Home / Browse projects / Pune, Maharashtra / Mangalam Melizma
Mangalam Melizma
RG-MH-41994 · RERA P52100051095 · Last updated on MahaRERA portal: 29 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mangalam Melizma is a Residential / Group Housing project by Ved Mangalam Associates in Pune, Maharashtra, registered with MahaRERA as P52100051095 on 29 May 2023. Possession is promised by 31 Dec 2026. 262 of the 364 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.
At a glance
Project
- NameMangalam Melizma
- TypeResidential / Group Housing
- Location
- Kivale
- Mawal
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051095
- ReraGenie IDRG-MH-41994
Builder
- NameVed Mangalam Associates
- Entity typePartnership
- PartnersRamdas Damodar Phuge designated partners of Mangalam Landmarks LLP, Chetan Suresh Kunjir, Vishnu Bhikaji Newale, Nivrutti Vitthal Shinde
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed192 files
Current status
Figures as on 29 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 15 | 14 | 196 | 0 | 196 |
| Building B | NA | 14 | 14 | 156 | 12 | 168 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
Building A97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Building B97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 29 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 20% |
| Community Buildings | Yes | 85% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | Yes | 10% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 55% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed123
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building A | 71 | 10 | 81 |
| Building B | 32 | 10 | 42 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sopan Vithu Sawant | Kivale | Pune |
| Arun Sopan Sawant | Kivale | Pune |
| Shalan Sopan Sawant | Kivale | Pune |
| Sarika Arun Sawant | Kivale | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building A | NA | Rs 54.50 cr | Rs 44.82 cr |
| Building B | NA | Rs 43.32 cr | Rs 35.62 cr |
| - | NA | Rs 9.68 cr | Rs 7.96 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Datir Patil Associates |
| Architect | Arise Architects & Interior Designers |
| Engineer | R K Randhave Consultants |
| Engineer | Vaibhav Gaikwad |
| Engineer | Shailesh Wankhede |
| Chartered Accountant | VRVK and Associates |
| Chartered Accountant | Amruta Shinde And Associates |
| Chartered Accountant | CA Vikas Khadasare |
| Chartered Accountant | Navdeep Jindal And Associates |
| Partner | Role in project |
|---|---|
| Ved Mangalam Associates | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed192
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 192 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: NEW Format for 2A - Ved Mangalam.pdf | 29 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Melizma upto July-26.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: Veb Mangalam Form-2 Sign.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Form 3-Ved Mangalam Jun_26 Sign.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Miraya Arch certificate upto 31 March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engg Certificate upto March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 SDMA upto 31 March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Melizma upto Dec 2025.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Dec 2025 Form 2 Engineers certificate Mangalam Melizma.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Melizma upto Dec 2025.pdf | 23 Jan 2026 |
| Form 5 (FY 2024-2025)File: Melizma form 5 2024 to 2025.pdf | 19 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 2023 - 2024 ved mangalam 2020924001.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Melizma Arc Cert Sep 2025_0001.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Final form 2 Ved Mangalam (1).pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Final Form 3 -Ved Mangalam Associates.pdf | 25 Oct 2025 |
| Layout approvalFile: 1 Sanctioned layout plan.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno004.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno005.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno006.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno007.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno008.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno009.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno010.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno012.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno013.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno014.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno015.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno016.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno017.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno018.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno019.pdf | 10 Oct 2025 |
| Building plan approvalFile: bjno020.pdf | 10 Oct 2025 |
| Building plan approvalFile: Shopes.pdf | 10 Oct 2025 |
| Form 1File: Form 1 upto June 25.pdf | 19 Jul 2025 |
| Form 2File: Form 2 Engg Certificate.pdf | 19 Jul 2025 |
| Form 3File: Form 3 upto 30 June.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY 17-07-2025_0001.pdf | 19 Jul 2025 |
| Form 1File: Form 1 upto March 2025 melizma.pdf | 26 Jun 2025 |
| Form 2File: Form 2 Melizma upto March 2025.pdf | 26 Jun 2025 |
| Form 3File: Ved Mngalam Associates Form 3_compressed.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: mar 25 Disclosure of sold and unsold inventory ved.pdf | 26 Jun 2025 |
| Form 1File: Melizma Arch Certificate upto Dec 2024.pdf | 26 Jun 2025 |
| Form 2File: Form 2 Dec 2024 Engg certificate.pdf | 26 Jun 2025 |
| Form 3File: CA Certificate Form 3 upto Dec 2024 Melizma_compressed.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Melizma Disclosure of sold unsold inventory Upto 31Dec24_compressed.pdf | 26 Jun 2025 |
| Form 1File: Form 1 Sept 2024_compressed.pdf | 26 Jun 2025 |
| Form 2File: Form 2 Upto Sept 2024 ENG CERTIFICATE VED MANGALAM001.pdf | 26 Jun 2025 |
| Form 3File: Form 3 melizma upto sept 2024.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Meliza DOSU sept 2024 compressed.pdf | 26 Jun 2025 |
| Form 1File: Melizma Form 1 June 2024.pdf | 26 Jun 2025 |
| Form 2File: Form 2 June 2024 Melizma.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Melizma DU 30June2024compressed.pdf | 26 Jun 2025 |
| Form 3File: 3mb CA certificate Form 3 Melizma .pdf | 26 Jun 2025 |
| Form 1File: Melizma Arch Form 1 March 2024.pdf | 26 Jun 2025 |
| Form 2File: Form 2 Melizma March 2024.pdf | 26 Jun 2025 |
| Form 3File: Form 3 March 2024 Melizma.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Ved mangalam Booked Inventary001compressed.pdf | 26 Jun 2025 |
| Form 1File: Form 1 Arch certificate Ved Mangalam Asssocaites.pdf | 26 Jun 2025 |
| Form 3File: Form 3.pdf | 26 Jun 2025 |
| Form 2File: DECEMBER 2023 Form 2 Melizma.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Ved mangalam Book Inventory001.pdf | 26 Jun 2025 |
| Form 1File: Arch certificate Form 1 Melizma Upto 30Sept2023.pdf | 26 Jun 2025 |
| Form 2File: FORM 2 Ved Mangalam Sept 2023.pdf | 26 Jun 2025 |
| Form 3File: VRVK Form 2 CA certificate upto 30 spet 2023.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory Melizma 30Sept2023.pdf | 26 Jun 2025 |
| Form 1File: Arch Certificate Melizma June 2023.pdf | 26 Jun 2025 |
| Form 2File: Melizma Form2 June 2023.pdf | 26 Jun 2025 |
| Form 3File: CA Certificate Mangalam Melizma June 2023.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Ved mangalam Book Inventory002.pdf | 26 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 upto March 2025 melizma.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: mar 25 Disclosure of sold and unsold inventory ved.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Melizma upto March 2025.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ved Mngalam Associates Form 3_compressed.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024 Engg certificate.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Melizma Arch Certificate upto Dec 2024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 upto Dec 2024 Melizma_compressed.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Melizma Disclosure of sold unsold inventory Upto 31Dec24_compressed.pdf | 18 Jan 2025 |
| Proforma of Agreement for saleFile: Agreement Mangalam Melizma.pdf | 28 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Upto Sept 2024 ENG CERTIFICATE VED MANGALAM001.pdf | 25 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Meliza DOSU sept 2024 compressed.pdf | 26 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 192 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mangalam Melizma on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kivale13,700+ in Pune
Filed coordinates, straight-line distance. 258 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Ved Mangalam Associates
Ved Mangalam Associates has 1 registration on MahaRERA, including Mangalam Melizma. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Mangalam Melizma is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mangalam Melizma?
The registered promoter entity is Ved Mangalam Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mangalam Melizma?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mangalam Melizma?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mangalam Melizma?
The professionals named in the filing: Architect: Datir Patil Associates; Architect: Arise Architects & Interior Designers; Engineer: R K Randhave Consultants; Engineer: Vaibhav Gaikwad; Engineer: Shailesh Wankhede; Chartered Accountant: VRVK and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mangalam Melizma?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback