ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MADHUR AANGAN

Registration lapsed No litigation declared Residential / Group Housing project

MADHUR AANGAN

By SHREE SAI DEVELOPERS

RG-MH-15892 · RERA P52100024399 · Last updated on MahaRERA portal: 15 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 33 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2024Possession promised33 months past this date
15 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 80%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

MADHUR AANGAN is a Residential / Group Housing project by SHREE SAI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100024399 on 11 Feb 2020. Possession was promised by 15 Jan 2024 and is now 33 months past that date.

At a glance

Project

  • NameMADHUR AANGAN
  • TypeResidential / Group Housing
  • Location
    • 74 HISSA NO. 5/1
    • VILLAGE RAVET
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024399
  • ReraGenie IDRG-MH-15892

Builder

  • NameSHREE SAI DEVELOPERS
  • Entity typePartnership
  • PartnersPRAVIN SHIVJI PATEL, BHAVESH FATEHCHAND PATEL, SHAMRAO LAXMAN JADHAV
  • Other registrations28 more →
  • Completed9 of 29
  • No longer live11 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

33 months past promisethis monthRegisteredFeb 2020PromisedJan 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Feb 2020
  • Promised completion15 Jan 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA110000
BNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 80%.

A72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed115

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots115
Closed/Covered80
Open Space35
BuildingClosed/CoveredOpen SpaceTotal
A642589
B161026

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,658 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
BASHIR GULAB MULANIPimpri Chinchawad (M Corp.)Pune
VAZIR GULAB MULANIPimpri Chinchawad (M Corp.)Pune
BABAMIYA RAMJAN MULANIPimpri Chinchawad (M Corp.)Pune
SHREE LAXMI DEVELOPERSPimpri Chinchawad (M Corp.)Pune
MRS. SHREE LAXMI DEVELOPERSPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI7300.0
Proposed, not sanctioned7,300 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHINCHWAD, PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPATIL & BUGADE ASSOCIATES
EngineerK P BADGUJAR CONSULTANTS PVT LTD
Chartered AccountantBHARAT H SHAH
PartnerRole in project
SHREE SAI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Nov 2024

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Madhuranagan.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 Arct Certificate (1).pdf12 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A Wing Completion Certificate.pdf12 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera (1).pdf6 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: B Wing Society Certificate.pdf6 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B Wing Completion.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CERTIFICATE (1).pdf5 Mar 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: society.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 23.pdf15 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 madhur aangan.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Shree Sai Developers.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold 1_merged.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From No 5_page-0001.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Car 1_merged.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arct 1_merged.pdf6 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhur Aangan.pdf6 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold unsold 1_merged.pdf6 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Madhurangan_compressed.pdf18 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold data.pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (3).pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Madhurangan.pdf30 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Madhur Aangan.pdf30 Mar 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold (2).pdf30 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE SAI DEV - RERA FORM 3_compressed.pdf30 Mar 2022
Declaration about Commencement CertificateFile: Format D 2.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: sold unsold (2).pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SHREE SAI DEV - FORM 5 - 20-21.pdf29 Sep 2021
Layout approvalFile: Revise layout.pdf22 Sep 2021
Copy of Layout Approval (in case of layout)File: Revise layout.pdf22 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate_compressed.pdf22 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2).pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_compressed.pdf22 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE UPTO APRIL 21.pdf31 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf31 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf31 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf31 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf31 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf31 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE UPTO APRIL 21.pdf31 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE UPTO JULY 21.pdf31 Aug 2021
Declaration about Commencement CertificateFile: Format D.pdf16 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Madhuraangan form 1 feb 21.pdf16 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuraangan form 2 feb 21.pdf16 Aug 2021
Disclosure of sold/ booked inventoryFile: sold unsold.pdf16 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE SAI RERA CERT UPTO 31-01-2021.pdf16 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B Wing Completion.pdf16 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: scan copy of madhur aangan.pdf19 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE SAI RERA CERT.pdf19 Nov 2020
OtherFile: 03.pdf18 Apr 2020
OtherFile: 04.pdf18 Apr 2020
OtherFile: 05.pdf18 Apr 2020
OtherFile: 088.pdf18 Apr 2020
Layout approvalFile: Scanned.pdf24 Jan 2020
Building plan approvalFile: IOD.pdf24 Jan 2020
PAN CardFile: shree sai developer pan.pdf24 Jan 2020
Copy of the legal title reportFile: search and title report.pdf24 Jan 2020
Copy of the legal title reportFile: Power of Attorney ( Mulani ) 2018_compressed.pdf24 Jan 2020
Copy of the legal title reportFile: power of attorney ( Laxmi Developers ) 2019_compressed.pdf24 Jan 2020
Details of encumbrancesFile: encumbrance.pdf24 Jan 2020
Copy of Layout Approval (in case of layout)File: Scanned.pdf24 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf24 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: commecement_compressed.pdf24 Jan 2020
Declaration in FORM BFile: Form B_compressed.pdf24 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf24 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_compressed.pdf24 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf24 Jan 2020
Proforma of Allotment letterFile: agreement for sale.pdf24 Jan 2020
Proforma of Allotment letterFile: allotment letter.pdf24 Jan 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MADHUR AANGAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE RAVET13,700+ in Pune

2 kmMADHUR AANGANCompleted 107Lapsed / revoked 57Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 282 registered projects within 2 km.

Builder: SHREE SAI DEVELOPERS

SHREE SAI DEVELOPERS has 29 registrations on MahaRERA, including SAI ENCLAVE and CAPETOWN VILLAS. Its filings disclose 9 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that MADHUR AANGAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MADHUR AANGAN is delayed beyond 15 Jan 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADHUR AANGAN?

The registered promoter entity is SHREE SAI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADHUR AANGAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MADHUR AANGAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADHUR AANGAN?

The professionals named in the filing: Architect: PATIL & BUGADE ASSOCIATES; Engineer: K P BADGUJAR CONSULTANTS PVT LTD; Chartered Accountant: BHARAT H SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADHUR AANGAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADHUR AANGAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADHUR AANGAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.