Home / Browse projects / KUMAR PALAASH A2

Registered No litigation declared Residential / Group Housing project

KUMAR PALAASH A2

By KUMAR & POTNIS ASSOCIATES

RG-MH-35814 · RERA P52100053742 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: .
Oct 2028Possession promisedno revision filed
11 of 11Construction stages doneevery applicable stage filed complete
0 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

KUMAR PALAASH A2 is a Residential / Group Housing project by KUMAR & POTNIS ASSOCIATES in SOMNATH NAGAR, 411014, registered with MahaRERA as P52100053742 on 28 Nov 2023. Possession is promised by 31 Oct 2028. 35 of the 35 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameKUMAR PALAASH A2
  • TypeResidential / Group Housing
  • Location
    • NAGAR ROAD
    • SOMNATH NAGAR
    • 411014
  • Pincode411014
  • RERA no.P52100053742
  • ReraGenie IDRG-MH-35814

Builder

  • NameKUMAR & POTNIS ASSOCIATES
  • Entity typePartnership
  • PartnerSHRIKRISHNA VITTHALRAO VINCHURKAR
  • Other registrations6 more →
  • Completed4 of 7
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2023
  • Promised completion31 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

100%35 of 35 units booked
93.1%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2NA8835035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

A2: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area550 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2903.35
Proposed, not sanctioned2,903 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW ADDRESS- M 4, Virwani Plaza Complex, Opp Dass Electronics, East Street, Next to Bombay Garage, Pune 411001
Estimated costRs 7.72 cr
Cost incurredRs 7.19 cr
Work done93.11%
BuildingWingEstimatedIncurred
A2NARs 7.72 crRs 7.19 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Jagdish P Deshpande
EngineerMr Abhijeet Shekar
EngineerMR KIRAN ERANDE
Chartered AccountantMrs Supriya Abhijit Mundada
Chartered AccountantSUPRIYA ABHIJIT MUNDADA
Chartered AccountantSPAK & CO.
PartnerRole in project
KUMAR & POTNIS ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Palaash A2 Form 1.pdf27 May 2026
Withdrawal Update Form 2File: Palaash A2 EngineerIing Certificate.pdf27 May 2026
Withdrawal Update Form 3File: KPA Kumar Palaash A2 Form-3 Mar-26.pdf27 May 2026
Withdrawal Update Form 1File: Palaash A2 Architect Certificate.PDF2 Feb 2026
Withdrawal Update Form 2File: Palaash A2 Engineers Certificate.pdf2 Feb 2026
Withdrawal Update Form 3File: Palaash A2 CA Certificate.pdf2 Feb 2026
Withdrawal Update Form 1File: Palaash A2.PDF24 Nov 2025
Withdrawal Update Form 2File: Palaash A2 Engineeru0027s Certificate.pdf24 Nov 2025
Withdrawal Update Form 3File: Palaash A2 CA Certificate.PDF24 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 - Kumar Palaash A2 - 2023-24.pdf17 Nov 2025
Form 5 (FY 2024-2025)File: spak.PDF17 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Palaash A2 CA Certificate_compressed.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PALAASH A2_ARCHITECT CERTIFICATE.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palaash A2 Engineer's Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: KUMAR PALAASH A2.PDF19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 K Palaash A2.PDF17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Palaash A2 Oct to Dec 2024.PDF17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palaash A2 Engineers Certificate.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: KUMAR PALAASH A2.PDF17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Palaash A2_compressed.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Palaash A2_compressed.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Palaash A2 Bldg.PDF20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Palaash A2.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Kumar Palaash A2.PDF20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palaash A2 Architect Certificate.PDF20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Palaash A2.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Palaash A2.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Kumar Palaash A2 - 2023-24.pdf7 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Kumar Palaash A2 - 2023-24.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Palaash A2.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Palaash A 2.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sold Unsold - Palaash A2.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Palaash A 2.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Palaash A2.pdf8 Apr 2024
Details of encumbrances concerned to FinanceFile: Palaash A2 - Emcumbrance - Financial.pdf29 Mar 2024
Details of encumbrances concerned to LegalFile: Palaash A2 - Emcumbrance - Financial.pdf29 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold - Palaash A2.PDF20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Palaash A2.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palaash A2_Engineer's Certificate.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Palaash A2.pdf18 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - RVJ - K Palaash A2.PDF20 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - SV - K Palaash A2.PDF20 Nov 2023
Other - LegalFile: PARTNERSHIP DEED KPA.PDF20 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Declaration for Verification of Commencement Certificate.PDF7 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation - revised - Agreement for Sale.pdf7 Nov 2023
Proforma of Allotment letterFile: Allotment letter -revised - Palaash A2.pdf26 Oct 2023
Proforma of Agreement for saleFile: Unit Agreement Final - Palaash A2.pdf26 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.PDF26 Oct 2023
Other - LegalFile: Sale Deed - Dilip Jain and KPA.pdf25 Oct 2023
Other - LegalFile: Sale Deed - Nirmal Jain and KPA 1.pdf25 Oct 2023
Other - LegalFile: Sale Deed - Nirmal Jain and KPA 2.pdf25 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account - Palaash A2.PDF17 Oct 2023
Layout approvalFile: Parking Plan 1-6 Compressed.pdf16 Oct 2023
Copy of Layout Approval (in case of layout)File: Parking Plan 1-6 Compressed.pdf16 Oct 2023
Declaration in FORM BFile: Form B - Affidavit cum Declaration.PDF16 Oct 2023
Other - TechnicalFile: Declaration abount Plinth Area.PDF16 Oct 2023
Copy of the legal title reportFile: Legal Title Report - Kumar Palaash A2 (2).pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Palaash A2.PDF13 Oct 2023
Building plan approvalFile: Basement Plan 2-6.pdf11 Oct 2023
Building plan approvalFile: Wing A2 Floor Plan 5-6.pdf11 Oct 2023
Building plan approvalFile: Wing A2 Elev Plan 6.pdf11 Oct 2023
PAN CardFile: PAN.pdf11 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance legal.PDF11 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance - Finance.PDF11 Oct 2023
Details of encumbrances concerned to LegalFile: No Encumbrance legal.PDF11 Oct 2023
Details of encumbrances concerned to LegalFile: No Encumbrance - Finance.PDF11 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Basement Plan 2-6.pdf11 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Wing A2 Floor Plan 5-6.pdf11 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Wing A2 Elev Plan 6.pdf11 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Oct 2023
Declaration about Commencement CertificateFile: Form D - Declaration of Commencement Certificate.PDF11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Palaash A2.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palaash A2_Engineer's Certificate.pdf11 Oct 2023
CERSAI detailsFile: Cersai Declaration.PDF11 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
KUMAR PURABHADAPSAR86CompletedMar 2017Mar 2017

Keep KUMAR PALAASH A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOMNATH NAGAR

Builder: KUMAR & POTNIS ASSOCIATES

KUMAR & POTNIS ASSOCIATES has 7 registrations on MahaRERA, including KUMAR PALAASH A and KUMAR PURVA COMMERCIAL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if KUMAR PALAASH A2 is delayed beyond 31 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUMAR PALAASH A2?

The registered promoter entity is KUMAR & POTNIS ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUMAR PALAASH A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUMAR PALAASH A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUMAR PALAASH A2?

The professionals named in the filing: Architect: Mr Jagdish P Deshpande; Engineer: Mr Abhijeet Shekar; Engineer: MR KIRAN ERANDE; Chartered Accountant: Mrs Supriya Abhijit Mundada; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA; Chartered Accountant: SPAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUMAR PALAASH A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUMAR PALAASH A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUMAR PALAASH A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.