Home / Browse projects / MAJESTIQUE MARBELLA PHASE II
MAJESTIQUE MARBELLA PHASE II
RG-MH-17236 · RERA P52100030349 · Last updated on MahaRERA portal: 11 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 13 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAJESTIQUE MARBELLA PHASE II is a Commercial project by Majestique Empire LLP in Kharadi Pune, 411014, registered with MahaRERA as P52100030349 on 17 Aug 2021. Possession was promised by 30 Sep 2025 and is now 13 months past that date. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameMAJESTIQUE MARBELLA PHASE II
- TypeCommercial
- Location
- Kharadi Pune
- 411014
- Pincode411014
- RERA no.P52100030349
- ReraGenie IDRG-MH-17236
Builder
- NameMajestique Empire LLP
- Entity typePartnership
- GSTIN27ABLFM0397E1Z3
- PartnerRajendra Bhavarlal Mehta
- Other registrations5 more →
- No longer live4 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Aug 2021
- Promised completion30 Sep 2025
- Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2024)
- Buildings2 building records
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING C COMMERCIAL | NA | 4 | 0 | 0 | 0 | 0 |
| BUILDING D COMMERCIAL | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
BUILDING C COMMERCIAL97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
BUILDING D COMMERCIAL97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 11 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 65% |
| Street Lighting | Yes | 30% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING C COMMERCIAL | 32 | 32 |
| BUILDING D COMMERCIAL | 28 | 28 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S SHARAD MUTHA HOUSING DEVELOPMENT LTD | - | Pune |
| TAKSHILA COOP SOCIETY THROUGH POA M/S SHARAD MUTHA | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR JAY AERAM |
| Engineer | JW CONSULTANT |
| Chartered Accountant | NATWARLAL TAWANI |
| Chartered Accountant | V K Jindal & Co |
| Partner | Role in project |
|---|---|
| Majestique Empire LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. That we have completed around 90% work of the said project. And now only finishing work is pending which will be completed in due course of time i.e. within 30/09/2025. Further, we have applied for completion certificate for this project from Pune Municipal Corporation, Pune. As to obtain OC from PMC we need some time. Requesting for extension of few months 2. Further more, we have completed the other building projects in the same entire project and obtained OC / Completion Certificate from PMC, Pune. (Copy of the OC/ Completion Certificate is attached for your reference) 3. That out of 60
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 389/2020 | Honble Civil Judge Junior Division | Pending |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12604193 | Siddhant Narendra Chothe | Majestique Empire LLP | 04/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Majestique Empire LLP Phase 2 FORM 5.pdf | 11 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: marbella II 30- 09-2025.pdf | 26 Nov 2025 |
| Form 3File: Empire LLP FORM 3 Phase 2 Q2.pdf | 26 Nov 2025 |
| Form 2File: Form 2 Ph II.pdf | 26 Nov 2025 |
| Form 1File: Form 1 Ph II.pdf | 26 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 2_compressed (1).pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: marbella II 31 march 2025_compressed.pdf | 11 Apr 2025 |
| Proforma of Allotment letterFile: Allotment Ph II.pdf | 4 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A new.pdf | 4 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment_Ph II.pdf | 4 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement_Ph II.pdf | 4 Mar 2025 |
| Proforma of Agreement for saleFile: Agreement Ph ii.pdf | 4 Mar 2025 |
| Details of encumbrancesFile: No Encum Ph II.pdf | 1 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: No Encum Ph II.pdf | 1 Mar 2025 |
| Declaration in FORM BFile: Form B_Ph-II_Promoter.pdf | 1 Mar 2025 |
| Declaration about Commencement CertificateFile: Format D phase-II.pdf | 1 Mar 2025 |
| CERSAI detailsFile: Cersai Dec.pdf | 1 Mar 2025 |
| Details of encumbrances concerned to LegalFile: No Encum Ph II.pdf | 1 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dicloser Rajendra.pdf | 1 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser Manish sir.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 Phase II.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 Phase II.pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ph II.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 2_compressed.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 2 Q1_compressed.pdf | 1 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Majestique Empire LLP Phase 2 Q2_compressed.pdf | 1 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 Majestique Empire LLP Phase 2.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: PH-II sold unsold.pdf | 10 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Marbella commercial C, D.pdf | 7 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Marbella Ph-II wing C commercial.pdf | 15 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase - 2.pdf | 22 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed (2).pdf | 23 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (2).pdf | 23 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-II Form-3_compressed.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Empire Phase II.pdf | 23 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Phase-II_compressed.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Majestique Empire LLP Form-5 Phase II.pdf | 30 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Marbella C wing (2)_compressed.pdf | 18 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Marbella D wing_compressed.pdf | 18 Jun 2022 |
| Declaration about Commencement CertificateFile: Form D II.pdf | 12 Aug 2021 |
| Copy of the legal title reportFile: STR Kharadi 42_.pdf | 26 Jul 2021 |
| Details of encumbrancesFile: Encum.pdf | 11 Mar 2021 |
| Proforma of Allotment letterFile: Commercial Agreement.pdf | 23 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 13 Feb 2021 |
| Declaration in FORM BFile: Form B.pdf | 5 Feb 2021 |
| Layout approvalFile: 01.pdf | 4 Feb 2021 |
| Building plan approvalFile: 02.pdf | 4 Feb 2021 |
| Building plan approvalFile: 03.pdf | 4 Feb 2021 |
| Building plan approvalFile: 04.pdf | 4 Feb 2021 |
| Building plan approvalFile: 05.pdf | 4 Feb 2021 |
| Building plan approvalFile: 06.pdf | 4 Feb 2021 |
| Building plan approvalFile: 07.pdf | 4 Feb 2021 |
| Building plan approvalFile: 08.pdf | 4 Feb 2021 |
| Building plan approvalFile: 09.pdf | 4 Feb 2021 |
| Building plan approvalFile: 10.pdf | 4 Feb 2021 |
| Building plan approvalFile: 11.pdf | 4 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: 01.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 02.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 03.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 04.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 05.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 06.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 07.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 08.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 09.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 4 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 11.pdf | 4 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: C-C.pdf | 4 Feb 2021 |
| PAN CardFile: PAN_Majestique Empire.pdf | 3 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAJESTIQUE MARBELLA PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kharadi Pune
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Majestique Empire LLP
Majestique Empire LLP has 6 registrations on MahaRERA, including MAJESTIQUE MARBELLA PHASE 1 and MAJESTIQUE MARBELLA PHASE II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What does it mean that MAJESTIQUE MARBELLA PHASE II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MAJESTIQUE MARBELLA PHASE II is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAJESTIQUE MARBELLA PHASE II?
The registered promoter entity is Majestique Empire LLP, a partnership as per the filing. Its GSTIN 27ABLFM0397E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAJESTIQUE MARBELLA PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MAJESTIQUE MARBELLA PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MAJESTIQUE MARBELLA PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAJESTIQUE MARBELLA PHASE II?
The professionals named in the filing: Architect: MR JAY AERAM; Engineer: JW CONSULTANT; Chartered Accountant: NATWARLAL TAWANI; Chartered Accountant: V K Jindal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAJESTIQUE MARBELLA PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback