Red flags

  • Completion date moved by 40 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 40 months from the original
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 35%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

MAHI REGENCY is a Residential / Group Housing project by MOHAMMAD BARIK SHAUKAT SHAIKH in Palghar, Maharashtra, registered with MahaRERA as P99000030811 on 14 Sep 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 40 months from the original filing.

At a glance

Project

  • NameMAHI REGENCY
  • TypeResidential / Group Housing
  • Location
    • JAMBUR PADA
    • UMROLI WEST
    • Birwadi
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000030811
  • ReraGenie IDRG-MH-30570

Builder

  • NameMOHAMMAD BARIK SHAUKAT SHAIKH
  • Entity typeIndividual
  • GSTIN27BDPPS9978E2ZH

Key dates

this monthRegisteredSep 2021First promiseAug 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Sep 2021
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Aug 2024)
  • Buildings2 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE B1 WING BNA20000
TYPE A1 WING ANA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 35%.

TYPE B1 WING B31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE A1 WING A31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,514 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VINAY AND BASUDEO ASSOCIATESMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Permissible FSI1136.11
Proposed, not sanctioned1,136 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREE RAM SANKUL, ACHOLE ROAD, NALLASOPARA EAST

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000025876Aug 2024 → Dec 2027

Reason as filed by the promoterBUILDING WORK IS STILL NOT COMPLETED, AND FLATS ARE REMAIN UNSOLD.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FormB.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mahi Reality.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jan 2025
Details of encumbrances concerned to FinanceFile: enc to finance.pdf28 Dec 2024
Details of encumbrances concerned to FinanceFile: enc to legal.pdf28 Dec 2024
CERSAI detailsFile: no cersai.pdf28 Dec 2024
Deviation Report with respect to Allotment letterFile: deviation of Al.pdf28 Dec 2024
Details of encumbrances concerned to LegalFile: enc to legal.pdf28 Dec 2024
Details of encumbrances concerned to LegalFile: enc to finance.pdf28 Dec 2024
Deviation Report with respect to model copy of AgreementFile: deviation of agr.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disc of other business.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OLD FORM 3.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf21 Dec 2024
Proforma of Agreement for saleFile: Proforma of Agreement.pdf21 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf21 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 23-24.pdf21 Dec 2024
Building plan approvalFile: blue print type a1.pdf7 Sep 2021
Building plan approvalFile: blue print type b1.pdf7 Sep 2021
Layout approvalFile: layout mahi reality.pdf7 Sep 2021
Copy of Layout Approval (in case of layout)File: layout mahi reality.pdf7 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: blue print type a1.pdf7 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: blue print type b1.pdf7 Sep 2021
Copy of the legal title reportFile: LEGAL TITLE REPORT-rotated-compressed.pdf30 Aug 2021
Details of encumbrancesFile: letter encumbrances.pdf30 Aug 2021
Declaration about Commencement CertificateFile: comencement certificate.pdf30 Aug 2021
Declaration in FORM BFile: FORM B-compressed.pdf30 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahi Regency B1-02-compressed.pdf30 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Aug 2021
PAN CardFile: pan.pdf27 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Development-compressed (1).pdf27 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate-converted.pdf27 Aug 2021
Proforma of Allotment letterFile: PROFORMA.pdf27 Aug 2021

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 40 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHI REGENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UMROLI WEST3,200+ in Palghar

Builder: MOHAMMAD BARIK SHAUKAT SHAIKH

MOHAMMAD BARIK SHAUKAT SHAIKH has 1 registration on MahaRERA, including MAHI REGENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if MAHI REGENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHI REGENCY?

The registered promoter entity is MOHAMMAD BARIK SHAUKAT SHAIKH, an individual as per the filing. Its GSTIN 27BDPPS9978E2ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHI REGENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHI REGENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in MAHI REGENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHI REGENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHI REGENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.