ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / KRISHVI RESIDENCY

Registered No litigation declared Residential / Group Housing project

KRISHVI RESIDENCY

By SHAGUN CHEMBUR (AOP)

RG-MH-25107 · RERA P51800003291 · Last updated on MahaRERA portal: 13 May 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 96 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 92%
7 of 31Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

KRISHVI RESIDENCY is a Residential / Group Housing project by SHAGUN CHEMBUR (AOP) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003291 on 5 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 24 of the 31 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKRISHVI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • V N Purav Marg
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003291
  • ReraGenie IDRG-MH-25107

Builder

  • NameSHAGUN CHEMBUR (AOP)
  • Entity typeOthers
  • Named personsShrenik Seth, Shiva Suresh Seth, Lalit Shah, Gambhirmal R Shah

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed74 files

Current status

77%24 of 31 units booked

Figures as on 13 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHVI RESIDENCYNA181031031

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 92%.

KRISHVI RESIDENCY: 94% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 13 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed119

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots119
Closed/Covered119

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,409 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on7 Apr 2026
LandownerVillageDistrict
Triton Multimedia Pvt LtdABCD-400001Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6644.96
Proposed, not sanctioned3,875 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAMINGTON ROAD MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVaastuviit Architects & Consultant
EngineerDEOLE BROS
Chartered AccountantNIKHITA M SHAH & CO
PartnerRole in project
SHAGUN CHEMBUR (AOP)-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800006037Dec 2019 → Dec 2020

Reason as filed by the promoterThe Project has been delayed due to a financial crunch and lack of demand as a result of which funding has been little delayed. However, the Project is near completion despite this with working near the end.

EXT51800011159Dec 2019 → Dec 2022

Reason as filed by the promoterDue to various reasons beyond the control of Promoter and on account of pandemic of Covid-19, the project is delayed. Kindly grant extension till 31/12/2022. Required consents of Allottees are annexed.

EXT51800024830Dec 2019 → Dec 2027

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of % allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000209495dr lata Cheluveri & dr Rajendra CheluveriShagun Chembur21/12/2021
CC006000000303401Naresh Ghansham JumaniShagun Chembur (AOP)29/11/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Dec 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: sold inventory 31-03-25.pdf13 May 2025
Declaration in FORM BFile: form b stamp paper - converted.pdf21 Mar 2025
Certificates of CA (Form 3)File: form 3 - converted.pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: inventary 31-3-23.pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: inventary 31-3-23.pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: sold inventary 31-3-24.pdf21 Mar 2025
Declaration in FORM BFile: form b stamp paper 500.pdf10 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect's Certificate R2 (1).pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Krishiv Residency Dec Form 2 (2)_1 (3 files merged).pdf10 Mar 2025
Certificates of CA (Form 3)File: form 3 31-12-24 final - converted.pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-09-24 (2).pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: sold booked inventory.pdf23 Jan 2025
Declaration in FORM BFile: Form B.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Architect Certificate).pdf2 Dec 2024
Certificates of CA (Form 3)File: FORM 3 FINAL.pdf2 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Chembur OC Certificate (1).pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Flat List.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: from 5 21-22.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 23-24.pdf2 Dec 2024
Declaration in FORM BFile: Affidavit cum Declaration.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 2019-20.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 2020-21.pdf16 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2021-22.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-24.pdf16 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Krishvi Residency as on 31-03-2024.pdf2 Jul 2024
Certificates of CA (Form 3)File: Form 3 - Krishvi Residency as on 31-03-2024.pdf2 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Krishvi Residency as on Sep 2023.pdf8 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Krishvi Residency as on 30th September 2023.pdf8 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Chembur OC Certificate.pdf7 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Revalidated Cc - Krishvi.pdf30 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC revaildation.pdf29 Dec 2021
Declaration about Commencement CertificateFile: Scan29122021161543.pdf29 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2020 (1)_rotated.pdf24 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019 (1)_rotated.pdf24 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021 (1)_rotated.pdf24 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sept 2021 (1)_rotated.pdf24 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Dec 2021
Declaration about Commencement CertificateFile: Circular 32_rotated.pdf22 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_rotated.pdf22 Dec 2021
Disclosure of sold/ booked inventoryFile: Circular 29_rotated.pdf22 Dec 2021
CERSAI detailsFile: Krishvi Residency.pdf22 Dec 2021
Certificates of CA (Form 5)File: Form 5 FY 17-18.pdf22 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19.pdf22 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20.pdf22 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.pdf22 Dec 2021
Certificates of CA (Form 3)File: Form_3 - Chembur 2020_compressed.pdf26 Sep 2020
Certificates of CA (Form 3)File: Form_3 - Chembur 2020_compressed.pdf26 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Chembur-ilovepdf-compressed.pdf8 Aug 2018
Certificates of CA (Form 3)File: Form 3- Shagun Chembur-ilovepdf-compressed (1).pdf22 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Site Supervisor Certificate Chembur-compressed.pdf17 Jan 2018
Certificates of CA (Form 5)File: Shagun Chembur - CA Certificate-compressed.pdf6 Jan 2018
Copy of the legal title reportFile: Title Certificate.pdf29 Jul 2017
Declaration in FORM BFile: Form B Chembur.pdf29 Jul 2017
Layout approvalFile: NO LAY OUT CHEMBUR.pdf28 Jul 2017
Building plan approvalFile: Amended Plan.pdf28 Jul 2017
Building plan approvalFile: IOD.pdf28 Jul 2017
Building plan approvalFile: Amended Letter.pdf28 Jul 2017
Details of encumbrancesFile: NO ENCUMBRANCES CHEMBUR.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: NO LAY OUT CHEMBUR.pdf28 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf28 Jul 2017
Building Plan Approval (IOD)File: Amended Letter.pdf28 Jul 2017
Building Plan Approval (IOD)File: Amended Plan.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC till 11th floor.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: chembur engineer certificate.pdf28 Jul 2017
Certificates of CA (Form 3)File: chembur.pdf28 Jul 2017
Proforma of Allotment letterFile: Chembur.pdf28 Jul 2017
Proforma of Allotment letterFile: Allotment letter.pdf28 Jul 2017
PAN CardFile: SHAGUN CHEMBUR PAN CARD.pdf27 Jul 2017

How this compares with Mumbai Suburban

77%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 96 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHVI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmKRISHVI RESIDENCYCompleted 139Lapsed / revoked 111Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: SHAGUN CHEMBUR (AOP)

SHAGUN CHEMBUR (AOP) has 1 registration on MahaRERA, including KRISHVI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KRISHVI RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHVI RESIDENCY?

The registered promoter entity is SHAGUN CHEMBUR (AOP), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHVI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KRISHVI RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KRISHVI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHVI RESIDENCY?

The professionals named in the filing: Architect: Vaastuviit Architects & Consultant; Engineer: DEOLE BROS; Chartered Accountant: NIKHITA M SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHVI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHVI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHVI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.