Home / Browse projects / MAJESTIQUE MARBELLA PHASE V
MAJESTIQUE MARBELLA PHASE V
RG-MH-22981 · RERA P52100032450 · Last updated on MahaRERA portal: 11 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAJESTIQUE MARBELLA PHASE V is a Residential / Group Housing project by Majestique Empire LLP in KHARADI, 411014, registered with MahaRERA as P52100032450 on 4 Jan 2022. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameMAJESTIQUE MARBELLA PHASE V
- TypeResidential / Group Housing
- Location
- KHARADI
- 411014
- Pincode411014
- RERA no.P52100032450
- ReraGenie IDRG-MH-22981
Builder
- NameMajestique Empire LLP
- Entity typePartnership
- GSTIN27ABLFM0397E1Z3
- PartnerRajendra Bhavarlal Mehta
- Other registrations5 more →
- No longer live4 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Jan 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed112 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING B | NA | 20 | 0 | 0 | 0 | 0 |
| WING C | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.
WING B69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 15% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING C75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed160
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING B | 64 | 64 |
| WING C | 96 | 96 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S SHARAD MUTHA HOUSING DEVELOPMENT LTD | Pune (M Corp.) | Pune |
| TAKSHILA CHSL THROUGH POA M/S SHARAD MUTHA HOUSING | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR JAY AERAM |
| Engineer | JW CONSULTANT |
| Chartered Accountant | CA Natwarlal Tawani |
| Chartered Accountant | V K Jindal & Co |
| Partner | Role in project |
|---|---|
| Majestique Empire LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 389/2020 | Hon Civil Judge Senior Division Pune at Pune | Pending before Hon Court |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed112
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Majestique Empire LLP Phase 5 FORM 5.pdf | 11 Dec 2025 |
| Form 1File: Form 1 Ph V.pdf | 26 Nov 2025 |
| Form 2File: Form 2 Ph V.pdf | 26 Nov 2025 |
| Form 3File: Empire LLP FORM 3 Phase 5 Q2.pdf | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Marbella V 30-09-2025.pdf | 26 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 5_compressed (1).pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: marbella V 31 march 2025_compressed.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: C - Marbella-PH-V_compressed.pdf | 29 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Marbella BC -Ph-V_compressed.pdf | 29 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 5 _compressed.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 5_compressed.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 5 Q1_compressed.pdf | 1 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 5 Q2_compressed.pdf | 1 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 Majestique Empire LLP Phase 5.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Ph-V sold unsold_compressed.pdf | 10 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Marbella B, C_compressed.pdf | 7 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Marbella Ph-V-wing B-C.pdf | 15 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase - 5.pdf | 22 Feb 2024 |
| Layout approvalFile: DP LAYOUT (1).pdf | 2 May 2023 |
| Building plan approvalFile: 01.pdf | 2 May 2023 |
| Building plan approvalFile: 02.pdf | 2 May 2023 |
| Building plan approvalFile: 03.pdf | 2 May 2023 |
| Building plan approvalFile: 04.pdf | 2 May 2023 |
| Building plan approvalFile: 05.pdf | 2 May 2023 |
| Building plan approvalFile: 06.pdf | 2 May 2023 |
| Building plan approvalFile: 07.pdf | 2 May 2023 |
| Building plan approvalFile: 08.pdf | 2 May 2023 |
| Building plan approvalFile: 09.pdf | 2 May 2023 |
| Building plan approvalFile: 10.pdf | 2 May 2023 |
| Building plan approvalFile: 11.pdf | 2 May 2023 |
| Building plan approvalFile: 12.pdf | 2 May 2023 |
| Building plan approvalFile: 13.pdf | 2 May 2023 |
| Building plan approvalFile: 14.pdf | 2 May 2023 |
| Building plan approvalFile: 15.pdf | 2 May 2023 |
| Building plan approvalFile: 16.pdf | 2 May 2023 |
| Building plan approvalFile: 17.pdf | 2 May 2023 |
| Building plan approvalFile: 18.pdf | 2 May 2023 |
| Building plan approvalFile: 19.pdf | 2 May 2023 |
| Copy of Layout Approval (in case of layout)File: DP LAYOUT (1).pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 01.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 02.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 03.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 04.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 05.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 06.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 07.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 08.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 09.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 11.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 12.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 13.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 14.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 15.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 16.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 17.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 18.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 19.pdf | 2 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 2 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-V Form-3_compressed.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Empire Phase V.pdf | 23 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-V_compressed.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Majestique Empire LLP Form-5 Phase V.pdf | 30 Nov 2022 |
| Details of encumbrancesFile: Encub.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Marbella C wing (2)_compressed.pdf | 18 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Marbella D wing_compressed.pdf | 18 Jun 2022 |
| CERSAI detailsFile: CERSAI Search Report Marbella.pdf | 27 Dec 2021 |
| Layout approvalFile: DP LAYOUT-00.pdf | 23 Dec 2021 |
| Building plan approvalFile: 01.pdf | 23 Dec 2021 |
| Building plan approvalFile: 02.pdf | 23 Dec 2021 |
| Building plan approvalFile: 03.pdf | 23 Dec 2021 |
| Building plan approvalFile: 04.pdf | 23 Dec 2021 |
| Building plan approvalFile: 05.pdf | 23 Dec 2021 |
| Building plan approvalFile: 06.pdf | 23 Dec 2021 |
| Building plan approvalFile: 07.pdf | 23 Dec 2021 |
| Building plan approvalFile: 08.pdf | 23 Dec 2021 |
| Building plan approvalFile: 09.pdf | 23 Dec 2021 |
| Building plan approvalFile: 10.pdf | 23 Dec 2021 |
| Building plan approvalFile: 11.pdf | 23 Dec 2021 |
| Building plan approvalFile: 12.pdf | 23 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 112 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAJESTIQUE MARBELLA PHASE V on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARADI
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Majestique Empire LLP
Majestique Empire LLP has 6 registrations on MahaRERA, including MAJESTIQUE MARBELLA PHASE 1 and MAJESTIQUE MARBELLA PHASE II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if MAJESTIQUE MARBELLA PHASE V is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAJESTIQUE MARBELLA PHASE V?
The registered promoter entity is Majestique Empire LLP, a partnership as per the filing. Its GSTIN 27ABLFM0397E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAJESTIQUE MARBELLA PHASE V?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAJESTIQUE MARBELLA PHASE V?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAJESTIQUE MARBELLA PHASE V?
The professionals named in the filing: Architect: MR JAY AERAM; Engineer: JW CONSULTANT; Chartered Accountant: CA Natwarlal Tawani; Chartered Accountant: V K Jindal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAJESTIQUE MARBELLA PHASE V?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback