Kumar Sanctum - A2 And B2
RG-MH-23184 · RERA P52100045293 · Last updated on MahaRERA portal: 1 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kumar Sanctum - A2 And B2 is a Residential / Group Housing project by Kumar Govind J V in Pune, Maharashtra, registered with MahaRERA as P52100045293 on 12 May 2022. Possession is promised by 31 Dec 2026. 52 of the 66 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameKumar Sanctum - A2 And B2
- TypeResidential / Group Housing
- Location
- IVORY ESTATE ROAD
- BANER AUNDH ROAD
- Pashan
- Haveli
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045293
- ReraGenie IDRG-MH-23184
Builder
- NameKumar Govind J V
- Entity typeOthers
- PartnerGovindrao Eknath Nimhan
- Named personsKumar Construction and Properties Pvt Ltd, Smt. Sumitra Govind Nimhan, Smt Padma Govind Nimhan, Mrs Jayashree Dilip Gawade, Mrs Rajashree Rajendra Ghotkule, Mrs Usha Satyavan Vidhate, Mrs Ashwini Shirish Pawar, Mrs Seema Rajesh Kokane, Mrs Sonali Bhagyesh Jagtap, Mrs Dipali Shahaji Murkute, Mrs Rupali Suryakant Murkute, Mrs Sujata Sachin Kamathe and 1 more
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 May 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed99 files
Current status
Figures as on 1 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kumar Sanctum - B2 | NA | 19 | 17 | 34 | 0 | 34 |
| Kumar Sanctum - A2 | NA | 19 | 16 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Kumar Sanctum - B2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Kumar Sanctum - A2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed213
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Kumar Sanctum - B2 | 109 | 109 |
| Kumar Sanctum - A2 | 104 | 104 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kumar Sanctum - B2 | NA | Rs 45.53 cr | Rs 45.53 cr |
| Kumar Sanctum - A2 | NA | Rs 45.53 cr | Rs 45.53 cr |
| - | NA | Rs 6.06 cr | Rs 6.06 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR JAGDISH DESHPANDE |
| Engineer | Abhijeet Shekar |
| Chartered Accountant | SUPRIYA ABHIJIT MUNDADA |
| Chartered Accountant | Shivraj Patil |
| Partner | Role in project |
|---|---|
| Kumar Govind J V | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Sanctum - 5 Oct 2025.PDF | 1 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Sanctum - 7 Jan 2026.PDF | 1 Apr 2026 |
| Withdrawal Update Form 2File: Sanctum A2-B2 Engineers Certificate.pdf | 1 Apr 2026 |
| Withdrawal Update Form 2File: Sanctum A2 and B2 Engineers Certificate 2026 01 07.pdf | 1 Apr 2026 |
| Withdrawal Update Form 3File: Kumar Sanctum A2-B2.PDF | 1 Apr 2026 |
| Withdrawal Update Form 3File: KCPPL A-2 B-2 Form 3.pdf | 1 Apr 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - Sanctum - 2022-23.pdf | 8 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - Kumar Sanctum A2andB2 - 2023-24.pdf | 8 Jan 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kumar Sanctum A2B2.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SCAN_20250128_103641743.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kumar Sanctum A2 and B2_compressed.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sanctum A2andB2 Engineers Certificate.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Kumar Sanctum sold unsold incentory.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Kumar Sanctum -A2 and B2_compressed.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sanctum A2 and B2 Bldg.PDF | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Sanctum A2 and B2.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Kumar Sanctum A2.PDF | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Kumar Sanctum B2.PDF | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Sanctum A2 and B2.pdf | 30 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Sanctum A2 and B2.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold inventory - Kumar Sanctum A2.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold inventory - Kumar Sanctum B2.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Kumar Sanctum A2 and B2 - 2023-24.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanctum A2 and B2.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanctum A2 and B2.pdf | 22 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Sanctum - 2022-23.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Sanctum A2 and B2.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Sanctum A2.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Sanctum B2.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Sanctum A2 B2.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sanctum_A2 B2_Form 2.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Sanctum A2.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Sanctum B2.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Sanctum A2 B2.pdf | 18 Jan 2024 |
| Layout approvalFile: Layout 1-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: A2 BLDG FLOOR PLAN 3-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: A2 BLDG FLOOR PLAN 4-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: A2 BLDG TERRACE PLAN 5-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: A2 BLDG SECTION 6-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: B2 BLDG FLOOR PLAN 7-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: B2 BLDG FLOOR PLAN 8-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: B2 BLDG TERRACE PLAN 9-10.pdf | 11 Dec 2023 |
| Building plan approvalFile: B2 BLDG SECTION 10-10.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Layout 1-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: A2 BLDG FLOOR PLAN 3-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: A2 BLDG FLOOR PLAN 4-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: A2 BLDG TERRACE PLAN 5-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: A2 BLDG SECTION 6-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B2 BLDG FLOOR PLAN 7-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B2 BLDG FLOOR PLAN 8-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B2 BLDG TERRACE PLAN 9-10.pdf | 11 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B2 BLDG SECTION 10-10.pdf | 11 Dec 2023 |
| Declaration about Commencement CertificateFile: CC (2).pdf | 11 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A2 and B2 RERA LETTER.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanctum A2 B2.PDF | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sanctum_A2 B2_Form 2.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory -Sanctum B2.PDF | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Sanctum A2B2.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanctum A2 B2.PDF | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sanctum A2B2.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Kumar Sanctum A2.PDF | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Kumar Sanctum B2.PDF | 19 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Sanctum A2 - 2022-23.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Sanctum B2 - 2022-23.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 19 04 2023.pdf | 25 Apr 2023 |
| Declaration in FORM BFile: DECLARATION FOR LAND OWNER 09052022.pdf | 10 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE NEW FORMAT compressed.pdf | 10 May 2022 |
| PAN CardFile: KCPPL PAN Card.pdf | 26 Apr 2022 |
| Copy of the legal title reportFile: As Per Rera REPORT.pdf | 26 Apr 2022 |
| Proforma of Allotment letterFile: allotment letter sanctum a2 b2.pdf | 22 Apr 2022 |
| Proforma of Allotment letterFile: draft of agreement.pdf | 22 Apr 2022 |
| Layout approvalFile: HPSC0659.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0660.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0661.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0662.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0663.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0664.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0665.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0666.pdf | 11 Mar 2022 |
| Building plan approvalFile: HPSC0667.pdf | 11 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kumar Sanctum - A2 And B2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BANER AUNDH ROAD13,700+ in Pune
Filed coordinates, straight-line distance. 195 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Kumar Govind J V
Kumar Govind J V has 2 registrations on MahaRERA, including Kumar Sanctum - A1 and B1 and Kumar Sanctum - A2 And B2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kumar Sanctum - A2 And B2 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kumar Sanctum - A2 And B2?
The registered promoter entity is Kumar Govind J V, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kumar Sanctum - A2 And B2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kumar Sanctum - A2 And B2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kumar Sanctum - A2 And B2?
The professionals named in the filing: Architect: AR JAGDISH DESHPANDE; Engineer: Abhijeet Shekar; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA; Chartered Accountant: Shivraj Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kumar Sanctum - A2 And B2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback