ReraGenieLog inGet a buyer report

Home / Browse projects / Mantri Vantage

Registration lapsed No litigation declared Residential / Group Housing project

Mantri Vantage

By SHORE DWELLINGS PRIVATE LIMITED

RG-MH-20279 · RERA P52100008390 · Last updated on MahaRERA portal: 1 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 54 months past the filed date
  • 31 complaints at MahaRERA
  • Completion date moved by 16 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Apr 2022Possession promised54 months past this date
9 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 94%
31Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Mantri Vantage is a Residential / Group Housing project by SHORE DWELLINGS PRIVATE LIMITED in Kharadi, 411014, registered with MahaRERA as P52100008390 on 18 Aug 2017. Possession was promised by 29 Apr 2022 and is now 54 months past that date. The completion date has moved by 16 months from the original filing. 31 complaints are on record with the regulator.

At a glance

Project

  • NameMantri Vantage
  • TypeResidential / Group Housing
  • Location
    • Behind Zensar IT Park
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100008390
  • ReraGenie IDRG-MH-20279

Builder

  • NameSHORE DWELLINGS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

54 months past promisethis monthRegisteredAug 2017First promiseDec 2020Revised toApr 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion29 Apr 2022
  • Revised completionRevised to 29 Apr 2022 (originally 30 Dec 2020)
  • Buildings3 building records
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA210000
BNA220000
CNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 94%.

A49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor0%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises48%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks32%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor0%
Slabs of Super Structure81%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor0%
Slabs of Super Structure43%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered6
Open Space79
BuildingClosed/CoveredOpen SpaceTotal
A27981
B202
C202

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area27,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Synergy DevelopersPune (M Corp.)Pune

Approvals and building plan

Permissible FSI30808.99
Proposed, not sanctioned21,006 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Tower 1 , Comissiariat Road Ground Floor Bengaluru - 560025

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit Kembhavi
EngineerSatish Marathe Consulting Engineers
PartnerRole in project
SHORE DWELLINGS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100008454Dec 2020 → Oct 2021

Reason as filed by the promoterDue to Covid-19 and labour charges.

