Registration lapsed No litigation declared Residential / Group Housing project

Life Canvas Phase 1

By Vighnaharta Reality

RG-MH-21956 · RERA P52100032021 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
14 of 251Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 190 documents Report an error

Life Canvas Phase 1 is a Residential / Group Housing project by Vighnaharta Reality in Pune, Maharashtra, registered with MahaRERA as P52100032021 on 3 Dec 2021. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 6 months from the original filing. 237 of the 251 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLife Canvas Phase 1
  • TypeResidential / Group Housing
  • Location
    • Mamurdi
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032021
  • ReraGenie IDRG-MH-21956

Builder

  • NameVighnaharta Reality
  • Entity typePartnership
  • PartnersDinesh Ramchandra Raut, Vijendra Nandkumar Raut, Ganesh Vidyadhar Gawade, Akshay Vidyadhar Gawade, Tushar Sandeep Raut
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredDec 2021First promiseJun 2025Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Dec 2021
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 30 Jun 2025)
  • Buildings2 building records
  • Documents filed190 files

Current status

94%237 of 251 units booked
81.6%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building CNA19161250125
Building DNA18161260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Building C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Building C11
Building D11

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,667 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Nalini B VishanpayanMamurdiPune
Vinay Gopal JogalekarVitthalvadiPune
Varsha Hemant BhatPune (M Corp.)Pune
Prachi Ravindra PadePune (M Corp.)Pune
Atharv Vinay JogalekarPune (M Corp.)Pune
Ishan Vinay JogalekarPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI20188.92
Proposed, not sanctioned20,189 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivajinagar Pune Maharashtra
Estimated costRs 60.00 cr
Cost incurredRs 48.95 cr
Work done81.59%
BuildingWingEstimatedIncurred
Building CNARs 27.50 crRs 24.13 cr
Building DNARs 27.50 crRs 23.18 cr
-NARs 5.00 crRs 1.64 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectI P Associates
EngineerAkshay Gawade & Co
Chartered AccountantNamrata Kalpesh Dhruve
Chartered AccountantNatwar Damodar Marda
PartnerRole in project
Vighnaharta Reality-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31052501377Jun 2025 → Dec 2025

Reason as filed by the promoterWe Vighnaharta Reality, hereby declare the following with respect to the project “Life Canvas Phase 1” bearing registration number P52100032021 registered under MahaRERA. We hereby submit this explanatory note to formally request a six-month extension for our project Life Canvas Phase-1, registered under RERA No. P52100032021, in accordance with the provisions of Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. In support of this request, we have obtained consents from 52.34% of the allottees. The Life Canvas project is planned in two distinct phases, each registered und

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601264Mangesh SurkarVighnaharta Reality08/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed190

