Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
M Soul Strings Wing C is a Others project by Malpani Estates in Pune, Maharashtra, registered with MahaRERA as P52100055678 on 8 Apr 2024. Possession is promised by 31 Dec 2029. 117 of the 155 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameM Soul Strings Wing C
- TypeOthers
- Location
- Pashan
- Haveli
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100055678
- ReraGenie IDRG-MH-69864
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Apr 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed103 files
Current status
Figures as on 28 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building C | NA | 25 | 21 | 155 | 0 | 155 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.
Building C: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 13% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed120
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Orion Developers | Pune (M Corp.) | Pune |
| Murlidhar Nimhan | Pune (M Corp.) | Pune |
| Vishwas Nimhan | Pune (M Corp.) | Pune |
| Maruti Nimhan | Pune (M Corp.) | Pune |
| Pandurang Nimhan | Pune (M Corp.) | Pune |
| Ranjana Nimhan | Pune (M Corp.) | Pune |
| Pankaj Nimhan | Pune (M Corp.) | Pune |
| Pritam Nimhan | Pune (M Corp.) | Pune |
| Tanaji Nimhan | Pune (M Corp.) | Pune |
| Sambhaji Nimhan | Pune (M Corp.) | Pune |
| SCN Builders and Developers | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building C | NA | Rs 97.94 cr | Rs 55.95 cr |
| - | NA | Rs 35.68 cr | Rs 28.54 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Tripti Gupta |
| Engineer | Prashant Khivansara |
| Chartered Accountant | V S A P & Company |
| Partner | Role in project |
|---|---|
| Malpani Estates | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 856/2025 | Hon'ble D J Patil Court | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503164 | Tanaji Ramchndra Nimhan | Malpani Estates | 08/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect M Soul Strings Wing C as on 31032026.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer M Soul Strings Wing C as on 31032026.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: Form 3 CA M Soul Strings Wing C as on 31032026.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Form 1 Architect M Soul Strings Wing C as on 31122025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer M Soul Strings Wing C as on 31122025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 CA M Soul Strings Wing C as on 31122025_compressed.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Architect M Soul Strings Wing C_30092025.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer M Soul Strings Wing C_30092025.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: Form C CA M Soul Strings Wing C_30092025_compressed.pdf | 16 Dec 2025 |
| Building plan approvalFile: C wing marking on 12_18.pdf | 18 Nov 2025 |
| Building plan approvalFile: C wing marking on 01-18_compressed.pdf | 18 Nov 2025 |
| Form 1File: M Soulstrings Wing C Architect Form 1 as on 31122024.pdf | 22 Aug 2025 |
| Form 2File: M Soulstrings Wing C Engineer Form 2 as on 31122024.pdf | 22 Aug 2025 |
| Form 3File: M Soulstrings Wing C CA Form 3 as on 31122024.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: M Soulstrings Wing C Sold Unsold as on 31122024.pdf | 22 Aug 2025 |
| Form 1File: Form 1 Architect M Soul Strings Wing C as on 31032025.pdf | 22 Aug 2025 |
| Form 2File: Form 2 Engineer M Soul Strings Wing C as on 31032025.pdf | 22 Aug 2025 |
| Form 3File: Form 3 CA M Soul Strings Wing C as on 31032025.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_M Soul Strings Wing C as on 31032025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 Architect M Soul Strings Wing C_30062025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer M Soul Strings Wing C_30062025.pdf | 22 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 M Soul Strings Wing C_30062025_compressed.pdf | 22 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M SOulstrings Wing C Architect Form 1 as on 30092024.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M Soulstrings Wing C Architect Form 1 as on 31122024.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: M Soulstrings Wing C CA Form 3 as on 30092024.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: M Soulstrings Wing C CA Form 3 as on 31122024.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: M Soulstrings Wing C Engineer Form 2 as on 30092024.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: M Soulstrings Wing C Engineer Form 2 as on 31122024.pdf | 1 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: M Soulstrings Wing C Sold Unsold as on 30092024.pdf | 1 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: M Soulstrings Wing C Sold Unsold as on 31122024.pdf | 1 Mar 2025 |