Litigation declared1

CaseCourtStatus
597/2015District Court Shivajinagar PuneReturn of Summon

Complaints filed with MahaRERA31

Case no.ComplainantRespondentFiled
CC005000000000205Mantri DevelopersMantri Developers25/09/2017
CC005000000000230MR PRAFUL KULARKARMantri Dwellings Private Limited26/09/2017
CC005000000011201Ansari Mohammad Anas Mohammad AfzalMantri Dwellings Pvt. Ltd.16/03/2018
CC005000000011205Ansari Mohammad Ovais Mohammad AfzalMantri Dwellings Pvt. Ltd.17/03/2018
CC005000000011047TASNEEM MOMINMANTRI DWELLINGS PVT. LTD.26/02/2018
CC005000000011058Praful Kularkar and Neha MakdeyMantri Dwellings Pvt Ltd through its Authorized Signatory Girish HS Gupta28/03/2018
CC005000000011276RAJESH SAXENA AND SMRITI SAXENAMantri Dwellings Pvt Ltd28/03/2018
CC005000000011283MR RAVENDRA KUMAR SAXENA AND MRS SANTOSH SAXENAMANTRI DWELLINGS PVT LTD28/03/2018
CC005000000022270Mr Syed Javed Hussain and Mrs Rizwana Hussainmantri dwellings19/11/2018
CC005000000022410SUBHASIS ROYMantri Dwelling Pvt Ltd03/01/2019
CC005000000022707Kranti Uday BhujbalMantri Dwellings Private Limited02/03/2019
CC005000000023307Argha DasguptaMantri Dwellings Pvt. Ltd.14/10/2019
CC005000000054070Mr Ravi Bhosale and Mrs Poonam BhosaleMantri Dwellings Pvt Ltd28/02/2020
CC005000000064579Rita RanikhetwallaMantri Developers02/09/2020
CC005000000064798Rahul Anup Jayakar and Baizu Rahul JayakarMantri dwellings pvt ltd03/11/2020
CC005000000064800Rahul Anup Jayakar and Baizu Rahul JayakarMantri dwellings pvt ltd03/11/2020
CC005000000075034Sumeet Vijay BhaleraoMantri Dwellings Private Limited04/01/2021
CC005000000085341ABHA ELECTROMECH PVT. LTD.MANTRI DWELLING PRIVATE LIMITED17/03/2021
CC005000000085358SUSMITA SUSANTA MANDALMANTRI DWELLINGS PVT LTD18/03/2021
CC005000000085488Gaurav Prakashrao KaraleMantri Dwelling Pvt ltd23/04/2021
CC005000000085659MAHENDRA SINGH RAJENDRA VERMAMANTRI DWELLING PRIVATE LIMITED29/06/2021
CC005000000095891Manoj Gobind KotwaniManoj Kotwani15/08/2021
CC005000000095903Yugandhara Sagar NirmalkarMantri Vantage28/08/2021
CC005000000106361SANKET S DESHPANDEShore Dwellings Pvt ltd09/12/2021
CC005000000106492Parth Acharya and Siddhi AcharyaMantri Dwellings Pvt. Ltd.16/01/2022
CC005000000106493Sanal Kumar SomasundaranSHORE DWELLINGS PRIVATE LIMITED16/01/2022
CC005000000106635SUHAS PATILSNEHAL MANTRI15/02/2022
CC005000000258821PRETHEWSH JOYMANTRI DWELLINGS PVT LTD05/05/2023
CC005000000258949Mahesh Premnath JaikhedkarSushil Mantri14/06/2023
CC005000000310358SABITA GOSAINMantri Dwellings Pvt Ltd11/02/2024
CC12400889Milind Laxman KhandareSHORE DWELLINGS PRIVATE LIMITED26/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vantage - Architect Certificate.pdf1 Mar 2025
Certificates of CA (Form 3)File: Vantage CA Certificate_compressed.pdf1 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vantage - Engineer Certificate.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Vantage - Sold and Unsold_compressed.pdf1 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mantri Vantage - Form 5 - FY 2021-22.pdf1 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mantri Vantage - Form 5 - FY 2022-23.pdf1 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mantri Vantage - Form 5 - FY 2023-24.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Dec 2023.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 2021.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sep 2024.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 2024.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 2024.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sep 2023.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 2023.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 2023.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Dec 2022.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sep 2022.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 2022.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 2022.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Dec 2021.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sep 2021.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate March 2023_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Sep 2024_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate June 2024_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate March 2024_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Dec 2023_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Sep 2023_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate June 2023_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Sep 2022_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate June 2022_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate March 2022_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA certificate Dec 2021_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Sep 2021_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate June 2021_compressed.pdf29 Nov 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Dec 2022_compressed.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Sep 2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate June 2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate March 2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 2023.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Sep 2023.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate June 2023.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate March 2023.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 2022.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Sep 2022.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate June 2022.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate march 2022.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 2021.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Sep 2021.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate June 2021.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vantage- Architect Certificate March 2020.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate 06-2020.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate 09-2020.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate 12-2020.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate 03-2021.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engg Certificate 06-2020.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engg Certificate 09-2020.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engg Certificate 12-2020.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engg Certificate 03-2021.pdf19 Mar 2024
Certificates of CA (Form 3)File: Form-3 CA Certificate 06-2020.pdf19 Mar 2024
Certificates of CA (Form 3)File: Form-3 CA Certificate 09-2020.pdf19 Mar 2024
Certificates of CA (Form 3)File: Form-3 CA Certificate Dec-2020.pdf19 Mar 2024
Certificates of CA (Form 3)File: Form-3 CAA Mar-2021.pdf19 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SDwPL_Vantage_RERA Form 5 Annual Audit Report 2019-20.pdf12 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDwPL_Vantage_RERA Form 5 Annual Audit Report 2020-21.pdf12 Jul 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf6 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance(Form 2A FY 2020-21).pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory_compressed.pdf6 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form - 5 - MV.pdf20 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5.pdf23 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: M Vantage Quality Cert Form 2A 30092019.pdf12 Feb 2020
Certificates of CA (Form 3)File: Mantri Vantage-CA Rera Certificate 30092019.pdf12 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mantri Vantage Architect Certificate 21032019.pdf4 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mantri Vantage RERA Engineer Certificate 21032019.pdf4 May 2019
Certificates of CA (Form 3)File: M Vantage CA Certificate 21032019.pdf4 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: M Vantage Architects Certificate 21102018.pdf14 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: M Vantage Engineers Certificate 21102018.pdf14 Nov 2018
Certificates of CA (Form 3)File: M Vantage CA Certificate 21102018.pdf14 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mantri Vantage-Architect's Certificate dated 06 08 2018.pdf20 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mantri Vantage-Engineer's Certificate dated 06 08 2018.pdf20 Sep 2018
Declaration in FORM BFile: Form B Girish Gupta MDwPL.pdf4 May 2018

Keep Mantri Vantage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

2 kmMantri VantageCompleted 54Lapsed / revoked 29Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: SHORE DWELLINGS PRIVATE LIMITED

SHORE DWELLINGS PRIVATE LIMITED has 2 registrations on MahaRERA, including Mantri Vantage and Mantri Emporio. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that Mantri Vantage shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Mantri Vantage is delayed beyond 29 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mantri Vantage?

The registered promoter entity is SHORE DWELLINGS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mantri Vantage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mantri Vantage?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mantri Vantage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mantri Vantage?

The professionals named in the filing: Architect: Amit Kembhavi; Engineer: Satish Marathe Consulting Engineers. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mantri Vantage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mantri Vantage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mantri Vantage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.