Home / Browse projects / Pune, Maharashtra / Lodha Belmondo St. Andrews B,C,D Villa 1 to 28

Completed No litigation declared Residential / Group Housing project

Lodha Belmondo St. Andrews B,C,D Villa 1 to 28

By Macrotech Developers Limited

RG-MH-02647 · RERA P52100000283 · Last updated on MahaRERA portal: 17 Jun 2024

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2018Possession promisedregistration recorded completed
132 of 187Construction stages doneacross 17 buildings; furthest along: Podiums (if any), 0%
5Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Lodha Belmondo St. Andrews B,C,D Villa 1 to 28 is a Residential / Group Housing project by Macrotech Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100000283 on 12 Jul 2017. The registration is recorded completed; possession was promised by 31 Jul 2018. 5 complaints are on record with the regulator.

At a glance

Project

  • NameLodha Belmondo St. Andrews B,C,D Villa 1 to 28
  • TypeResidential / Group Housing
  • Location
    • .
    • Gahunje
    • Mawal
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000283
  • ReraGenie IDRG-MH-02647

Builder

  • NameMacrotech Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsRajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017PromisedJul 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Jul 2017
  • Promised completion31 Jul 2018
  • Revised completionNone
  • Buildings17 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LODHA BELMONDO ST ANDREWS BNA230000
LODHA BELMONDO ST ANDREWS CNA230000
LODHA BELMONDO ST ANDREWS DNA230000
LODHA BELMONDO VILLA 1,2NA30000
LODHA BELMONDO VILLA 3,4NA30000
LODHA BELMONDO VILLA 5,6NA30000
LODHA BELMONDO VILLA 7,8NA30000
LODHA BELMONDO VILLA 9,10NA30000
LODHA BELMONDO VILLA 11,12NA30000
LODHA BELMONDO VILLA 13,14NA30000
LODHA BELMONDO VILLA 15,16NA30000
LODHA BELMONDO VILLA 17,18NA30000
LODHA BELMONDO VILLA 19,20NA30000
LODHA BELMONDO VILLA 21,22NA30000
LODHA BELMONDO VILLA 23,24NA30000
LODHA BELMONDO VILLA 25,26NA30000
LODHA BELMONDO VILLA 27,28NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building17

As on 17 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

132 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Podiums (if any), at 0%.

LODHA BELMONDO ST ANDREWS B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LODHA BELMONDO ST ANDREWS C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LODHA BELMONDO ST ANDREWS D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LODHA BELMONDO VILLA 1,264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 3,464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 5,664%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 7,864%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 9,1064%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 11,1264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 13,1464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 15,1664%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 17,1864%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 19,2064%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 21,2264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 23,2464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LODHA BELMONDO VILLA 25,2682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LODHA BELMONDO VILLA 27,2882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 17 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Access to Landscaped AreasYes100%

Parking filed514

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots514
Closed/Covered74
Open Space440
BuildingClosed/CoveredOpen SpaceTotal
LODHA BELMONDO ST ANDREWS B28134162
LODHA BELMONDO ST ANDREWS C23139162
LODHA BELMONDO ST ANDREWS D23139162
LODHA BELMONDO VILLA 1,2022
LODHA BELMONDO VILLA 3,4022
LODHA BELMONDO VILLA 5,6022
LODHA BELMONDO VILLA 7,8022
LODHA BELMONDO VILLA 9,10022
LODHA BELMONDO VILLA 11,12022
LODHA BELMONDO VILLA 13,14022
LODHA BELMONDO VILLA 15,16022
LODHA BELMONDO VILLA 17,18022
LODHA BELMONDO VILLA 19,20022
LODHA BELMONDO VILLA 21,22022
LODHA BELMONDO VILLA 23,24022
LODHA BELMONDO VILLA 25,26022
LODHA BELMONDO VILLA 27,28022

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,434 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI50326.42
Proposed, not sanctioned50,326 sq m
Buildings approved17
Buildings sanctioned17

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, INDUSTRY HOUSE, OPP RAMON HOUSE, 159 H T PAREKH MARG, CHURCHGATE, MUMBAI - 400020

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Lodha Developers Limited-

Litigation declared1

CaseCourtStatus
137/2019City Civil Court VadgaonNA

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC005000000010435MAHENDRA JAGANNATH TIWARIPALAVA DEVELLERS PVT LTD( LODHA DEVELOPMENT PVT LTD)17/10/2017
CC005000000064740Amar Pal SinghMacrotech Developers Limited02/11/2020
CC005000000085412Surendra AgarwalMacrotech Developers Ltd.14/05/2021
CC005000000279868Macrotech Developers Ltd.Rahul Passi18/12/2023
CC005000000279885Macrotech Developers Ltd.Vishal Passi18/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Nov 2021

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold Unsold - LODHA BELMONDO ST ANDREWS B C D VILLA 1 TO 28 - P52100000283 - March 24.pdf17 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - LODHA BELMONDO ST ANDREWS B C D VILLA 1 TO 28 - P52100000283 - Dec23.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: LODHA BELMONDO ST ANDREWS B C D VILLA 1 TO 28 - P52100000283 - Sep23.pdf27 Dec 2023
Layout approvalFile: Sheet no-1 (1) (1)_compressed.pdf23 Jan 2023
Copy of Layout Approval (in case of layout)File: Sheet no-1 (1) (1)_compressed.pdf23 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate-St-Andrews.pdf13 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Andrews B and Pebble Beach E.pdf22 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Andrews C,D and Villa.pdf22 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Belmondo St Andrews B C D Villa 1-28.pdf25 Aug 2020
Details of encumbrancesFile: Andrews BCD Villas.pdf19 Aug 2019
OtherFile: LDL to MDL.pdf29 May 2019
Details of encumbrancesFile: BELMONDO ANDREWS B C D VILLAS.pdf25 Feb 2019
Details of encumbrancesFile: Belmondo St Andrews BCD Villa 1 to 28.pdf16 Nov 2018
Proforma of Allotment letterFile: ATS_Tower 24_16 October 2018.pdf3 Nov 2018
Certificates of CA (Form 5)File: BELMONDO ANDREWS B C D VILLA 1 TO 28.pdf1 Oct 2018
Certificates of Architect (Form 4)File: Andrews BCD and Villas.pdf17 Aug 2018
Details of encumbrancesFile: Lodha Belmondo - Andrews B C D Villas.pdf14 Aug 2018
Copy of the legal title reportFile: 15_Second Supplemental _Lodha Belmondo.pdf17 May 2018
Details of encumbrancesFile: Belmondo St Andrews B C D Villas.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: CC FINAL1.pdf19 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC FINAL 2.pdf19 Jan 2018
Certificates of Architect (Form 4)File: Lodha Belmondo St Andrews B C D and Villas.pdf1 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lodha Belmondo St Andrews B C D and Villas.pdf8 Nov 2017
Proforma of Allotment letterFile: ATS (Belmondo) - v2 - 2 November 2017.pdf6 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: St Andrews B C D and Villas (R).pdf7 Jul 2017
Declaration in FORM BFile: Belmondo St Andrews B,C,D and Villa one to Twenty Eight.pdf6 Jul 2017
Certificates of CA (Form 3)File: Segment 001 of Belmondo St Andrews B C D and Villas 1 to 28(R).pdf6 Jul 2017
Certificates of CA (Form 3)File: Segment 002 of Belmondo St Andrews B C D and Villas 1 to 28(R).pdf6 Jul 2017
Certificates of CA (Form 3)File: Segment 003 of Belmondo St Andrews B C D and Villas 1 to 28(R).pdf6 Jul 2017
Certificates of CA (Form 3)File: Segment 004 of Belmondo St Andrews B C D and Villas 1 to 28(R).pdf6 Jul 2017
Certificates of CA (Form 3)File: Segment 005 of Belmondo St Andrews B C D and Villas 1 to 28(R).pdf6 Jul 2017
Building plan approvalFile: 46 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 47 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 48 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 49 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 50 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 51 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 52 (R)pdf.pdf4 Jul 2017
Building plan approvalFile: 57(R) pdf.pdf4 Jul 2017
Building plan approvalFile: 58 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 46 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 47 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 48 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 49 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 50 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 51 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 52 (R)pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 57(R) pdf.pdf4 Jul 2017
Building Plan Approval (IOD)File: 58 (R)pdf.pdf4 Jul 2017
Details of encumbrancesFile: Encumbrance Lodha Belmondo St Andrews B,C,D,Villa one to Twenty Eight.pdf3 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: One Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Two Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Four Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Five Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Six Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Seven Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eight Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nine Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ten Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eleven Lodha Belmondo - St Andrews B,C,D and Villa 1 to 28 - Form One.pdf1 Jul 2017
Layout approvalFile: T-22,23,24,Villa-1 to 28 PDF.pdf29 Jun 2017
Copy of Layout Approval (in case of layout)File: T-22,23,24,Villa-1 to 28 PDF.pdf29 Jun 2017
Proforma of Allotment letterFile: Allotment Letter and Agreement to sale.pdf29 Jun 2017
Copy of the legal title reportFile: Title Report V2.pdf28 Jun 2017
PAN CardFile: PALAVA DWELLERS PVT LTD PAN CARD.pdf26 Jun 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PALAVA SAVANNA AND SIENAKalyan Shilphata Road423CompletedAug 2020Sep 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Belmondo St. Andrews B,C,D Villa 1 to on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .13,700+ in Pune

2 kmLodha Belmondo St. AndreCompleted 22Lapsed / revoked 17Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 95 registered projects within 2 km.

Builder: Macrotech Developers Limited

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Lodha Belmondo St. Andrews B,C,D Villa 1 to 28 is delayed beyond 31 Jul 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Belmondo St. Andrews B,C,D Villa 1 to 28?

The registered promoter entity is Macrotech Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Belmondo St. Andrews B,C,D Villa 1 to 28?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lodha Belmondo St. Andrews B,C,D Villa 1 to 28?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lodha Belmondo St. Andrews B,C,D Villa 1 to 28?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Lodha Belmondo St. Andrews B,C,D Villa 1 to 28?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Belmondo St. Andrews B,C,D Villa 1 to 28. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Belmondo St. Andrews B,C,D Villa 1 to to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.