LAKESCAPE

By LAKE SCAPE

RG-MH-07130 · RERA P51700054734 · Last updated on MahaRERA portal: 17 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 70%
100 of 230Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

LAKESCAPE is a Others project by LAKE SCAPE in Thane, Maharashtra, registered with MahaRERA as P51700054734 on 6 Feb 2024. Possession is promised by 30 Dec 2028. 130 of the 230 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLAKESCAPE
  • TypeOthers
  • Location
    • Waghbil Road & G B Road
    • Kavesar Village
    • Thane
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • RERA no.P51700054734
  • ReraGenie IDRG-MH-07130

Builder

  • NameLAKE SCAPE
  • Entity typePartnership
  • PartnersSAMARTH JAYESH DOSHI, CHAITYA AJAY MEHTA, SAMYAK AKSHAY DOSHI, V R CONSTRUCTORS PRIVATE LIMITED V R CONSTRUCTORS PRIVATE LIMITED, SHAIL BHUSHAN MEHTA

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed87 files

Current status

57%130 of 230 units booked
21.1%Work done, per cost certificate

Figures as on 17 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA291020624230
BUILDING NO 2NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 70%.

BUILDING NO 143%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)100%
Plinth100%
Stilt Floor60%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 246%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor70%
Slabs of Super Structure31%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed872

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots872
Closed/Covered483
Open Space389
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1241194435
BUILDING NO 2242195437

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,115 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Nov 2025
LandownerVillageDistrict
V R Constructors Pvt LtdAndheriMumbai Suburban
M/s Shree Uma InfraprojectsThane (M Corp.)Thane
Anant Chandar PatilThane (M Corp.)Thane
Nirabhai Kisan MhatreThane (M Corp.)Thane
Hirabai Lahu ThakurThane (M Corp.)Thane
Ratanibai Narayan BhoirThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMaharashtra Real Estate Regulatory Authority
Permissible FSI39053.8
Proposed, not sanctioned20,702 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPb No 7532, 89 Jawahar Nagar, Goregaon West, mumbai - 400062
Estimated costRs 256.59 cr
Cost incurredRs 54.19 cr
Work done21.12%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 121.91 crRs 26.21 cr
BUILDING NO 2NARs 121.91 crRs 27.99 cr
-NARs 12.76 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSCAPES
EngineerRajbahadur Ramadhar Yadav
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
Chartered AccountantREGE & THAKKAR
Chartered AccountantAmit T Jain & Co.
Chartered AccountantSantosh B Morge & Co
PartnerRole in project
LAKE SCAPE-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503931Harshal Uttam ChavanLAKE SCAPE09/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_Lake Scape.pdf17 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Jul 2026
Withdrawal Update Form 3File: FORM 3 (5).pdf25 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf7 May 2026
Withdrawal Update Form 2File: FORM 2.pdf7 May 2026
Withdrawal Update Form 3File: FORM 3 NEW.pdf7 May 2026
Withdrawal Update Form 1File: form 1.pdf4 May 2026
Withdrawal Update Form 1File: form 1 new.pdf4 May 2026
Withdrawal Update Form 2File: form 3_compressed.pdf4 May 2026
Withdrawal Update Form 2File: form 2 new.pdf4 May 2026
Withdrawal Update Form 3File: form 3_compressed.pdf4 May 2026
Withdrawal Update Form 3File: form 3 new.pdf4 May 2026
Withdrawal Update Form 1File: FORM1.pdf31 Mar 2026
Withdrawal Update Form 2File: Associated Structural.pdf31 Mar 2026
Withdrawal Update Form 3File: Lake Scape FORM 3 NEW.pdf31 Mar 2026
Form 5 (FY 2023-2024)File: Form 5Lake Scape 23-24.pdf5 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Lake Scape 24-25.pdf5 Jan 2026
Scape Architect Certificate29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 march-25_compressed_compressed (1).pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Lake Scape dec-24-upload.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fomr -3 June-24-compressed.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep24-compressed.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fomr 3 March-24-compressed_compressed.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Nov 2024
Layout approvalFile: APPROVED LAKESCAPE_1-3.pdf8 Jul 2024
Layout approvalFile: APPROVED LAKESCAPE_4-end.pdf8 Jul 2024
Copy of Layout Approval (in case of layout)File: APPROVED LAKESCAPE_1-3.pdf8 Jul 2024
Copy of Layout Approval (in case of layout)File: APPROVED LAKESCAPE_4-end.pdf8 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 14981_signed 395.pdf5 Mar 2024
Declaration about Commencement CertificateFile: cc declaration.pdf30 Jan 2024
Copy of the legal title reportFile: title report.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lake Scapes Form 3 CA certificate_11zon.pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: AJD-1.pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: BCM-1.pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ACM -1.pdf6 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Formate A declaration for Seperate Bank AC.pdf6 Jan 2024
Proforma of Agreement for saleFile: AFS.pdf4 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation.pdf4 Jan 2024
Details of encumbrances concerned to FinanceFile: Financial Encubrance.pdf2 Jan 2024
Details of encumbrances concerned to LegalFile: Financial Encubrance.pdf2 Jan 2024
Declaration in FORM BFile: Lake Scpae FORM 'B'_11zon.pdf19 Dec 2023
Building plan approvalFile: scan0419_11zon.pdf13 Dec 2023
Building plan approvalFile: basement floor plan.pdf13 Dec 2023
Building plan approvalFile: first floor plan.pdf13 Dec 2023
Building plan approvalFile: scan0422_11zon.pdf13 Dec 2023
Building plan approvalFile: scan0423_11zon.pdf13 Dec 2023
Building plan approvalFile: scan0424_11zon.pdf13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0419_11zon.pdf13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: basement floor plan.pdf13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: first floor plan.pdf13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0422_11zon.pdf13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0423_11zon.pdf13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0424_11zon.pdf13 Dec 2023
CERSAI detailsFile: Cersai Declaration.pdf28 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A -chm.pdf28 Nov 2023
Layout approvalFile: layout plan.pdf25 Nov 2023
Copy of Layout Approval (in case of layout)File: layout plan.pdf25 Nov 2023
Proforma of Allotment letterFile: Allotment Letter.pdf25 Nov 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf25 Nov 2023
PAN CardFile: E-PAN.pdf20 Nov 2023

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAKESCAPE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kavesar Village, Thane7,600+ in Thane

Builder: LAKE SCAPE

LAKE SCAPE has 1 registration on MahaRERA, including LAKESCAPE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if LAKESCAPE is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAKESCAPE?

The registered promoter entity is LAKE SCAPE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAKESCAPE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAKESCAPE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAKESCAPE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAKESCAPE?

The professionals named in the filing: Architect: SCAPES; Engineer: Rajbahadur Ramadhar Yadav; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Chartered Accountant: REGE & THAKKAR; Chartered Accountant: Amit T Jain & Co.; Chartered Accountant: Santosh B Morge & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKESCAPE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKESCAPE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKESCAPE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.