Home / Browse projects / Thane, Maharashtra / Manan Heights - A Wing
Manan Heights - A Wing
RG-MH-28615 · RERA P51700026564 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- Completion date moved by 34 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Manan Heights - A Wing is a Residential / Group Housing project by M/s.Hari Om Developers in Thane, Maharashtra, registered with MahaRERA as P51700026564 on 4 Oct 2020. Possession was promised by 29 Apr 2026 and is now 6 months past that date. The completion date has moved by 34 months from the original filing. 0 of the 26 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameManan Heights - A Wing
- TypeResidential / Group Housing
- Location
- Ghodbunder Road
- Waghbil Kavesar Thane West
- Thane (M Corp.)
- Thane
- 400615
- Pincode400615
- RERA no.P51700026564
- ReraGenie IDRG-MH-28615
Builder
- NameM/s.Hari Om Developers
- Entity typePartnership
- PartnerVasudha Ritesh Mhatre
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Oct 2020
- Promised completion29 Apr 2026
- Revised completionRevised to 29 Apr 2026 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Manan Heights - A wing | NA | 9 | 9 | 26 | 0 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Manan Heights - A wing: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed27
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Nirmal Devraj | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Manan Heights - A wing | NA | Rs 6.04 cr | Rs 2.40 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Aniruddha Gurjar |
| Engineer | Pentacon Structural Consultants Private Limited |
| Chartered Accountant | Sumit C Kapure |
| Chartered Accountant | Shripati Gandhi Choudhary & Co. |
| Partner | Role in project |
|---|---|
| M/s.Hari Om Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe started construction work in the full swing. Quality of the construction is our primary preference and therefore we do not compromise with the quality of construction over speed of the construction. Therefore, as per the given circumstances, the construction work progressed.The main reason for the delay is dispute with the landowner at various levels the critical being civil suit filled in the court of The Civil Judge (S.D.) Thane. The civil suit begun since the outset of the project till the matter was successfully mediated somewhere in November 2023. Due to this dispute with the landowner
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Spl CS/282/2021/2021 | Civil Court Senior Division Thane | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Sep 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Sep 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Manan Heights - March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Manan Heights - March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Manan Heights - March 26.pdf | 23 Apr 2026 |
| Form 1File: Form 1 - March 24.pdf | 20 Feb 2026 |
| Form 2File: Form 2 - March 24.pdf | 20 Feb 2026 |
| Form 3File: Form 3 - March 24_compressed.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 24.pdf | 20 Feb 2026 |
| Form 1File: Form 1 - June 24.pdf | 20 Feb 2026 |
| Form 2File: Form 2 - June 24.pdf | 20 Feb 2026 |
| Form 3File: Form 3 - Manan Heights - June 24.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 24.pdf | 20 Feb 2026 |
| Form 1File: Form 1 - Sept 24.pdf | 20 Feb 2026 |
| Form 2File: Form 2 - Sept 24.pdf | 20 Feb 2026 |
| Form 3File: Form 3 - Sept 24_compressed.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 24.pdf | 20 Feb 2026 |
| Form 1File: Form 1 - December 24.pdf | 20 Feb 2026 |
| Form 2File: Form 2 - Dec 24.pdf | 20 Feb 2026 |
| Form 3File: Form 3 - Dec 24_compressed.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - December 24.pdf | 20 Feb 2026 |
| Form 1File: form 1 - March 25.pdf | 20 Feb 2026 |
| Form 2File: Form 2 - March 25.pdf | 20 Feb 2026 |
| Form 3File: Form 3 - March 25_compressed.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - June 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Sept 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - June 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Sept 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Manan Heights - Dec 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - June 25_compressed.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 Sept 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Manan Heights - Dec 25.pdf | 20 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form-2A-31st March-25.pdf | 20 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 20 Feb 2026 |
| Form 1File: Form 1 - March 24.pdf | 5 Feb 2026 |
| Form 2File: Form 2 - March 24.pdf | 5 Feb 2026 |
| Form 3File: Form 3 - March 24_compressed.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 24.pdf | 5 Feb 2026 |
| Form 2A (FY 2020-2021)File: Form 2A-31st March-21.pdf | 5 Feb 2026 |
| Form 2A (FY 2021-2022)File: Form 2A-31st March-22.pdf | 5 Feb 2026 |
| Form 2A (FY 2022-2023)File: Form-2A-31st March-23.pdf | 5 Feb 2026 |
| Form 2A (FY 2023-2024)File: Form 2A-31st March-24.pdf | 5 Feb 2026 |
| Form 5 (FY 2020-2021)File: Form 5 - 2020-21.pdf | 5 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form 5 - 2021-22.pdf | 5 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 -22-23.pdf | 5 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5 -23-24.pdf | 5 Feb 2026 |
| Form 1File: Form 1 - March 23.pdf | 6 Jan 2026 |
| Form 2File: Form 2 - March 23.pdf | 6 Jan 2026 |
| Form 3File: Form 3 - March 23.pdf | 6 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 23.pdf | 6 Jan 2026 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21_compressed.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22_compressed.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21 Hari Om.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22 Hari Om.pdf | 23 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 24 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Manan heights - mar 21.pdf | 24 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Manan Heights Mar 21-1.pdf | 24 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Manan Heights Mar 21-2.pdf | 24 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hari Om Developers Architects Certificate.pdf | 1 Oct 2020 |
| Layout approvalFile: Manan Heights Sanctioned Plan.pdf | 26 Sep 2020 |
| Building plan approvalFile: Manan Heights Sanctioned Plan.pdf | 26 Sep 2020 |
| PAN CardFile: HOD PAN.PDF | 26 Sep 2020 |
| Copy of the legal title reportFile: Title Report.pdf | 26 Sep 2020 |
| Details of encumbrancesFile: Non Encumbrances Certificate for Manan Heights.pdf | 26 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: Manan Heights Sanctioned Plan.pdf | 26 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Manan Heights Sanctioned Plan.pdf | 26 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Manan Heights CC.pdf | 26 Sep 2020 |
| Declaration in FORM BFile: Form B - Developer.pdf | 26 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 manan heights wing A.pdf | 26 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 26 Sep 2020 |
| Proforma of Allotment letterFile: Sale Draft Manan Heights.pdf | 26 Sep 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Manan Heights - A Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Waghbil Kavesar Thane West7,600+ in Thane
Godrej Emerald Thane
Godrej Greenview Housing Private Limited
NORTH IMPERIAL GREENS -TOWER 2
Skylark Buildspace Private Limited
VIHANG MARINA
BALAJI ENTERPRISES
Puranik City Reserva Phase 1
Puranik Builders Limited
NORTH IMPERIAL GREENS - TOWER 1
Skylark Buildspace Private Limited
RAUNAK 108
UNNATHI ASSOCIATES
See every Thane project, with the district possession charts
Builder: M/s.Hari Om Developers
M/s.Hari Om Developers has 1 registration on MahaRERA, including Manan Heights - A Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Manan Heights - A Wing shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Manan Heights - A Wing is delayed beyond 29 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Manan Heights - A Wing?
The registered promoter entity is M/s.Hari Om Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Manan Heights - A Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Manan Heights - A Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Manan Heights - A Wing?
The professionals named in the filing: Architect: Ar Aniruddha Gurjar; Engineer: Pentacon Structural Consultants Private Limited; Chartered Accountant: Sumit C Kapure; Chartered Accountant: Shripati Gandhi Choudhary & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Manan Heights - A Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback