Home / Browse projects / KUMAR PRAJWAL
KUMAR PRAJWAL
By KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED
RG-MH-60158 · RERA P52100017868 · Last updated on MahaRERA portal: 21 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 3 months past the filed date
- Completion date moved by 40 months
- 3 extensions taken
- Rs 50.00 crore secured on the land, in favour of Piramal Finance Limited
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KUMAR PRAJWAL is a Others project by KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED in SAINATH NAGAR, VADGAON SHERI, 411014, registered with MahaRERA as P52100017868 on 24 Sep 2018. Possession was promised by 3 Jul 2026 and is now 3 months past that date. The completion date has moved by 40 months from the original filing. 50 of the 52 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameKUMAR PRAJWAL
- TypeOthers
- Location
- RD NO 3
- OFF OLD MUNDHWA ROAD
- SAINATH NAGAR
- VADGAON SHERI
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100017868
- ReraGenie IDRG-MH-60158
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Sep 2018
- Promised completion3 Jul 2026
- Revised completionRevised to 3 Jul 2026 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed122 files
Current status
Figures as on 21 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRAJWAL | NA | 14 | 13 | 47 | 5 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 83%.
PRAJWAL: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 83% |
Progress on shared amenities15
As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed47
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PRAJWAL | NA | Rs 10.83 cr | Rs 13.33 cr |
| - | NA | Rs 2.51 cr | Rs 2.54 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vishal J Deshpande |
| Engineer | Mahesh Rasal |
| Engineer | Harshad Pendse |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRestart of project post covid delayed
Reason as filed by the promoter1. Project is 65% Completed 2. Consent of 63.27 % of Allotees uploaded for Extension 3. The Revised Form B is uploaded in Other tab No. 1 and also in the main Application 4. PERT Chart for the remaining completion work is uploaded in Other Tab No. 2 and also in Other Technical Tab of the Main Application 5. Explanatory Note for Delay in project Completion Uploaded in Other Tab No. 3 6. QPR till dates are updated 7. Due to unavoidable circumstances project has been delay and it will be completed by 31/12/2025
Reason as filed by the promoterAs we have received OC on 27/01/2026, so we have applied for Extension till the date of OC.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Sep 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 1_Ar Certificate_signed.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 21 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_signed.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 18 Apr 2026 |
| Form 2A (FY 2018-2019)File: 1_Form 2A_Mar 2019.pdf | 3 Apr 2026 |
| Form 2A (FY 2024-2025)File: 7_Form 2A_Mar 2025.pdf | 3 Apr 2026 |
| Form 2A (FY 2023-2024)File: 6_Form 2A_Mar 2024.pdf | 3 Apr 2026 |
| Form 2A (FY 2022-2023)File: 5_Form 2A_Mar 2023.pdf | 3 Apr 2026 |
| Form 2A (FY 2021-2022)File: 4_Form 2A_Mar 2022.pdf | 3 Apr 2026 |
| Form 2A (FY 2019-2020)File: 2_Form 2A_Mar 2020.pdf | 3 Apr 2026 |
| Form 2A (FY 2020-2021)File: 3_Form 2A_Mar 2021.pdf | 3 Apr 2026 |
| Form 5 (FY 2018-2019)File: 260323_Form 5_18-19.pdf | 7 Mar 2026 |
| Form 5 (FY 2019-2020)File: 260323_Form 5_19-20.pdf | 7 Mar 2026 |
| Form 5 (FY 2020-2021)File: 260323_Form 5_20-21.pdf | 7 Mar 2026 |
| Form 5 (FY 2021-2022)File: 220930_Form 5_Annual Audit Report.pdf | 28 Jan 2026 |
| Form 5 (FY 2022-2023)File: 230828_Form 5_Annual Audit Report.pdf | 28 Jan 2026 |
| Form 5 (FY 2023-2024)File: 240930_Form 5_Annual Audit Report.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Prajwal_Signed.pdf | 25 Aug 2025 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 11 Apr 2025 |
| Declaration in FORM BFile: Kumar Prajwal Form B.PDF | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.PDF | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Kumar Prajwal Form 2A 2020-21.PDF | 27 Mar 2025 |
| Other - TechnicalFile: Kumar Prajwal PERT Chart.pdf | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Kumar Prajwal Form 2A 2021-22.PDF | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Kumar Prajwal Form 2A 2022-23.PDF | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kumar Prajwal Form 2A 2023-24.PDF | 27 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 16_Kumar Prajwal.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 20_Kumar Prajwal.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2024 |
| Proforma of Agreement for saleFile: 240606_AFS_R5.pdf | 12 Jun 2024 |
| Declaration about Commencement CertificateFile: 240601_Decleration About CC.pdf | 1 Jun 2024 |
| Layout approvalFile: 240531_Layout.pdf | 31 May 2024 |
| Building plan approvalFile: 240531_Bldg Plan.pdf | 31 May 2024 |
| Copy of Layout Approval (in case of layout)File: 240531_Layout.pdf | 31 May 2024 |
| Building Plan Approval (IOD)File: 240531_Bldg Plan.pdf | 31 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 240531_CC.pdf | 31 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 16_Kumar Prajwal.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 15 Jan 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 16_Kumar Prajwal.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 20_Kumar Prajwal.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: 16_Kumar Prajwal.pdf | 19 Jul 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 5_Kumar Prajwal.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 21 Jan 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Primavera - B6 and S1 | Wadagaonsheri | 76 | Completed | Jan 2024 | Apr 2023 |
| KUMAR PRIMAVERA | Sr No 55 Plot No 69 Wadgaonsheri Pune | 545 | Completed | Jun 2017 | Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KUMAR PRAJWAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAINATH NAGAR, VADGAON SHERI
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED
KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including KUMAR PRAJWAL and Primavera - B6 and S1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that KUMAR PRAJWAL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KUMAR PRAJWAL is delayed beyond 3 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KUMAR PRAJWAL?
The registered promoter entity is KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45201PN1994PTC077841 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KUMAR PRAJWAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KUMAR PRAJWAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KUMAR PRAJWAL?
The professionals named in the filing: Architect: Vishal J Deshpande; Engineer: Mahesh Rasal; Engineer: Harshad Pendse; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUMAR PRAJWAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback