Home / Browse projects / Pune, Maharashtra / LA ROYALE - A BUILDING
LA ROYALE - A BUILDING
RG-MH-20927 · RERA P52100012441 · Last updated on MahaRERA portal: 23 Nov 2024
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 46 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LA ROYALE - A BUILDING is a Residential / Group Housing project by DEVI SHAKTI REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100012441 on 1 Sep 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameLA ROYALE - A BUILDING
- TypeResidential / Group Housing
- Location
- UNDRI
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100012441
- ReraGenie IDRG-MH-20927
Builder
- NameDEVI SHAKTI REALTY LLP
- Entity typeOthers
- Named personsSANDALWOOD CONSTRUCTIONS LLP, DEVI LANDMARKS LLP, BUDHRANI LANDMARKS LLP, ORION CONSTRUCTIONS LLP
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on1 Sep 2017
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.
BUILDING A: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 23 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| LIFT | Yes | 0% |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rahul Wedpathak |
| Partner | Role in project |
|---|---|
| DEVI SHAKTI REALTY LLP | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| RCS431/2007/2007 | City Court | Suit for Declaration and Injunction |
| RCS5909/2012/2012 | City Court | Suit for Declaration and Injunction seeking right to way passing through out land |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000157275 | Mallikarjuna S Patil | Devi Shakti Realty LLP through its Partners | 28/06/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: From-3.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 11 Nov 2024 |
| Foreclosure of the ProjectFile: DeregistrationOrder- A Building.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Devishakti Rera-Annual Reports A Bldg.pdf | 24 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Q2.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: Form -3.pdf | 2 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - A Building_compressed.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1- 31-12-21 Q3.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1- 31-03-22 Q4.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 form 1- 30-06-22 Q1.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 form 1- 30-09-22 Q2.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 form 1- 31-12-22 Q3.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 form 1- 31-03-23 Q4.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 form 1- 30-06-23 Q1.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 form 1- 30-09-23 Q2.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 form 1- 31-12-23 Q3.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 form 1- 31-03-24 Q4.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory A bldg Q1.pdf | 10 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 7 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 A Bldg.pdf | 24 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 A Bldg.pdf | 24 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A A Bldg.pdf | 24 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory A bldg Q4.pdf | 6 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Devishakti Rera-Annual Reports A Bldg.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Form 2.pdf | 15 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Form 2.pdf | 15 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - A Building - FY 2019-20.pdf | 15 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - A Building - FY 2020-21.pdf | 15 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - A Building - FY 2021-22.pdf | 15 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - A Building - FY 2022-23.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 1 Form 3 - A Bldg - 31 Dec 2021.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 2 Form 3 - A Bldg - 31 Mar 2022.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 3 Form 3 - A Bldg - 30 June 2022.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 4 Form 3 - A Bldg - 30 Sept 2022.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 5 Form 3 - A Bldg - 31 Dec 2022.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 6 Form 3 - A Bldg - 31 March 2023.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 7 Form 3 - A Bldg - 30 June 2023.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 8 Form 3 - A Bldg - 30 Sept 2023.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: 9 Form 3 - A Bldg - 31Dec 2023.pdf | 15 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q3-21-22.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q4-21-22.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q1-22-23.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q2-22-23.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q3-22-23.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q4-22-23.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q1-23-24.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q2-23-24.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-Q3-23-24.pdf | 8 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: GetUserDocumentFileContent.pdf | 2 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: A BLDG.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold or unsold Inventory Q2-A.pdf | 25 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Devishakti Rera-Annual Reports A Bldg.pdf | 6 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q2- Devishakti Disclosure of sold or unsold Inventory A.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Devi Shakti - A_Final.pdf | 22 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: a 18-19.pdf | 13 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: a 19-20.pdf | 13 Jul 2021 |
| Certificates of CA (Form 5)File: Form 5 - Devi Shakti - A_Final.pdf | 24 Sep 2020 |
| Proforma of Allotment letterFile: ATS- Final - Building A.pdf | 25 Oct 2019 |
| Certificates of CA (Form 5)File: Signed Form-5.pdf | 21 Sep 2019 |
| Certificates of CA (Form 5)File: Scan - Form 5 - A.pdf | 29 Sep 2018 |
| Layout approvalFile: LAYOUT.pdf | 30 Jul 2017 |
| Building plan approvalFile: A Wing Building Plan (2).pdf | 30 Jul 2017 |
| Building plan approvalFile: A Wing Building Plan.pdf | 30 Jul 2017 |
| PAN CardFile: PAN CARD.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: TITLE AND SEARCH.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERTIFICATE BY ADV SEEMA GADEKAR 26-06-2017.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: Encumberance A Building.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: A Wing Building Plan (2).pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: A Wing Building Plan.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Form B A Building.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
Keep LA ROYALE - A BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UNDRI13,700+ in Pune
Filed coordinates, straight-line distance. 106 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: DEVI SHAKTI REALTY LLP
DEVI SHAKTI REALTY LLP has 3 registrations on MahaRERA, including LA ROYALE - A BUILDING and LA ROYALE - B BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that LA ROYALE - A BUILDING shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if LA ROYALE - A BUILDING is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LA ROYALE - A BUILDING?
The registered promoter entity is DEVI SHAKTI REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LA ROYALE - A BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LA ROYALE - A BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LA ROYALE - A BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LA ROYALE - A BUILDING?
The professionals named in the filing: Architect: Rahul Wedpathak. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LA ROYALE - A BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback