Home / Browse projects / Pune, Maharashtra / Legacy Imperial Phase I

Completed No litigation declared Residential / Group Housing project

Legacy Imperial Phase I

By White Properties and Ventures

RG-MH-60668 · RERA P52100046570 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
21 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

Legacy Imperial Phase I is a Residential / Group Housing project by White Properties and Ventures in Pune, Maharashtra, registered with MahaRERA as P52100046570 on 13 Aug 2022. The registration is recorded completed; possession was promised by 30 Oct 2025. 165 of the 166 units on this registration are recorded sold or booked, and 21 of 22 construction stages are filed complete.

At a glance

Project

  • NameLegacy Imperial Phase I
  • TypeResidential / Group Housing
  • Location
    • Kiwale
    • Near Symbiosis College
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100046570
  • ReraGenie IDRG-MH-60668

Builder

  • NameWhite Properties and Ventures
  • Entity typePartnership
  • PartnersRoshan Kishanchand Ramnani, Kishor Ishwardas Panjabi, Sanjay Laxmandas Vaswani
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2022PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Aug 2022
  • Promised completion30 Oct 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed149 files

Current status

99%165 of 166 units booked
100.0%Work done, per cost certificate

Figures as on 3 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA15141660166
Ammenity BuildingNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Ammenity Building100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jan 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI15134.09
Proposed, not sanctioned15,134 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRahatani Pune
Estimated costRs 50.98 cr
Cost incurredRs 50.98 cr
Work done100.0%
BuildingWingEstimatedIncurred
A WingNARs 45.99 crRs 45.99 cr
-NARs 4.99 crRs 4.99 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDream Space Architect
EngineerBricklane
EngineerRohinee Engineers
EngineerRupesh Mahamuni
Chartered AccountantCA Pravin Pise and Associtates
Chartered AccountantCA Girish Achhra
Chartered AccountantG M Achhra and Associates
PartnerRole in project
White Properties and Ventures-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Imperial ph 1 Form 1.pdf3 Feb 2026
Withdrawal Update Form 1File: Imperial ph 1 Form 1.pdf3 Feb 2026
Withdrawal Update Form 2File: Imperial ph 1 Form 2.pdf3 Feb 2026
Withdrawal Update Form 2File: Imperial ph 1 Form 2.pdf3 Feb 2026
Withdrawal Update Form 3File: Imperial ph 1 Form 3.pdf3 Feb 2026
Withdrawal Update Form 3File: Imperial ph 1 Form 3.pdf3 Feb 2026
Form 2A (FY 2025-2026)File: Legacy Imperial ph 1 2A.pdf3 Feb 2026
Occupational CertificateFile: Completion Certificate-410-2025.pdf3 Feb 2026
Occupational CertificateFile: Oc Verification.pdf3 Feb 2026
Form 1File: Q2- Form 1- 01-10-2022.pdf27 Dec 2025
Form 2File: Q2- Form 2- 02-11-2022.pdf27 Dec 2025
Form 3File: Q2 - Form 3- 05-11-2022.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q2- Sold Unsold 2022-2023.pdf27 Dec 2025
Form 2A (FY 2023-2024)File: Form2-A 2024 Legacy Imperial-1.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: Form2-A 2025 Legacy Imperial-1.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Imperial P I - 24-25.pdf30 Sep 2025
Form 1File: Q1 Form 1 - Phase 1 2025-2026.pdf20 Jul 2025
Form 2File: Q1 Form 2 - Phase I 2025-2026.pdf20 Jul 2025
Form 3File: Q1 Form 3 - Phase-1 2025-2026.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q1 - 2025-2026 - Phase I - Sold Unsold (1).pdf20 Jul 2025
Form 1File: Dec 2022 Form 1.pdf24 Jun 2025
Form 2File: Dec 2022 Form 2.pdf24 Jun 2025
Form 3File: Dec 2022 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: March 2023 Form 1.pdf24 Jun 2025
Form 2File: March 2023 Form 2.pdf24 Jun 2025
Form 3File: March 2023 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: Jun 2023 Form 1.pdf24 Jun 2025
Form 2File: Jun 2023 Form 2.pdf24 Jun 2025
Form 3File: Jun 2023 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: Sep 2023 Form 1.pdf24 Jun 2025
Form 2File: Sep 2023 Form 2.pdf24 Jun 2025
Form 3File: Sep 2023 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: Dec 2023 Form 1.pdf24 Jun 2025
Form 2File: Dec 2023 Form 2.pdf24 Jun 2025
Form 3File: Dec 2023 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: March 2024 Form 1.pdf24 Jun 2025
Form 2File: March 2024 Form 2.pdf24 Jun 2025
Form 3File: March 2024 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: Jun 2024 Form 1.pdf24 Jun 2025
Form 2File: Jun 2024 Form 2.pdf24 Jun 2025
Form 3File: Jun 2024 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: Sep 2024 Form 1s.pdf24 Jun 2025
Form 2File: Sep 2024 Form 2.pdf24 Jun 2025
Form 3File: Sep 2024 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: Dec 2024 Form 1.pdf24 Jun 2025
Form 2File: Dec 2024 Form 2.pdf24 Jun 2025
Form 3File: Dec 2024 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jun 2025
Form 1File: March 2025 Form 1.pdf24 Jun 2025
Form 2File: March 2025 Form 2.pdf24 Jun 2025
Form 3File: March 2025 Form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2025 Sold Unsold.pdf24 Jun 2025
Form 2A (FY 2022-2023)File: 2A 2022-23.pdf24 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf24 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf24 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I FOR PHASE I pdf.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Legacy Imperial.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Legacy Imperial-1Engineers Certificate 16-04-2025.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Legacy Imperial-1 Building-A Sold-Unsold 31-03-2025 (1).pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate i.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II - PHASE I.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: PHASE I - SOLD UNSOLD_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Secp 2024 Legacy Imperial I.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Imperial Phase-1_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FROM 1 phase Legacy_page-0001.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LGACYIMPERIALPHASE-I FORM3_compressed.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: L Imperial 1 FORM 5.pdf28 Dec 2024
Other - LegalFile: Imperial Court Document 04-2023.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed F1 (1).pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed F1 P1.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed F2 P1.pdf23 Jul 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Twin ArcsP52100001145Punawale, Pune122Jul 2017CompletedOct 2018Jan 1970

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Legacy Imperial Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Symbiosis College13,700+ in Pune

Builder: White Properties and Ventures

White Properties and Ventures has 3 registrations on MahaRERA, including Twin Arcs and Legacy Imperial Phase I. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Legacy Imperial Phase I is delayed beyond 30 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Legacy Imperial Phase I?

The registered promoter entity is White Properties and Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Legacy Imperial Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Legacy Imperial Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Legacy Imperial Phase I?

The professionals named in the filing: Architect: Dream Space Architect; Engineer: Bricklane; Engineer: Rohinee Engineers; Engineer: Rupesh Mahamuni; Chartered Accountant: CA Pravin Pise and Associtates; Chartered Accountant: CA Girish Achhra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Legacy Imperial Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Legacy Imperial Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Legacy Imperial Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.