Home / Browse projects / Pune, Maharashtra / Lodha Pune NIBM Project-Tower 5

Completed No litigation declared Residential / Group Housing project

Lodha Pune NIBM Project-Tower 5

By Lodha Developers Limited

RG-MH-86531 · RERA P52100045768 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 95%
2 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Lodha Pune NIBM Project-Tower 5 is a Residential / Group Housing project by Lodha Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100045768 on 9 Jun 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. 109 of the 111 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameLodha Pune NIBM Project-Tower 5
  • TypeResidential / Group Housing
  • Location
    • Mohammad Wadi
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • RERA no.P52100045768
  • ReraGenie IDRG-MH-86531

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • MdAbhishek Mangalprabhat Lodha
  • DirectorsMukund Manohar Chitale, Rajeev Bakshi, Harita Gupta, Rajinder Pal Singh, Ashwani Kumar, LEE ANTHONY POLISANO, Shaishav Dharia
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredJun 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

98%109 of 111 units booked
98.4%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 5NA30301110111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

TOWER 5: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed178

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots178
Closed/Covered178

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,320 sq m
Land owned byNot the promoter
Named landowners1
Declared on26 Sep 2025
LandownerVillageDistrict
Shree balaji RealtyPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI11351.17
Proposed, not sanctioned11,351 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMistry Bhavan, Mumbai
Estimated costRs 50.03 cr
Cost incurredRs 49.25 cr
Work done98.43%
BuildingWingEstimatedIncurred
TOWER 5NARs 32.52 crRs 32.51 cr
-NARs 17.51 crRs 16.74 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPradeepmkamble and associates
EngineerAmeernavaj Inamdar
EngineerK C Shah Consultants
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A
PartnerRole in project
Lodha Developers Limited-

Litigation declared2

CaseCourtStatus
898/2014Chief Judicial Magistrate PuneHearing
279/2020Civil Judge Sr Div PuneHearing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: NIBM- Full OC- Tower-5.pdf15 May 2026
Withdrawal Update Form 1File: Form1 - Lodha Pune NIBM Project-Tower 5 - P52100045768.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Layout approvalFile: Layout - NIBM-RERA-T5 highlight - 25-7-2025.pdf30 Mar 2026
Building plan approvalFile: 1_30 T5 -Parking - 25-07-2025 - Compress.pdf30 Mar 2026
Building plan approvalFile: 2_40 T5 - 25-07-2025 - Compress.pdf30 Mar 2026
Building plan approvalFile: 3_50 T5 - 25-07-2025 - Compress.pdf30 Mar 2026
Form 1File: Form 1-t5.pdf26 Mar 2026
Form 2File: Form 2-t5.pdf26 Mar 2026
Form 3File: Form 1-t5.pdf26 Mar 2026
Disclosure of Sold and Booked InventoryFile: Form 1-t5.pdf26 Mar 2026
OthersFile: NIBM OC Tower 5.pdf26 Mar 2026
Withdrawal Update Form 1File: From 1 NIBM 5 Dec-25.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 NIBM T5.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 NIBM T5.pdf24 Jan 2026
Withdrawal Update Form 1File: Lodha Pune NIBM Project-Tower 5 pdf-scan.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2 - T5.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3 - Nibm T5.pdf27 Oct 2025
Building plan approvalFile: Building Plan_1 T5.pdf14 Oct 2025
Building plan approvalFile: Building Plan_2 T5.pdf14 Oct 2025
Building plan approvalFile: Building Plan_3 T5.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Lodha Pune NIBM Poject Tower 5.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Lodha Pune NIBM Project-Tower 5 - P52100045768 - Form 2A.pdf25 Aug 2025
Self-declaration of Quarterly ProgressFile: Layout for Tower-5 For Upload.pdf6 Aug 2025
OthersFile: T5 Building Plans.pdf6 Aug 2025
Form 1File: REV CC NIBM.pdf6 Aug 2025
Form 2File: For Upload.pdf6 Aug 2025
Form 3File: For Upload.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: For Upload.pdf6 Aug 2025
Form 1File: Lodha Pune NIBM - Tower 5 - Form1 - June 25 - P52100045768 -okk.pdf18 Jul 2025
Form 2File: Form 2 - NIBM 5 - Jun 25.pdf18 Jul 2025
Form 3File: Form 3 - Nibm 5 - Jun 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Nibm 5 - Jun 25.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nibm tower 5 - Mar 25.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nibm Tower 5 - Mar 25.pdf23 May 2025
Form 1File: Lodha Pune NIBM Project Tower 5.pdf6 May 2025
Form 2File: Form 2 - Nibm Tower 5 - Mar 25.pdf6 May 2025
Form 3File: Form 3 - Nibm tower 5 - Mar 25.pdf6 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - NIBM 5 - Mar 25.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Pune NIBM Project Tower 5.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nibm Tower 5 - Dec 24 (Rev) - Revised.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - NIBM tower 5 - P52100045768 - Dec 24.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nibm tower 5 - P52100045768 - Dec 24.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold unsold - NIBM tower 5 - P52100045768 - Dec 24 (1).pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Pune NIBM Project Tower 5.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Lodha Pune NIBM Project-Tower 5.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lodha Pune NIBM Project-Tower 5.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lodha Pune NIBM Project-Tower 5.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NIBM tower 5.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P52100045768 - Lodha Pune NIBM Project-Tower 5.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Pune NIBM Project-Tower 5 - P52100045768.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Pune NIBM Project-Tower 5 - P52100045768 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Lodha Pune NIBM Project-Tower 5 - P52100045768 - June24.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Pune NIBM Project-Tower 5 - P52100045768 - March 24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lodha Pune NIBM Project-Tower 5 - P52100045768 - March 24.pdf7 May 2024
Layout approvalFile: sheet no 1 - converted (3)_rotated.pdf18 Apr 2024
Copy of Layout Approval (in case of layout)File: sheet no 1 - converted (3)_rotated.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Pune NIBM Project-Tower 5 - P52100045768 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Pune NIBM Project-Tower 5 - P52100045768 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Lodha Pune NIBM Project Tower 5 - Sep23 - P52100045768.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Pune NIBM Project Tower 5 - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Pune NIBM Project-Tower 5.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Lodha Pune NIBM - Tower 05 March 23.pdf23 Jul 2023
Disclosure of sold/ booked inventoryFile: Lodha Pune Signet Project - Tower 05 June 23.pdf23 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 128 Lodha Pune NIBM Project-Tower 5.pdf23 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 24 Lodha Pune NIBM Project- Tower 5.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Lodha Pune NIBM Project-Tower 5.pdf30 Mar 2023
Details of encumbrances concerned to LegalFile: Lodha Pune NIBM Project-Tower 5.pdf24 Aug 2022
Layout approvalFile: New IOD LAYOUT_compressed.pdf6 Jul 2022
Layout approvalFile: New IOD LAYOUT-cropped-2_compressed (3).pdf6 Jul 2022
Copy of Layout Approval (in case of layout)File: New IOD LAYOUT_compressed.pdf6 Jul 2022
Copy of Layout Approval (in case of layout)File: New IOD LAYOUT-cropped-2_compressed (3).pdf6 Jul 2022
Copy of the legal title reportFile: NEW TR.pdf30 May 2022
Commencement Certificates / NA Order for plotted developmentFile: cc uPLAOD.pdf30 May 2022
Declaration about Commencement CertificateFile: CC Dec Updated.pdf30 May 2022
Layout approvalFile: Pune NIBM - Layout_Final.pdf5 May 2022
Copy of Layout Approval (in case of layout)File: Pune NIBM - Layout_Final.pdf5 May 2022
PAN CardFile: Macrotech Developers Ltd PAN CARD.pdf27 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Lodha Belmondo - Tower 31P52100020172Belmondo, Pune85Mar 2019CompletedMar 2025Apr 2024

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Pune NIBM Project-Tower 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mohammad Wadi13,700+ in Pune

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Lodha Pune NIBM Project-Tower 5 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Pune NIBM Project-Tower 5?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Pune NIBM Project-Tower 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lodha Pune NIBM Project-Tower 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Pune NIBM Project-Tower 5?

The professionals named in the filing: Architect: Pradeepmkamble and associates; Engineer: Ameernavaj Inamdar; Engineer: K C Shah Consultants; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Pune NIBM Project-Tower 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Pune NIBM Project-Tower 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Pune NIBM Project-Tower 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.