Home / Browse projects / Thane, Maharashtra / Mahavir Bliss

Registered No litigation declared Others project

Mahavir Bliss

By M/s. Shivshakti Engineers

RG-MH-93936 · RERA P51700033859 · Last updated on MahaRERA portal: 11 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 120.00 crore secured on the land, in favour of JM Financial Credit Solutions Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 86%
4 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Mahavir Bliss is a Others project by M/s. Shivshakti Engineers in Thane, Maharashtra, registered with MahaRERA as P51700033859 on 14 Mar 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 180 of the 184 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameMahavir Bliss
  • TypeOthers
  • Location
    • Balkum Road
    • Balkum
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700033859
  • ReraGenie IDRG-MH-93936

Builder

  • NameM/s. Shivshakti Engineers
  • Entity typePartnership
  • PartnerPranay Shah

Key dates

this monthRegisteredMar 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed129 files

Current status

98%180 of 184 units booked
102.6%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mahavir BlissNA28231786184

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 86%.

Mahavir Bliss: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.23%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes58%
Storm Water DrainsYes30%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,402 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofJM Financial Credit Solutions Limited
Secured amountRs 120.00 crore
CERSAI search filedYes
Declared on24 Jul 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI8156.27
Proposed, not sanctioned7,529 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBuilding Number 3 Ground Floor Bhaveshwar Nagar Ghatkopar East Mumbai 400077
Estimated costRs 32.08 cr
Cost incurredRs 32.91 cr
Work done102.61%
BuildingWingEstimatedIncurred
Mahavir BlissNARs 32.08 crRs 32.91 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Vasant Salvi
EngineerAshok Bhanushali
Chartered AccountantSameer Malde
Chartered AccountantNITIN MEGHJI MARU
PartnerRole in project
M/s. Shivshakti Engineers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01122518478Dec 2025 → Dec 2026

Reason as filed by the promoterPertaining to the matter under the above caption, we would like to inform you that clause 25 of the Agreement for Sale executed with the flat purchasers as well as copy of the Agreement for Sale uploaded on the MahaRERA portal provides for a moratorium period of 12 (twelve) months from the agreed date of possession for completing the project. We would further like to state that due to shortage of semi-skilled labour on site we are unable to complete the project within the stipulated time period. We tried reaching out to the customers for their consent for applying for an extension for the said

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Mahavir Bilss.pdf11 Aug 2026
Withdrawal Update Form 1File: Architecr Certificate.pdf14 Jul 2026
Withdrawal Update Form 2File: Enginner Certificate.pdf14 Jul 2026
Withdrawal Update Form 3File: CA Certificate.pdf14 Jul 2026
Withdrawal Update Form 1File: Architect certificate.pdf13 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf13 May 2026
Withdrawal Update Form 3File: CA Certificate.pdf13 May 2026
Withdrawal Update Form 1File: Mahavir Bliss Form 1.pdf17 Feb 2026
Withdrawal Update Form 2File: Mahavir Bliss Form 2.pdf17 Feb 2026
Withdrawal Update Form 3File: Mahavir Bliss Form 3.pdf17 Feb 2026
Withdrawal Update Form 1File: Shivshakti Engineers_002.pdf1 Dec 2025
Withdrawal Update Form 1File: Shivshakti Engineers_002.pdf1 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf1 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf1 Dec 2025
Withdrawal Update Form 3File: Mahavir Bliss.pdf1 Dec 2025
Withdrawal Update Form 3File: Mahavir Bliss.pdf1 Dec 2025
Form 5 (FY 2024-2025)File: CA Certificate.pdf26 Nov 2025
Form 2A (FY 2024-2025)File: Mahavir Bliss (Form -1).pdf5 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf3 May 2025
CERSAI detailsFile: Cersai Report.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Jan 2025
CERSAI detailsFile: CERSAI Report.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2023-24).pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Dec 2024
CERSAI detailsFile: CERSAI Report.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf1 Aug 2024
CERSAI detailsFile: CERSAI Report.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Apr 2024
CERSAI detailsFile: CERSAI Report.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf18 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (2022-23).pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf15 Jan 2024
CERSAI detailsFile: CERSAI Report.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Jan 2024
Proforma of Agreement for saleFile: Agreement for Sale Mahavir Bliss.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf20 Oct 2023
CERSAI detailsFile: CERSAI Report.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf3 Aug 2023
CERSAI detailsFile: CERSAI Report.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf27 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf27 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf27 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Apr 2023
CERSAI detailsFile: CERSAI Report.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021- 2022.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf11 Jan 2023

How this compares with Thane

98%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahavir Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balkum7,600+ in Thane

2 kmMahavir BlissCompleted 144Lapsed / revoked 55Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 305 registered projects within 2 km.

Builder: M/s. Shivshakti Engineers

M/s. Shivshakti Engineers has 1 registration on MahaRERA, including Mahavir Bliss. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Mahavir Bliss is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahavir Bliss?

The registered promoter entity is M/s. Shivshakti Engineers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahavir Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahavir Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahavir Bliss?

The professionals named in the filing: Architect: Sachin Vasant Salvi; Engineer: Ashok Bhanushali; Chartered Accountant: Sameer Malde; Chartered Accountant: NITIN MEGHJI MARU. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahavir Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahavir Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahavir Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.