Completed No litigation declared Residential / Group Housing project

Mahaavir Anmol

By Mahaavir Impex

RG-MH-48282 · RERA P51700016378 · Last updated on MahaRERA portal: 11 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Mahaavir Anmol is a Residential / Group Housing project by Mahaavir Impex in Thane, Maharashtra, registered with MahaRERA as P51700016378 on 10 May 2018. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NameMahaavir Anmol
  • TypeResidential / Group Housing
  • Location
    • Plot No 16
    • Sector No 2
    • Ghansoli
    • Navi Mumbai
    • Navi Mumbai (M Corp.)
    • Thane
    • 400701
  • Pincode400701
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016378
  • ReraGenie IDRG-MH-48282

Builder

  • NameMahaavir Impex
  • Entity typePartnership
  • PartnersMohnish Chhajer, Sumitra Chhajer, Suadevi Chhajer
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2018PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2018
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,426 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2139.0
Proposed, not sanctioned2,139 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD SHOP NO 10-11-12-13-14-15 VARDHMAN MARKET PREMISES CO-OP SOCIETY SECTOR - 17 VASHI NA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSoyuz Talib Architect Pvt Ltd
Chartered AccountantKailash Chand Jain & Co
Chartered AccountantDIPIKA PATEL & CO
PartnerRole in project
Mahaavir Impex-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Dec 2024

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form -4 ARCHITECT'S CERTIFICATE 2023.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Email from Assistant Director Town Planner - RERA Completetion Project Mahaavir Anmol.pdf11 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form -4 ARCHITECT'S CERTIFICATE 2023.pdf12 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate_Mahaavir Amnol.pdf12 Nov 2024
Status of ConveyanceFile: Conveyance Deed_ Mahaavir Anmol-1-40.pdf12 Nov 2024
Status of ConveyanceFile: Conveyance Deed_ Mahaavir Anmol-41-80.pdf12 Nov 2024
Status of ConveyanceFile: Conveyance Deed_ Mahaavir Anmol-81-120.pdf12 Nov 2024
Status of ConveyanceFile: Conveyance Deed_ Mahaavir Anmol-121-136.pdf12 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 ARCHITECT'S CERTIFICATE 31-03-2020.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 ARCHITECT'S CERTIFICATE 31-03-2021.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 ARCHITECT'S CERTIFICATE 31-03-2022.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 1.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 2.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 3.pdf17 Feb 2023
Certificates of CA (Form 3)File: Form-3-CA Certificate 31-03-2020.pdf17 Feb 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate 31-03-2021.pdf17 Feb 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate 31-03-2022.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5) 2018-19.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 3 Certificates of CA (Form 5) 2020-21.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf17 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Anmol.pdf11 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Anmol.pdf11 Feb 2023
Certificates of CA (Form 5)File: Form 5 Mahaavir Anmol.pdf24 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- ENGINEER CERTIFICATE.pdf28 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- ENGINEER CERTIFICATE.pdf28 Dec 2019
Certificates of CA (Form 3)File: Anmol form 3.pdf7 Dec 2019
Certificates of CA (Form 5)File: Form 5 Anmol.pdf7 Dec 2019
Certificates of CA (Form 5)File: FORM 5 -Mahaavir Anmol.pdf15 Oct 2018
Details of encumbrancesFile: Encumbrance Anmol.pdf4 May 2018
Declaration in FORM BFile: Form B Anmol.pdf4 May 2018
Proforma of Allotment letterFile: Anmol Agreement.pdf4 May 2018
Building plan approvalFile: 1.pdf2 May 2018
Building plan approvalFile: 2.pdf2 May 2018
Building plan approvalFile: 3.pdf2 May 2018
Building plan approvalFile: 4.pdf2 May 2018
Building plan approvalFile: 5.pdf2 May 2018
Building plan approvalFile: 6.pdf2 May 2018
Building plan approvalFile: 7.pdf2 May 2018
Building plan approvalFile: 7.pdf2 May 2018
Building plan approvalFile: 9.pdf2 May 2018
Building plan approvalFile: 10.pdf2 May 2018
Layout approvalFile: 1.pdf2 May 2018
Layout approvalFile: 2.pdf2 May 2018
Layout approvalFile: 3.pdf2 May 2018
Layout approvalFile: 4.pdf2 May 2018
Layout approvalFile: 5.pdf2 May 2018
Layout approvalFile: 6.pdf2 May 2018
Layout approvalFile: 7.pdf2 May 2018
Layout approvalFile: 8.pdf2 May 2018
Layout approvalFile: 9.pdf2 May 2018
Layout approvalFile: 10.pdf2 May 2018
Copy of the legal title reportFile: TC.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 1.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 2.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 3.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 4.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 5.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 6.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 7.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 8.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 9.pdf2 May 2018
Copy of Layout Approval (in case of layout)File: 10.pdf2 May 2018
Building Plan Approval (IOD)File: 1.pdf2 May 2018
Building Plan Approval (IOD)File: 2.pdf2 May 2018
Building Plan Approval (IOD)File: 3.pdf2 May 2018
Building Plan Approval (IOD)File: 4.pdf2 May 2018
Building Plan Approval (IOD)File: 5.pdf2 May 2018
Building Plan Approval (IOD)File: 6.pdf2 May 2018
Building Plan Approval (IOD)File: 7.pdf2 May 2018
Building Plan Approval (IOD)File: 7.pdf2 May 2018
Building Plan Approval (IOD)File: 9.pdf2 May 2018
Building Plan Approval (IOD)File: 10.pdf2 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: doc20180430141837.pdf2 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf2 May 2018
PAN CardFile: Mahaavir Impex Pan Card.pdf30 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Anmol.pdf30 Apr 2018
Certificates of CA (Form 3)File: Form 3 - CA.pdf30 Apr 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mahaavir IconPlot No 89 & 90 Sector - 15 C.B.D. Belapur172CompletedAug 2013Apr 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahaavir Anmol on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghansoli, Navi Mumbai7,600+ in Thane

2 kmMahaavir AnmolCompleted 26Lapsed / revoked 10Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: Mahaavir Impex

Mahaavir Impex has 3 registrations on MahaRERA, including Mahaavir Majesty - Phase I and Mahaavir Majesty - Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Mahaavir Anmol is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahaavir Anmol?

The registered promoter entity is Mahaavir Impex, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahaavir Anmol?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahaavir Anmol?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahaavir Anmol?

The professionals named in the filing: Architect: Soyuz Talib Architect Pvt Ltd; Chartered Accountant: Kailash Chand Jain & Co; Chartered Accountant: DIPIKA PATEL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahaavir Anmol?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahaavir Anmol. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahaavir Anmol to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.