Home / Browse projects / Pune, Maharashtra / Mantra Magnus Phase 4

Registered No litigation declared Residential / Group Housing project

Mantra Magnus Phase 4

By SPECIALITY LANDMARKS PRIVATE LIMITED

RG-MH-95145 · RERA PR1268082601466 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 10Construction stages donefurthest along: Internal walls, 40%
50 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 5 documents Report an error

Mantra Magnus Phase 4 is a Residential / Group Housing project by SPECIALITY LANDMARKS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as PR1268082601466 on 7 Aug 2026. Possession is promised by 31 Dec 2028. 0 of the 50 units on this registration are recorded sold or booked, and 5 of 10 construction stages are filed complete.

At a glance

Project

  • NameMantra Magnus Phase 4
  • TypeResidential / Group Housing
  • Location
    • -
    • Mundhwa North
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1268082601466
  • ReraGenie IDRG-MH-95145

Builder

  • NameSPECIALITY LANDMARKS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAVCS4973N1Z6
  • DirectorsROHIT GHANSHYAM GUPTA, ASHISH SATISH GUPTA, SANDESH DINESH GUPTA
  • Other registrations8 more →
  • Declared earlier projects8 →

Key dates

this monthRegisteredAug 2026PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Aug 2026
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed5 files

Current status

0%0 of 50 units booked

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H-WingNA151350050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 10 construction stages are filed complete. The stage furthest along is Internal walls, at 40%.

H-Wing: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered93

Land and ownership17

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area33,850 sq m
Land owned byThe promoter, with other names on the file
Named landowners17
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2026
LandownerVillageDistrict
Ahilya Givardhan ShindeGhorpadiPune
Vanita Vijay BirmalManjariPune
Jayashree Satish Badhe-Pune
MAYUR SATISH BADHE-Pune
Amruta Satish Badhe-Pune
NITISH MANIK KODREWanjalewadiPune
ANUP MANIK KODREwanwadiPune
KALPANA MANIK KODREwanwadiPune
AMOL VILASH KODRE-Pune
JAYSHRI VILAS KODRE-Pune
Manik Nivrutti Kodre-Pune
Nikit Vilas KodreHadapsarPune
VILAS NIVRUTTI KODREYawatPune
ARCHANA ANIL SAYKARMundhawaPune
SHAILESH ASHOK KODREMundhawaPune
NILESH ASHOK KODREMundhawaPune
ASHOK NIVRUTTI KODRE-Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3156.43
Proposed, not sanctioned3,156 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Somshank Chambers, Survey No. 46, Plot 1, Pune Satara Road, Pune.411009

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMitesh Sidhpura & Associates
EngineerRavi Rawal
EngineerRajesh Mankani
Chartered AccountantCA SHRUTI AGARWAL
Chartered AccountantR DEVENDRAKUMAR AND ASSOCIATES
Chartered AccountantBANSAL GARG AND ASSOCIATES
PartnerRole in project
SPECIALITY LANDMARKS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed5

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 01 Layout_Highlighted.pdf17 Jul 2026
Building plan approvalFile: 02 Plot area Key Plan.pdf17 Jul 2026
Building plan approvalFile: 17 H Wing Parking Highlighted.pdf17 Jul 2026
Building plan approvalFile: 18 H First Floor Plan.pdf17 Jul 2026
Declaration and undertaking (Annexure A)File: 00 Declaration cum Undertaking for Order 50_final.pdf17 Jul 2026

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MANTRA MAGNUS PHASE 9P52100078851MUNDHAWA, Pune213Jan 2025OngoingDec 2030Not due yet
MANTRA MAGNUS PHASE 6P52100054742MUNDHWA, Pune13Feb 2024Certificate SignedDec 2030Not due yet
MANTRA MAGNUS PHASE 5P52100054231Mundhwa, Pune91Jan 2024OngoingDec 2030Not due yet
MANTRA MAGNUS PHASE 8P52100055885Mundhwa, Pune90Apr 2024Certificate SignedSep 2029Not due yet
MANTRA MAGNUS PHASE 7P52100055623Mundhwa, Pune67Apr 2024OngoingSep 2029Not due yet
MANTRA MAGNUS PHASE 3P52100054483MUNDHWA, Pune90Jan 2024OngoingDec 2028Not due yet
MANTRA MAGNUS PHASE 2P52100054373MUNDHWA, Pune50Jan 2024OngoingDec 2028Not due yet
MANTRA MAGNUS PHASE 1P52100054558MUNDHWA, Pune92Jan 2024OngoingDec 2028Not due yet

How this compares with Pune

0%of this project is bookeddistrict median 30%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,800+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mantra Magnus Phase 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa North13,800+ in Pune

2 kmMantra Magnus Phase 4Completed 46Lapsed / revoked 29Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 164 registered projects within 2 km.

Builder: SPECIALITY LANDMARKS PRIVATE LIMITED

Speciality Landmarks Private Limited has 9 registrations on MahaRERA, including MANTRA MAGNUS PHASE 1 and MANTRA MAGNUS PHASE 6. Its filings disclose 8 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mantra Magnus Phase 4 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mantra Magnus Phase 4?

The registered promoter entity is SPECIALITY LANDMARKS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAVCS4973N1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mantra Magnus Phase 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mantra Magnus Phase 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mantra Magnus Phase 4?

The professionals named in the filing: Architect: Mitesh Sidhpura & Associates; Engineer: Ravi Rawal; Engineer: Rajesh Mankani; Chartered Accountant: CA SHRUTI AGARWAL; Chartered Accountant: R DEVENDRAKUMAR AND ASSOCIATES; Chartered Accountant: BANSAL GARG AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mantra Magnus Phase 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mantra Magnus Phase 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mantra Magnus Phase 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.