| Proforma of Agreement for saleFile: M Soul Strings C Wing_10092024_Agreement Draft_RERA to Upload.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Wing C as on 30062024.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Wing Cas on 30062024.pdf | 24 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Wing C as on 30062024.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Wing C as on 300624_compressed.pdf | 24 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Cum Undertaking - Bank Account Change 1807_rotated.pdf | 19 Jul 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HDFC Bank Declaration M Soul string Wing C.pdf | 5 Jul 2024 |
| Declaration in FORM BFile: Declaratin in Form B Correction Application_rotated.pdf | 4 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer -Declration.pdf | 4 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA- Not Applicable Declration.pdf | 4 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Declaration- M Soul strings Wing C, Bank Account.pdf | 4 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Separate Bank Account Declaration.pdf | 4 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: New Bank Declaration order 56.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure WIn C.pdf | 28 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Architects's Certificate-24-06-2024.pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 M Soul Strings wing C.pdf | 25 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 M Soulstrings Wing C as on 31052024_compressed.pdf | 25 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 M Soulstrings Wing C as on 31052024_compressed.pdf | 25 Jun 2024 |
| Other - FinanceFile: Annexure A Declaration- M Soul strings Wing C, Bank Account_compressed (1).pdf | 25 Jun 2024 |
| Other - FinanceFile: Annexure A Declaration- M Soul strings Wing C, Bank Account_compressed (1).pdf | 25 Jun 2024 |
| Other - FinanceFile: Annexure A Declaration- M Soul strings Wing C, Bank Account_compressed (1).pdf | 25 Jun 2024 |
| Building plan approvalFile: 8-18 FSI Marked_compressed.pdf | 5 Apr 2024 |
| Building plan approvalFile: 9-18_compressed.pdf | 5 Apr 2024 |
| Building plan approvalFile: 10-18_compressed.pdf | 5 Apr 2024 |
| Building plan approvalFile: LAYOUT PLAN-ModeL (2).pdf | 5 Apr 2024 |
| Building plan approvalFile: 11-18_compressed.pdf | 5 Apr 2024 |
| Building plan approvalFile: 12-18_compressed.pdf | 5 Apr 2024 |
| Building plan approvalFile: Badminton Area declaration.pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8-18 FSI Marked_compressed.pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9-18_compressed.pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-18_compressed.pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN-ModeL (2).pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-18_compressed.pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-18_compressed.pdf | 5 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Badminton Area declaration.pdf | 5 Apr 2024 |
| Declaration about Commencement CertificateFile: CC Declaration 110324.pdf | 11 Mar 2024 |
| Layout approvalFile: 8-18 FSI Marked_compressed.pdf | 19 Feb 2024 |
| Layout approvalFile: 9-18_compressed.pdf | 19 Feb 2024 |
| Layout approvalFile: 10-18_compressed.pdf | 19 Feb 2024 |
| PAN CardFile: PAN-ME.pdf | 19 Feb 2024 |
| Copy of the legal title reportFile: Title Certificate - Plot B.pdf | 19 Feb 2024 |
| Copy of the legal title reportFile: Title flow -Plot B_compressed.pdf | 19 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf | 19 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbracnes Legal.pdf | 19 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf | 19 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbracnes Legal.pdf | 19 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 8-18 FSI Marked_compressed.pdf | 19 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 9-18_compressed.pdf | 19 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 10-18_compressed.pdf | 19 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 19 Feb 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| M VIVANTA | Balewadi Pune | 232 | Completed | Mar 2023 | Late, Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep M Soul Strings Wing C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pashan13,700+ in Pune
Filed coordinates, straight-line distance. 115 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Malpani Estates
Malpani Estates has 3 registrations on MahaRERA, including M-VIVANTA and M Soul Strings Wing C. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if M Soul Strings Wing C is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of M Soul Strings Wing C?
The registered promoter entity is Malpani Estates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in M Soul Strings Wing C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against M Soul Strings Wing C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for M Soul Strings Wing C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at M Soul Strings Wing C?
The professionals named in the filing: Architect: Tripti Gupta; Engineer: Prashant Khivansara; Chartered Accountant: V S A P & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in M Soul Strings Wing C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback