/2022 |
| CC005000000106767 | Grishmi Deepak Ghodke | Marvel Realtors and Developers | 16/03/2022 |
| CC005000000167398 | Marvel Realtors and Developers Limited | Mrs. Sadhana Ashokkumar Rajani Through her Constituted POA Mr. Vikas Pawar | 26/07/2022 |
| CC005000000167582 | Santosh Sethuraman | Marvel Realtors and Developers Ltd., | 15/09/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed135
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 Form 1 31-03-2020.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 Form-1-31-03-21.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 03 Form 1-31-12-21.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 04 Form 1 31-03-22.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 Form-1-30-06-22.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 06 Form-1-30-09-22.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07 Form 1-31-12-22.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 08 Form 1-31-03-23.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 09 Form 1-31-06-23.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Form-1-31-12-23.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Form 1 31-03-24.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Form 2-31-03-2018.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Form 2-31-03-2019.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Form 2-31-03-20.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Form 2-31-03-21.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 Form-2 31-12-21.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Form 2-31-03-22.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 Form 2-30-06-22.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 08 Form 2 30-09-22.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 09 Form 2-31-12-22.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Form-2-31-03-23.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Form 2- 30-06-23.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Form 2-31-12-23.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Form 1-31-03-24.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- (2023-2024).pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: 01 SoldUnsold-31-3-23.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: 02 SoldUnsold-30-06-23.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: 03 SoldUnsold 30-09-23.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: 04 SoldUnsold-30-12-23.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: 05 SoldUnsold-31-3-24.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2017-18.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2017-18.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2017-18.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2017-18.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2018-19.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2018-19.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2018-19.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2018-19.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2019-20.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2019-20.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2019-20.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2019-20.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2020-21.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2020-21.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2020-21.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2020-21.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2021-22.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2021-22.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2021-22.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2021-22.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2022-23.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2022-23.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2022-23.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2022-23.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2023-24.PDF | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2023-24.PDF | 3 Aug 2024 |
| Declaration about Commencement CertificateFile: Format D_Declaration about Commencement.PDF | 6 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_26092023191051.PDF | 6 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate.PDF | 6 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 -A_26092023191122.PDF | 6 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold unsold inventory.PDF | 6 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200282743113_For_Asset_Based_Search_06_10_2023_15_36_50_843.pdf | 6 Oct 2023 |
| Certificates of CA (Form 3)File: Form-3 _30-06-2023.PDF | 6 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3_30-09-2023.PDF | 6 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _Rera Certificate_For FY 22-23.pdf | 6 Oct 2023 |
| Declaration about Commencement CertificateFile: Form D Declaration About Commencement.PDF | 20 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Engineer's Certificate for Quality Assurance.PDF | 20 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.PDF | 20 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Rera Certificates _for FY 17-18 (2).pdf | 20 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Rera Certificates _for FY 18-19 (2).pdf | 20 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Rera Certificates _for FY 19-20 (2).pdf | 20 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rera Certificates _for FY 20-21.pdf | 20 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Rera Certificates _for FY 21-22.pdf | 20 Dec 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Marvel Aquanas Project.pdf | 15 Feb 2022 |
| Details of encumbrancesFile: Encumbrance certificate.pdf | 2 Feb 2022 |
| CERSAI detailsFile: Asset Based Cersai Report.pdf | 25 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Aquanas_Sold Unsold_11 January.pdf | 25 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Aquanas_Sold Unsold_11 January.pdf | 14 Jan 2022 |
| CERSAI detailsFile: Asset Based Cersai Report.pdf | 14 Jan 2022 |
| Declaration about Commencement CertificateFile: Form D_DOCC.pdf | 12 Jan 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MARVEL SORRENTO | SR NO 34 HISSA NO 2 BANER PUNE | 14 | Completed | Mar 2016 | Mar 2016 |
| MARVEL SONNET | PLOT NO 105 A SR NO 199 LOHEGOAN PUNE | 6 | Completed | Jan 2015 | Mar 2013 |
| MARVEL CORONET | FINAL PLOT 235 GHORPADI PUNE | 5 | Completed | Jan 2012 | Dec 2011 |
| MARVEL RITZ | SR NO 171 HISSA NO 1A HADAPSAR PUNE | 126 | Completed | Jun 2011 | Dec 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 135 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MARVEL AQUANAS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARADI
Filed coordinates, straight-line distance. 65 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: MARVEL REALTORS AND DEVELOPERS LTD
MARVEL REALTORS AND DEVELOPERS LTD has 7 registrations on MahaRERA, including MARVEL CERISE Bldg-A and MARVEL CERISE BLDG B, C, D. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that MARVEL AQUANAS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MARVEL AQUANAS is delayed beyond 31 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARVEL AQUANAS?
The registered promoter entity is MARVEL REALTORS AND DEVELOPERS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARVEL AQUANAS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARVEL AQUANAS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARVEL AQUANAS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARVEL AQUANAS?
The professionals named in the filing: Architect: CATALYSER DESIGN; Architect: RAHUL MALWADKAR; Engineer: AVINASH MATE; Chartered Accountant: AKSHAT SUNIL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARVEL AQUANAS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback