Home / Browse projects / Mumbai Suburban, Maharashtra / MARATHON NEOVALLEY NARMADA WING C
MARATHON NEOVALLEY NARMADA WING C
By M/S NEXZONE FISCAL SERVICES PVT LTD
RG-MH-86778 · RERA P51800081112 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON NEOVALLEY NARMADA WING C is a Residential / Group Housing project by M/S NEXZONE FISCAL SERVICES PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800081112 on 18 Mar 2026. Possession is promised by 31 Dec 2029. 0 of the 166 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameMARATHON NEOVALLEY NARMADA WING C
- TypeResidential / Group Housing
- Location
- tembi pada road
- bhandup
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- RERA no.P51800081112
- ReraGenie IDRG-MH-86778
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Mar 2026
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEOVALLEY NARMADA WING C | NA | 22 | 22 | 166 | 0 | 166 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
NEOVALLEY NARMADA WING C: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR SANTOSHKUMAR DUBEY |
| Architect | SANTOSH PREMCHAND DUBEY |
| Engineer | GURRUNATH S DHAVANN |
| Engineer | URVESH VIRENDRA MEHTA |
| Chartered Accountant | DINESH GANPAT PAI |
| Chartered Accountant | Preeti Singh |
| Chartered Accountant | DINESH PAI |
| Partner | Role in project |
|---|---|
| M/S NEXZONE FISCAL SERVICES PVT LTD | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600343 | Bhakti Achrekar | M/S NEXZONE FISCAL SERVICES PVT LTD | 22/05/2026 |
| SM12600356 | Bhakti Achrekar | M/S NEXZONE FISCAL SERVICES PVT LTD | 26/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Mar 2026 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Q1_AC_Form-1_Narmada C Wing_2026.pdf | 17 Jul 2026 |
| Form 2File: Form 2 Engg CertiNARMADA (Wing C) June 2026.pdf | 17 Jul 2026 |
| Form 3File: Form 3 RERA Narmada C Wing Jun 26.pdf | 17 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Jun 2026.pdf | 17 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Narmada C wing.pdf | 13 May 2026 |
| Form 1File: Q4_AC_Form-1_Narmada C Wing_2026.pdf | 7 May 2026 |
| Form 2File: Form 2 Engg Certificate NEOVALLEY NARMADA Wing C Mar 2026.pdf | 7 May 2026 |
| Form 3File: Form 3 CA Cert Narmada C Wing Mar 26.pdf | 7 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Invetory Mar 2026 sign.pdf | 7 May 2026 |
| Other - FinanceFile: DocScanner 18 Mar 2026 15-07.pdf | 18 Mar 2026 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISCOLSER FOR SECURED NMD.pdf | 18 Mar 2026 |
| Other - TechnicalFile: ilovepdf_merged.pdf | 16 Mar 2026 |
| Copy of the legal title reportFile: FLOW OF THE TITLE OF THE SAID PLOT.pdf | 13 Mar 2026 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE.pdf | 13 Mar 2026 |
| Other - LegalFile: revised Allotment letter- Narmada Wing C (Resi)_final-pdf.pdf | 13 Mar 2026 |
| Other - LegalFile: revised Deviation Report_Allotment letter_Narmada Wing C (Resi)_final-pdf.pdf | 13 Mar 2026 |
| Other - LegalFile: AFSV deviation clauses highlighted_Neovalley Narmada Wing C (Resi)_1203026.pdf | 13 Mar 2026 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATE.pdf | 13 Mar 2026 |
| Other - FinanceFile: FORAMT A.pdf | 13 Mar 2026 |
| Other - FinanceFile: Disclosure for Secured Finance_Narmada Wing C (1).pdf | 13 Mar 2026 |
| Other - FinanceFile: Disclosure for Secured Finance_Narmada Wing C (1).pdf | 13 Mar 2026 |
| Other - TechnicalFile: Revised Form B Neovalley Narmada Wing C_Notarized_1203026.pdf | 13 Mar 2026 |
| Other - TechnicalFile: Architect-Letter.pdf | 13 Mar 2026 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report AFS for Neovalley Narmada Wing C Resi _1303026_11zon.pdf | 14 Jan 2026 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 20260114032406.pdf | 14 Jan 2026 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 20260114032304.pdf | 14 Jan 2026 |
