Home / Browse projects / Pune, Maharashtra / LANTANA COURT A BUILDING
LANTANA COURT A BUILDING
RG-MH-31266 · RERA P52100079600 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LANTANA COURT A BUILDING is a Residential / Group Housing project by Landmark Ventures in Pune, Maharashtra, registered with MahaRERA as P52100079600 on 17 Mar 2025. Possession is promised by 31 Jul 2027.
At a glance
Project
- NameLANTANA COURT A BUILDING
- TypeResidential / Group Housing
- Location
- Survey No 36 Hissa No 2
- Mohammadwadi
- Haveli
- Pune
- 411060
- Pincode411060
- RERA no.P52100079600
- ReraGenie IDRG-MH-31266
Builder
- NameLandmark Ventures
- Entity typePartnership
- GSTIN27AAEFL2224R1Z0
- PartnersAshok Govindrao Zamwar HUF, Rajesh Pandurang Mundada, Navin Rameshchandra Mundada, Ritish Satish Wagle
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Mar 2025
- Promised completion31 Jul 2027
- Revised completionNone
- Buildings2 building records
- Documents filed60 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A1 | NA | 13 | 0 | 0 | 0 | 0 |
| Building A2 | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.
Building A119%
| Activity | Progress |
|---|---|
| Excavation | 70% |
| Basement (if any) | 60% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 14% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building A219%
| Activity | Progress |
|---|---|
| Excavation | 70% |
| Basement (if any) | 60% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 14% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed76
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building A1 | 16 | 58 | 74 |
| Building A2 | 1 | 1 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mrs Shama Ramdas Kamathe | Fursungi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prabhakar R Kamathe |
| Engineer | Rajesh P Mundada |
| Chartered Accountant | Rupesh Lakhotiya |
| Partner | Role in project |
|---|---|
| Landmark Ventures | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2027
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate Q4 31st Mar 2026.pdf | 29 Apr 2026 |
| Form 2File: Engineer Certificate Q4 31st Mar 2026.pdf | 29 Apr 2026 |
| Form 3File: Q4 2025-26 FORM 3 CA Certificate.pdf | 29 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory Q4 31st Mar 2026.pdf | 29 Apr 2026 |
| Form 1File: Form 1 Architect Certificate Q3.pdf | 19 Jan 2026 |
| Form 2File: Form 2 Engineer Certificate Q3.pdf | 19 Jan 2026 |
| Form 3File: Form 3 CA Certificate Q3 Landmark Ventures.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Decleration of Sold Unsold Inventory Q3.pdf | 19 Jan 2026 |
| Form 1File: Form 1 Architect Certificate Q2.pdf | 14 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate Q2.pdf | 14 Oct 2025 |
| Form 3File: Form 3 CA Certificate Q2.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf | 14 Oct 2025 |
| Form 1File: Form 1 Architect Certificate Q1.pdf | 22 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate Q1.pdf | 22 Jul 2025 |
| Form 3File: Form 3 CA Certificate Q1.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold decleartion Q1.pdf | 22 Jul 2025 |
| Other - LegalFile: Architect Declaration landmark final.pdf | 7 Feb 2025 |
| Other - TechnicalFile: Architect Declaration landmark final.pdf | 7 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Declaration NEW.pdf | 22 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Affendex F Landmark Venture.pdf | 22 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification Landmark venture.pdf | 22 Jan 2025 |
| Other - TechnicalFile: 07 Annexure A Decl cum Undertaking.pdf | 22 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: 03-1 Legal Encuberance (1).pdf | 21 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbarance Certificate New.pdf | 21 Jan 2025 |
| Proforma of Allotment letterFile: RERA ALLOTMENT LETTER 21st JAN 2025 (1) edit.pdf | 21 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D final.pdf | 21 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter final.pdf | 21 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Encumbarance Certificate New.pdf | 21 Jan 2025 |
| Details of encumbrances concerned to LegalFile: 03-1 Legal Encuberance (1).pdf | 21 Jan 2025 |
| Other - TechnicalFile: CC Verification Landmark venture.pdf | 21 Jan 2025 |
| Other - TechnicalFile: Affendex F Landmark Venture.pdf | 21 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: AFS - Deviation Report RERA final 20 02 2025.pdf | 21 Jan 2025 |
| Proforma of Agreement for saleFile: RERA AGREEMENT final landmark 20 02 2025_11zon.pdf | 21 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance Lantana court final.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final_compressed.pdf | 18 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A AGZ.pdf | 13 Jan 2025 |
| Layout approvalFile: Layout 01.pdf | 9 Jan 2025 |
| Layout approvalFile: Layout Approval Highlight Final new.pdf | 9 Jan 2025 |
| Building plan approvalFile: Plan 1.pdf | 9 Jan 2025 |
| Building plan approvalFile: Plan 2.pdf | 9 Jan 2025 |
| Building plan approvalFile: Plan 3_11zon.pdf | 9 Jan 2025 |
| Building plan approvalFile: Plan 4_11zon.pdf | 9 Jan 2025 |
| PAN CardFile: PAN Card.pdf | 9 Jan 2025 |
| Copy of the legal title reportFile: Legal Title Report Final_compressed.pdf | 9 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Layout 01.pdf | 9 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Approval Highlight Final new.pdf | 9 Jan 2025 |
| Declaration in FORM BFile: Form B Promoter.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Lantana Court.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Lantana Court.pdf | 9 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3_11zon.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4_11zon.pdf | 9 Jan 2025 |
| CERSAI detailsFile: Cersai Declaration draft final.pdf | 9 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Account Details.pdf | 9 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 06 Annexure A Disclosure Of Interest_Part1.pdf | 9 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 06 Annexure A Disclosure Of Interest_Part2.pdf | 9 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 06 Annexure A Disclosure Of Interest navin.pdf | 9 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B).p | 9 Jan 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LANTANA COURT A BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mohammadwadi13,700+ in Pune
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: Landmark Ventures
Landmark Ventures has 2 registrations on MahaRERA, including Lantana Court and LANTANA COURT A BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if LANTANA COURT A BUILDING is delayed beyond 31 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LANTANA COURT A BUILDING?
The registered promoter entity is Landmark Ventures, a partnership as per the filing. Its GSTIN 27AAEFL2224R1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LANTANA COURT A BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LANTANA COURT A BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LANTANA COURT A BUILDING?
The professionals named in the filing: Architect: Prabhakar R Kamathe; Engineer: Rajesh P Mundada; Chartered Accountant: Rupesh Lakhotiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LANTANA COURT A BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback