ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / LABDHI GARDENS PHASE 2

Completed No litigation declared Residential / Group Housing project

LABDHI GARDENS PHASE 2

By Labdhi Lifestyle Limited

RG-MH-11902 · RERA P51900012567 · Last updated on MahaRERA portal: 29 Dec 2018

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
May 2019Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

LABDHI GARDENS PHASE 2 is a Residential / Group Housing project by Labdhi Lifestyle Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900012567 on 4 Sep 2017. The registration is recorded completed; possession was promised by 31 May 2019.

At a glance

Project

  • NameLABDHI GARDENS PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Labdhi Gardens
    • Dahivali tarf varedi
    • Neral -Karjat
    • Neral
    • Mumbai City
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012567
  • ReraGenie IDRG-MH-11902

Builder

  • NameLabdhi Lifestyle Limited
  • Entity typeCompany
  • ChairpersonMahendra M Jain
  • Managing DirectorAJAY SABOO
  • Other registrations10 more →
  • Completed6 of 11

Key dates

this monthRegisteredSep 2017PromisedMay 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Sep 2017
  • Promised completion31 May 2019
  • Revised completionNone
  • Buildings4 building records
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Petunia/ QrimsonNA50000
Rose/TulipNA50000
HyacinthNA50000
IvyNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 29 Dec 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

Petunia/ Qrimson100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Rose/Tulip100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Hyacinth100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Ivy100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 29 Dec 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Swimming PoolYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,467 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6283.94
Proposed, not sanctioned6,284 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchZAVERI BAZAR,MUMBAI-2

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPREMNATH & ASSOCIATES
PartnerRole in project
Labdhi Lifestyle Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: form 4 p and q.pdf29 Dec 2018
Certificates of Architect (Form 4)File: form 4 r and t.pdf29 Dec 2018
Certificates of Architect (Form 4)File: form 4-h.pdf29 Dec 2018
Certificates of Architect (Form 4)File: form 4 -i.pdf29 Dec 2018
Certificates of CA (Form 3)File: Phase -2 certificate.pdf7 Dec 2018
Certificates of CA (Form 5)File: Scan Copy - Form - 5 - Phase - 2.pdf7 Dec 2018
Certificates of CA (Form 3)File: Phase -2 certificate LG.pdf6 Oct 2018
Certificates of CA (Form 5)File: Scan Copy - Form - 5 - Phase - 2.pdf6 Oct 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: pq.pdf6 Sep 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: hyacinth.pdf6 Sep 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: ivy.pdf6 Sep 2018
OtherFile: 2nd occupancy certificate.pdf24 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: plinth cc rera.pdf24 Mar 2018
OtherFile: OC LG.pdf23 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: NA COPY.pdf22 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan Copy - RARE - Ph-2 compressed.pdf1 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg cert phase 2.pdf10 Jan 2018
Certificates of CA (Form 3)File: PHASE 2 CA CERTIFICATE.pdf19 Dec 2017
Certificates of Architect (Form 4)File: arct certificate001.pdf11 Dec 2017
Building plan approvalFile: REVISED NA ORDER.PDF31 Jul 2017
Layout approvalFile: GArdens Revised Layout.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: GArdens Revised Layout.pdf31 Jul 2017
Building Plan Approval (IOD)File: REVISED NA ORDER.PDF31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arct cert phase2.pdf31 Jul 2017
Proforma of Allotment letterFile: Declaration for rera agreement:allotment letter.pdf31 Jul 2017
OtherFile: declaration fir additional fsi.pdf31 Jul 2017
Declaration in FORM BFile: form b phase 2.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg cert phase 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: ca 2.pdf29 Jul 2017
OtherFile: declaration of phases.pdf28 Jul 2017
PAN CardFile: labdhi pan card.pdf27 Jul 2017
Copy of the legal title reportFile: Title and search reportvv (2).pdf27 Jul 2017
Details of encumbrancesFile: encumbrance cert.pdf27 Jul 2017
OtherFile: Phasewise Building Distribution.pdf27 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LABDHI GARDENS PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Neral780+ in Mumbai City

2 kmLABDHI GARDENS PHASE 2Completed 11Lapsed / revoked 11Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Labdhi Lifestyle Limited

Labdhi Lifestyle Limited has 11 registrations on MahaRERA, including LABDHI GARDENS PHASE 1 and LABDHI GARDENS PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if LABDHI GARDENS PHASE 2 is delayed beyond 31 May 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LABDHI GARDENS PHASE 2?

The registered promoter entity is Labdhi Lifestyle Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LABDHI GARDENS PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LABDHI GARDENS PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LABDHI GARDENS PHASE 2?

The professionals named in the filing: Architect: PREMNATH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LABDHI GARDENS PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LABDHI GARDENS PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LABDHI GARDENS PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.