| Other - TechnicalFile: Form 03 Neovalley Narmada C Wing Rera Certificate.pdf | 22 Dec 2025 |
| Other - TechnicalFile: 17122025 Further C C of Sale wing B.pdf | 18 Dec 2025 |
| CERSAI detailsFile: 20251202035016.pdf | 2 Dec 2025 |
| Other - LegalFile: 66-RERA_KRL1-1504-2018_PART-4.pdf | 14 Jul 2025 |
| Other - LegalFile: 73-RERA_PRC.pdf | 14 Jul 2025 |
| Other - LegalFile: 72-RERA_7-12_124-127-134.pdf | 14 Jul 2025 |
| Other - LegalFile: 71-RERA_KRL4-11720-2021.pdf | 14 Jul 2025 |
| Other - LegalFile: 70-RERA_KRL1-1504-2018_PART-8.pdf | 14 Jul 2025 |
| Other - LegalFile: 69-RERA_KRL1-1504-2018_PART-7.pdf | 14 Jul 2025 |
| Other - LegalFile: 68-RERA_KRL1-1504-2018_PART-6.pdf | 14 Jul 2025 |
| Other - LegalFile: 67-RERA_KRL1-1504-2018_PART-5.pdf | 14 Jul 2025 |
| Other - LegalFile: 65-RERA_KRL1-1504-2018_PART-3.pdf | 14 Jul 2025 |
| Other - LegalFile: 64-RERA_KRL1-1504-2018_PART-2.pdf | 14 Jul 2025 |
| Other - LegalFile: 63-RERA_KRL1-1504-2018_PART-1.pdf | 14 Jul 2025 |
| Other - LegalFile: 62-RERA_KRL1-10377-2017_PART-8.pdf | 14 Jul 2025 |
| Other - LegalFile: 61-RERA_KRL1-10377-2017_PART-7.pdf | 14 Jul 2025 |
| Other - LegalFile: 60-RERA_KRL1-10377-2017_PART-6.pdf | 14 Jul 2025 |
| Other - LegalFile: 58-RERA_KRL1-10377-2017_PART-4.pdf | 14 Jul 2025 |
| Other - LegalFile: 59-RERA_KRL1-10377-2017_PART-5.pdf | 14 Jul 2025 |
| Other - LegalFile: 49-RERA_KRL2-9420-2016_PART-1.pdf | 14 Jul 2025 |
| Other - LegalFile: 50-RERA_KRL2-9420-2016_PART-2.pdf | 14 Jul 2025 |
| Other - LegalFile: 51-RERA_KRL2-9420-2016_PART-3.pdf | 14 Jul 2025 |
| Other - LegalFile: 52-RERA_KRL1-10380-2017_PART-1.pdf | 14 Jul 2025 |
| Other - LegalFile: 53-RERA_KRL1-10380-2017_PART-2.pdf | 14 Jul 2025 |
| Other - LegalFile: 54-RERA_KRL1-10380-2017_PART-3.pdf | 14 Jul 2025 |
| Other - LegalFile: 55-RERA_KRL1-10377-2017_PART-1.pdf | 14 Jul 2025 |
| Other - LegalFile: 56-RERA_KRL1-10377-2017_PART-2.pdf | 14 Jul 2025 |
| Other - LegalFile: 57-RERA_KRL1-10377-2017_PART-3.pdf | 14 Jul 2025 |
| Other - TechnicalFile: 75-RERA_CC_Confirmation to RERA Email.pdf | 14 Jul 2025 |
| Other - TechnicalFile: 76-RERA_Annexure-A_Declaration cum undertaking as per order 50_22-05-24.pdf | 14 Jul 2025 |
| Other - TechnicalFile: 77-RERA_Parking Details.pdf | 14 Jul 2025 |
| Copy of the legal title reportFile: 2 Legal Title certficate.pdf | 11 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: 4 No Encumbrance certifcate o the said plot by finace.pdf | 11 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: 5 No Encumbrance certifcate o the said plot by legal.pdf | 11 Jul 2025 |
| Declaration in FORM BFile: 15 Revised Form B_Neovalley Narmada Wing C_Notarized.pdf | 11 Jul 2025 |
| Details of encumbrances concerned to LegalFile: 4 No Encumbrance certifcate o the said plot by finace.pdf | 11 Jul 2025 |
| Details of encumbrances concerned to LegalFile: 5 No Encumbrance certifcate o the said plot by legal.pdf | 11 Jul 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 24 Declaration - Narmada C.pdf | 11 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORAMT A NMD.pdf | 28 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORAMT B NMD_merged.pdf | 28 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf | 28 Apr 2025 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 21 Apr 2025 |
| Layout approvalFile: Layout Approval.pdf | 10 Apr 2025 |
| Building plan approvalFile: 1 Building Plan Approval.pdf | 10 Apr 2025 |
| Building plan approvalFile: 2 Building Plan Approval.pdf | 10 Apr 2025 |
| Building plan approvalFile: 3 Building Plan Approval.pdf | 10 Apr 2025 |
| Building plan approvalFile: 2 Layout Approval.pdf | 10 Apr 2025 |
| PAN CardFile: PAN CARD.pdf | 10 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 10 Apr 2025 |
| Proforma of Allotment letterFile: 38 Allotment letter-deviation clauses highlighted_Narmada Wing C_final_pdf.pdf | 10 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16 Q1_AC_Form-1_Narmada C Wing_2025.pdf | 10 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 17-03-26.pdf | 10 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate.pdf | 10 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates.pdf | 10 Apr 2025 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| MARATHON NEXZONE PHASE 3_S6 WING DPM1273032502380 | Near Palaspe Phata Panvel Mumbai Maharashtra, Raigarh | 197 | Feb 2026 | Ongoing | Dec 2032 | Not due yet |
| MARATHON NEXZONE PHASE 3_S6 WING BPM1273032502304 | Near Palaspe phata Panvel Mumbai Maharashtra, Raigarh | 169 | Feb 2026 | Ongoing | Dec 2030 | Not due yet |
| MARATHON NEXZONE PHASE 3_S6 WING APM1273032502296 | palaspe phata, Raigarh | 169 | Feb 2026 | Ongoing | Dec 2029 | Not due yet |
| MARATHON NEOPARK ASHOKA WING CP51800030752 | BHANDUP WEST, Mumbai Suburban | 151 | Sep 2021 | Ongoing | Jun 2028Registered original: Dec 2025 | Not due yet |
| MARATHON NEOVALLEY NARMADA WING BP51800050264 | BHANDUP, Mumbai Suburban | 216 | Mar 2023 | Ongoing | Dec 2027 | Not due yet |
| MARATHON NEOVALLEY KAVERI WING AP51800026955 | BHANDUP, Mumbai Suburban | 269 | Nov 2020 | Ongoing | Jun 2027Registered original: Jun 2025 | Not due yet |
| MARATHON NEOSQUARE AP51800010386 | BHANDUP, Mumbai Suburban | - | Aug 2017 | Ongoing | Dec 2026Registered original: Dec 2022 | Not due yet |
| MARATHON NEOVALLEY KAVERI WING BP51800026970 | BHANDUP, Mumbai Suburban | 293 | Nov 2020 | Ongoing | Jun 2026 | Not delivered |
| MARATHON NEOPARK ASHOKA WING BP51800030751 | BHANDUP WEST, Mumbai Suburban | 128 | Sep 2021 | Completed | Dec 2025 | Sep 2024 |
| MARATHON NEOPARK ASHOKA WING AP51800031073 | BHANDUP WEST, Mumbai Suburban | 193 | Oct 2021 | Ongoing | Dec 2025 | Not delivered |
| MAHAKALESHWAR WING BP51800055887 | BHANDUP, Mumbai Suburban | 26 | Apr 2024 | Ongoing | Dec 2025Registered original: Dec 2024 | Not delivered |
| EKVEERAP51800032741 | SIDHARTH NAGAR MULUND WEST, Mumbai Suburban | - | Jan 2022 | Completed | Dec 2023 | Late, Mar 2024 |
| MARATHON FUTUREX 1P51900025476 | N.M. Joshi Marg, Lower Parel, Mumbai | - | Jun 2020 | Completed | Jun 2021 | Late, Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARATHON NEOVALLEY NARMADA WING C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near bhandup6,700+ in Mumbai Suburban
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: M/S NEXZONE FISCAL SERVICES PVT LTD
M/S NEXZONE FISCAL SERVICES PVT LTD has 5 registrations on MahaRERA, including MARATHON NEOVALLEY KAVERI WING A and MARATHON NEOVALLEY KAVERI WING B. Its filings disclose 14 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MARATHON NEOVALLEY NARMADA WING C is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON NEOVALLEY NARMADA WING C?
The registered promoter entity is M/S NEXZONE FISCAL SERVICES PVT LTD, a company as per the filing. Its CIN U65999MH2008PTC183069 and GSTIN 27AACCN9837F1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON NEOVALLEY NARMADA WING C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARATHON NEOVALLEY NARMADA WING C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARATHON NEOVALLEY NARMADA WING C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHON NEOVALLEY NARMADA WING C?
The professionals named in the filing: Architect: AR SANTOSHKUMAR DUBEY; Architect: SANTOSH PREMCHAND DUBEY; Engineer: GURRUNATH S DHAVANN; Engineer: URVESH VIRENDRA MEHTA; Chartered Accountant: DINESH GANPAT PAI; Chartered Accountant: Preeti Singh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHON NEOVALLEY NARMADA WING C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.