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 190 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: DEC-25-Form 1 phase 1.pdf7 May 2026
Withdrawal Update Form 2File: DEC-25 FORM-2 phase 1.pdf7 May 2026
Withdrawal Update Form 3File: DEC-25 form 3 phase 1.pdf7 May 2026
Withdrawal Update Form 1File: DEC-25-Form 1 phase 1.pdf12 Mar 2026
Withdrawal Update Form 2File: DEC-25 FORM-2 phase 1.pdf12 Mar 2026
Withdrawal Update Form 3File: DEC-25 form 3 phase 1.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM-1-PH-1-SEP-25.pdf19 Nov 2025
Withdrawal Update Form 2File: FORM-2-PH-1-SEP-25.pdf19 Nov 2025
Withdrawal Update Form 3File: FORM-3-PH-1-SEP-25.pdf19 Nov 2025
Form 1File: 8) Form 1_Sep 2023.pdf30 May 2025
Form 2File: 8) Form 2_Sept 2023.pdf30 May 2025
Form 3File: 8) Form 3 _ Life Canvas_September 2023pdf.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 8) Life Canvas Inventory 30-09-23.pdf30 May 2025
Form 1File: 9) Form 1_Dec 2023.pdf30 May 2025
Form 2File: 9) Form 2_Dec 2023.pdf30 May 2025
Form 3File: 9) Form 3 _ Life Canvas_December 2023pdf.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 9) Life Canvas Inventory 31-12-23.pdf30 May 2025
Form 1File: 10) Form 1_Mar 2024.pdf30 May 2025
Form 2File: 10) Form 2_March 2024.pdf30 May 2025
Form 3File: 10) Form 3 _ Life Canvas_March 2024pdf.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 10) Life Canvas Inventory 31-03-24.pdf30 May 2025
Form 1File: 11) Form 1_June 2024.pdf30 May 2025
Form 2File: 11) Form 2_June 2024.pdf30 May 2025
Form 3File: 11) Form 3 _ Life Canvas_June 2024pdf.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 11) Life Canvas Inventory 30-06-24.pdf30 May 2025
Form 1File: 12) Form 1_Sep 2024.pdf30 May 2025
Form 2File: 12) Form 2_Sept 2024.pdf30 May 2025
Form 3File: 12) Form 3 _ Life Canvas_September 2024pdf.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 12) Life Canvas Inventory 30-09-24.pdf30 May 2025
Form 1File: 13) Form 1_Dec 2024.pdf30 May 2025
Form 2File: 13) Form 2_Dec 2024.pdf30 May 2025
Form 3File: 13) Form 3 _ Life Canvas_December 2024pdf.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 13) Life Canvas Inventory 31-12-24.pdf30 May 2025
Form 1File: 14) Form 1_Mar 2025.pdf30 May 2025
Form 2File: 14) Form 2_March 2025.pdf30 May 2025
Form 3File: 14) Form 3 _ Life Canvas_March 2025.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: 14) Life Canvas Inventory 31-03-25.pdf30 May 2025
Form 2A (FY 2021-2022)File: Form 2A_March 2022.pdf30 May 2025
Form 2A (FY 2022-2023)File: Form 2A_March 2023.pdf30 May 2025
Form 2A (FY 2023-2024)File: Form 2A_March 2024.pdf30 May 2025
Form 2A (FY 2024-2025)File: Form 2A_March 2025.pdf30 May 2025
Form 5 (FY 2021-2022)File: Form 5_March 2022.pdf30 May 2025
Form 5 (FY 2022-2023)File: Form 5_March 2023.pdf30 May 2025
Form 5 (FY 2023-2024)File: Form 5_March 2024.pdf30 May 2025
Form 1File: 1) Form 1_Dec 2021.pdf29 May 2025
Form 2File: 1) Form 2_Dec 2021.pdf29 May 2025
Form 3File: 1) Form 3_ Life Canvas_December 2021.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 1) Life Canvas Inventory 31-12-21.pdf29 May 2025
Form 1File: 2) Form 1_Mar 2022.pdf29 May 2025
Form 2File: 2) Form 2_March 2022.pdf29 May 2025
Form 3File: 2) Form 3 _ Life Canvas_March 2022 pdf.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 2) Life Canvas Inventory 31-03-22.pdf29 May 2025
Form 1File: 3) Form 1_June 2022.pdf29 May 2025
Form 2File: 3) Form 2_June 2022.pdf29 May 2025
Form 3File: 3) Form 3 _ Life Canvas_June 2022 pdf.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 3) Life Canvas Inventory 30-06-22.pdf29 May 2025
Form 1File: 4) Form 1_Sep 2022.pdf29 May 2025
Form 2File: 4) Form 2_Sept 2022.pdf29 May 2025
Form 3File: 4) Form 3 _ Life Canvas_September 2022 pdf.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 4) Life Canvas Inventory 30-09-22.pdf29 May 2025
Form 1File: 5) Form 1_Dec 2022.pdf29 May 2025
Form 2File: 5) Form 2_Dec 2022.pdf29 May 2025
Form 3File: 5) Form 3 _ Life Canvas_December 2022pdf.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 5) Life Canvas Inventory 31-12-22.pdf29 May 2025
Form 1File: 6) Form 1_Mar 2023.pdf29 May 2025
Form 2File: 6) Form 2_March 2023.pdf29 May 2025
Form 3File: 6) Form 3 _ Life Canvas_March 2023pdf.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 6) Life Canvas Inventory 31-03-23.pdf29 May 2025
Form 1File: 7) Form 1_June 2023.pdf29 May 2025
Form 2File: 7) Form 2_Jun 2023.pdf29 May 2025
Form 3File: 7) Form 3 _ Life Canvas_Jun 2023pdf.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: 7)Life Canvas Inventory 30-06-23.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 PH-1.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH-1 Form-3 - SEP-24_compressed.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH-1 Form-2 - SEP-24.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Booking Details PH-1.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 - Life Canvas Phase-1.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-PHA-1-MAR-24.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Phase I.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: Life Canvas Phase-1 Booking Details MAR-24.pdf3 Jul 2024

How this compares with Pune

94%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Life Canvas Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mamurdi13,700+ in Pune

2 kmLife Canvas Phase 1Completed 49Lapsed / revoked 25Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 134 registered projects within 2 km.

Builder: Vighnaharta Reality

Vighnaharta Reality has 2 registrations on MahaRERA, including Life Canvas Phase 1 and Life Canvas Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Life Canvas Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Life Canvas Phase 1 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Life Canvas Phase 1?

The registered promoter entity is Vighnaharta Reality, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Life Canvas Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Life Canvas Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Life Canvas Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Life Canvas Phase 1?

The professionals named in the filing: Architect: I P Associates; Engineer: Akshay Gawade & Co; Chartered Accountant: Namrata Kalpesh Dhruve; Chartered Accountant: Natwar Damodar Marda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Life Canvas Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Life Canvas Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Life Canvas Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.