MARVEL AQUANAS

By MARVEL REALTORS AND DEVELOPERS LTD

RG-MH-09304 · RERA P52100001521 · Last updated on MahaRERA portal: 13 Aug 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • 22 complaints at MahaRERA
  • Completion date moved by 51 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2024Possession promised31 months past this date
10 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
6 of 82Units unsoldnot recorded sold or booked
22Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

MARVEL AQUANAS is a Residential / Group Housing project by MARVEL REALTORS AND DEVELOPERS LTD in KHARADI, 411014, registered with MahaRERA as P52100001521 on 28 Jul 2017. Possession was promised by 31 Mar 2024 and is now 31 months past that date. The completion date has moved by 51 months from the original filing. 76 of the 82 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 22 complaints are on record with the regulator.

At a glance

Project

  • NameMARVEL AQUANAS
  • TypeResidential / Group Housing
  • Location
    • S.No. 69 / 4 (P) + S.No. 69 / 5 (P)
    • KHARADI
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001521
  • ReraGenie IDRG-MH-09304

Builder

  • NameMARVEL REALTORS AND DEVELOPERS LTD
  • Entity typeCompany
  • Managing DirectorVISHWAJEET SUBHASH JHAVAR
  • Other registrations6 more →
  • Completed6 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

31 months past promisethis monthRegisteredJul 2017First promiseDec 2019Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Jul 2017
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed135 files

Current status

93%76 of 82 units booked

Figures as on 13 Aug 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA262241041
BNA262241041

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

A76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
B76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities16

As on 13 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Open SpacesYes80%

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered140
BuildingClosed/CoveredTotal
A7474
B6666

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,038 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
CHAITANYA KAMAL INFRACON LLPMumbai CityMumbai City
C N SANGHAVI AND CO (FORWARDS) PVT LTDMumbai CityMumbai City
IDEAL PRIME REALTORS LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI17665.81
Proposed, not sanctioned14,366 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMAN NAGAR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCATALYSER DESIGN
ArchitectRAHUL MALWADKAR
EngineerAVINASH MATE
Chartered AccountantAKSHAT SUNIL & ASSOCIATES
PartnerRole in project
MARVEL REALTORS AND DEVELOPERS LTD-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017703Dec 2019 → Mar 2024

Reason as filed by the promoter1. That there are two residential buildings in the project namely ‘Marvel Aquanas’. The construction of the buildings are completed near about 80 to 83 % and only the internal construction and finishing works is pending. Considering the pending work, in November 2022, the extension of the project was applied with consent of the allottees and the extension was granted till 30/04/2023 by the Hon’ble Authority. 2. Further, a Company Petition (IB) 646/MB/2022 was filed by IDFC First Bank Limited against Marvel Realtors and Developers Limited before the Hon’ble National Company Law Tribunal, Mumbai

EXT52100011312Dec 2019 → Oct 2022

Reason as filed by the promoterThe project, namely Marvel Aquanus, comprising of 82 flats (i.e. Sold units - 54 and Unsold units - 28). We have completed 90 % of the work, and some work is remaining due to an unavoidable situation, which we as a Promoter undertakes to expedite. We require time to complete the remaining work and apply for the Completion Certificate, thus seeking an extension until 31/10/2022. Consent for an extension of project registration has been taken from 51% of the allottees. We are requesting to permit us to extend the project registration.

EXT52100012903Dec 2019 → Apr 2023

Reason as filed by the promoterDelay due to covid and other unavoidable reasons

EXT52100005111Dec 2019 → Dec 2020

Reason as filed by the promoterAdverse market condition and money dismemberment issue form bank

Complaints filed with MahaRERA22

Case no.ComplainantRespondentFiled
CC005000000010472Priya EidnaniMarvel Realtors03/11/2017
CC005000000011069Priya EidnaniVishwajeet Jhavar04/03/2018
CC005000000011446Asheet Pasricha and OrsMarvel Promoters and Developers (Pune) Pvt Ltd20/04/2018
CC005000000023365Mrs. Arnaz Gautam DemblaMarvel promoters and developers pune pvt ltd and others25/08/2019
CC005000000023366Sujata A Mangharammarvel promoters and developers pune pvt ltd25/08/2019
CC005000000023368srinivasa rao duddupudimarvel promoters and developers pune pvt ltd and others25/08/2019
CC005000000023395Marvel Aquanas Cooperative Housing Society Limited through secretaryMarvel Promoters and Developers Pune Pvt Ltd and Others04/09/2019
CC005000000064253SAPNA RATANMarvel Realtors and Developers Limited08/06/2020
CC005000000064257SURESH BHIMRAO DESHMUKHMarvel Realtors and Developers Limited09/06/2020
CC005000000064259RAJESH RAJAN OVALEKARMarvel Realtors and Developers Limited10/06/2020
CC005000000064260MARVEL ACQUANAS COOPERATIVE HOUSING SOCIETY LIMITEDMarvel Realtors and Developers Ltd.10/06/2020
CC005000000075129Chaitanya Kamal Infracon LLPMarvel Realtors and Developers Ltd.28/01/2021
CC005000000022770SADHNA RAJANIMARVEL PROPERTERS AND DEVELOPER09/03/2019
CC005000000022945RAJKUMAR RAJABHAU SHINDEMARVEL PROMOTERS AND DEVELOPERS (PUNE) PVT LTD25/05/2019
CC005000000054158Sameer Jabbar SayedMarvel Promoters and Developers (Pune) Pvt. Ltd,17/03/2020
CC005000000085534MARVEL ACQUANAS COOPERATIVE HOUSING SOCIETY LTDMARVELPROMOTERS AND DEVELOPERS (PUNE) PVT LTD.,10/05/2021
CC005000000269342MARVEL CHSLMarvel Realtors and Developers Pvt Ltd25/08/2023
CC005000000471314MARVEL CHSLMARVEL REALTORS AND DEVELOPERS LTD17/07/2024
CC005000000106512Smt. Neelam Sushil KapurMarvel Promoters and Developers (Pune) Pvt. Ltd19/01/2022
CC005000000106767Grishmi Deepak GhodkeMarvel Realtors and Developers16/03/2022
CC005000000167398Marvel Realtors and Developers LimitedMrs. Sadhana Ashokkumar Rajani Through her Constituted POA Mr. Vikas Pawar26/07/2022
CC005000000167582Santosh SethuramanMarvel Realtors and Developers Ltd.,15/09/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 Form 1 31-03-2020.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 Form-1-31-03-21.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 03 Form 1-31-12-21.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 04 Form 1 31-03-22.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 Form-1-30-06-22.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 06 Form-1-30-09-22.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07 Form 1-31-12-22.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 08 Form 1-31-03-23.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 09 Form 1-31-06-23.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Form-1-31-12-23.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Form 1 31-03-24.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Form 2-31-03-2018.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Form 2-31-03-2019.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Form 2-31-03-20.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Form 2-31-03-21.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 Form-2 31-12-21.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Form 2-31-03-22.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 Form 2-30-06-22.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 08 Form 2 30-09-22.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 09 Form 2-31-12-22.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Form-2-31-03-23.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Form 2- 30-06-23.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Form 2-31-12-23.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Form 1-31-03-24.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- (2023-2024).pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: 01 SoldUnsold-31-3-23.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: 02 SoldUnsold-30-06-23.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: 03 SoldUnsold 30-09-23.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: 04 SoldUnsold-30-12-23.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: 05 SoldUnsold-31-3-24.pdf13 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2017-18.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2017-18.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2017-18.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2017-18.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2018-19.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2018-19.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2018-19.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2018-19.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2019-20.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2019-20.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2019-20.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2019-20.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2020-21.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2020-21.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2020-21.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2020-21.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2021-22.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2021-22.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2021-22.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2021-22.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-1_2022-23.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-2_2022-23.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2022-23.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2022-23.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-3_2023-24.PDF3 Aug 2024
Certificates of CA (Form 3)File: Aquanas_Form 3_Qtr-4_2023-24.PDF3 Aug 2024
Declaration about Commencement CertificateFile: Format D_Declaration about Commencement.PDF6 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_26092023191051.PDF6 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate.PDF6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 -A_26092023191122.PDF6 Oct 2023
Disclosure of sold/ booked inventoryFile: Discolsure of sold unsold inventory.PDF6 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200282743113_For_Asset_Based_Search_06_10_2023_15_36_50_843.pdf6 Oct 2023
Certificates of CA (Form 3)File: Form-3 _30-06-2023.PDF6 Oct 2023
Certificates of CA (Form 3)File: Form 3_30-09-2023.PDF6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _Rera Certificate_For FY 22-23.pdf6 Oct 2023
Declaration about Commencement CertificateFile: Form D Declaration About Commencement.PDF20 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Engineer's Certificate for Quality Assurance.PDF20 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold.PDF20 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Rera Certificates _for FY 17-18 (2).pdf20 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Rera Certificates _for FY 18-19 (2).pdf20 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Rera Certificates _for FY 19-20 (2).pdf20 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rera Certificates _for FY 20-21.pdf20 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Rera Certificates _for FY 21-22.pdf20 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Marvel Aquanas Project.pdf15 Feb 2022
Details of encumbrancesFile: Encumbrance certificate.pdf2 Feb 2022
CERSAI detailsFile: Asset Based Cersai Report.pdf25 Jan 2022
Disclosure of sold/ booked inventoryFile: Aquanas_Sold Unsold_11 January.pdf25 Jan 2022
Disclosure of sold/ booked inventoryFile: Aquanas_Sold Unsold_11 January.pdf14 Jan 2022
CERSAI detailsFile: Asset Based Cersai Report.pdf14 Jan 2022
Declaration about Commencement CertificateFile: Form D_DOCC.pdf12 Jan 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MARVEL SORRENTOSR NO 34 HISSA NO 2 BANER PUNE14CompletedMar 2016Mar 2016
MARVEL SONNETPLOT NO 105 A SR NO 199 LOHEGOAN PUNE6CompletedJan 2015Mar 2013
MARVEL CORONETFINAL PLOT 235 GHORPADI PUNE5CompletedJan 2012Dec 2011
MARVEL RITZSR NO 171 HISSA NO 1A HADAPSAR PUNE126CompletedJun 2011Dec 2010

Keep MARVEL AQUANAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI

2 kmMARVEL AQUANASCompleted 36Lapsed / revoked 16Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: MARVEL REALTORS AND DEVELOPERS LTD

MARVEL REALTORS AND DEVELOPERS LTD has 7 registrations on MahaRERA, including MARVEL CERISE Bldg-A and MARVEL CERISE BLDG B, C, D. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record.

Frequently asked questions

What does it mean that MARVEL AQUANAS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MARVEL AQUANAS is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARVEL AQUANAS?

The registered promoter entity is MARVEL REALTORS AND DEVELOPERS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARVEL AQUANAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARVEL AQUANAS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MARVEL AQUANAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARVEL AQUANAS?

The professionals named in the filing: Architect: CATALYSER DESIGN; Architect: RAHUL MALWADKAR; Engineer: AVINASH MATE; Chartered Accountant: AKSHAT SUNIL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARVEL AQUANAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARVEL AQUANAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARVEL AQUANAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.