Lodha Belmondo St. Andrews A
By Macrotech Developers Limited
RG-MH-04743 · RERA P52100020156 · Last updated on MahaRERA portal: 19 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 140 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lodha Belmondo St. Andrews A is a Residential / Group Housing project by Macrotech Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100020156 on 29 Mar 2019. The registration is recorded completed; possession was promised by 28 Feb 2027.
At a glance
Project
- NameLodha Belmondo St. Andrews A
- TypeResidential / Group Housing
- Location
- Mumbai Express Highway
- Belmondo
- Gahunje
- Mawal
- Pune
- 412101
- Pincode412101
- RERA no.P52100020156
- ReraGenie IDRG-MH-04743
Builder
- NameMacrotech Developers Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsRajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha
- Other registrations140 more →
- Completed126 of 141
- No longer live13 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Mar 2019
- Promised completion28 Feb 2027
- Revised completionNone
- Buildings1 building record
- Documents filed118 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| St Andrews-Tower 21 | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
St Andrews-Tower 21: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 100% |
| Closed Parking | Yes | 100% |
Parking filed162
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH CONSULTANTS |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATES |
| Chartered Accountant | Chirag Sarvaiya & Co |
| Partner | Role in project |
|---|---|
| Lodha Developers Limited | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 556/2016 | Court of Civil Judge Pune | Issues |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Apr 2025
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: OC Full - Belmondo T21 - Compress.pdf | 19 Jul 2025 |
| Form 2File: Declaration Form 2 and 3-June-25.pdf | 19 Jul 2025 |
| Form 3File: Declaration Form 2 and 3-June-25.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: OC Full - Belmondo T21 - Compress.pdf | 19 Jul 2025 |
| Form 1File: Form-1 Lodha Belmondo Tower 21 St Andrew A.pdf | 19 Jul 2025 |
| Form 2File: Declaration Form-2- Mar-25 -1.pdf | 19 Jul 2025 |
| Form 3File: Declaration Form-3- Mar-25 -1.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Declaration Form-3- Mar-25 -1.pdf | 19 Jul 2025 |
| OthersFile: OC Full - Belmondo T21.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Belmondo Tower 21 St Andrew A.pdf | 2 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Full - Belmondo T21 - Compress.pdf | 2 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Belmondo Tower 21 - P52100020156 - Dec 24.pdf | 12 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 - Belmondo Tower 21 - Dec 24 (Rev).pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Belmondo Tower 21 - Dec 24 (Rev).pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Belmondo Tower 21 - P52100020156 - Dec 24.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Form 2 - Belmondo Tower 21 - P52100020156 - Dec 24.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Belmondo St Andrews A.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - March 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - June 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - Sep 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - Dec 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - March 24.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - June 24.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GetUserDocumentFileContent (17).pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - March 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - June 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - Sep 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - Dec 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - March 24.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - June 24.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - Sep 24.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 - belmondo Tower 21 - Sep24.pdf | 18 Nov 2024 |
| OtherFile: MDL Authority for RERA Registration.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 21-22.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 22-23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - March 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - June 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - Sep 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - Dec 23.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - March 24.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - June 24.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 and 3 - Sep 24.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 - belmondo Tower 21 - Sep24.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - June 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GetUserDocumentFileContent (17).pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - June 24.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - March 24.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - Dec 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - Sep 23.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 and 3 - March 23.pdf | 18 Nov 2024 |
| OtherFile: MDL Authority for RERA Registration.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 21-22.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 22-23.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: belmondo Tower 21.pdf | 5 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - belmondo Tower 21 - Sep24.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Belmondo - Tower 30_001.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Belmondo - Twr 21 St Andrews A - P52100020156.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Belmondo - Twr 21 St Andrews A - P52100020156.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P52100020156 - Lodha Belmondo - St Andrews A.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Belmondo - Twr 21(St Andrews A) - P52100020156.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Belmondo - Twr 21 St Andrews A - P52100020156 - June24.pdf | 10 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Belmondo - Twr 21(St Andrews A) - P52100020156 - June24.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Belmondo - Twr 21(St Andrews A) - P52100020156 - March 24.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Belmondo - Twr 21 St Andrews A - P52100020156 - march 24.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - LODHA BELMONDO - St Andrews A 21 - P52100020156 - Dec23.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Belmondo - Twr 21(St Andrews A) - P52100020156 - Dec23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: LODHA BELMONDO - St Andrews A 21 - P52100020156.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Belmondo St Andrews A 21 - Form1 - Sep23.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Belmondo - St Andrews A.pdf | 17 Oct 2023 |
| Certificates of CA (Form 3)File: 62 LODHA BELMONDO - St Andrews A.pdf | 24 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Belmondo 21 - A - March23.pdf | 23 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Belmondo 21 - A - June23.pdf | 23 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 62 bank Belmondo T21.pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Belmondo _T21.pdf | 29 Mar 2023 |
| Layout approvalFile: Sheet no-1 (1) (1)_compressed.pdf | 23 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Sheet no-1 (1) (1)_compressed.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 74 LODHA BELMONDO - St Andrews A.pdf | 14 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LODHA BELMONDO - St Andrews A.pdf | 29 Aug 2022 |
| Certificates of CA (Form 3)File: 74 LODHA BELMONDO - St Andrews A.pdf | 10 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 74 LODHA BELMONDO - St Andrews A.pdf | 30 Jun 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PALAVA SAVANNA AND SIENA | Kalyan Shilphata Road | 423 | Completed | Aug 2020 | Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 140 other registrations, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
Keep Lodha Belmondo St. Andrews A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belmondo13,700+ in Pune
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Macrotech Developers Limited
Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Lodha Belmondo St. Andrews A is delayed beyond 28 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lodha Belmondo St. Andrews A?
The registered promoter entity is Macrotech Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lodha Belmondo St. Andrews A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Lodha Belmondo St. Andrews A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lodha Belmondo St. Andrews A?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lodha Belmondo St. Andrews A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback