Red flags
- Possession 1 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kranti Heights is a Residential / Group Housing project by SIDHIVINAYAK CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076833 on 28 Jun 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 4 of the 21 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameKranti Heights
- TypeResidential / Group Housing
- Location
- V N Purav Marg
- Chembur Naka
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800076833
- ReraGenie IDRG-MH-18090
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Jun 2024
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed60 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kranti Heights | NA | 14 | 13 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 70%.
Kranti Heights: 66% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Chembur Kranti Co-Operative Housing Society Ltd | Chembur | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kranti Heights | NA | Rs 6.09 cr | Rs 4.57 cr |
| - | NA | Rs 2.00 cr | Rs 50.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARIKH KULKARNI |
| Architect | Ms Atelier Pachupate Partner |
| Engineer | PARIKH KULKARNI |
| Engineer | Atmaram P Pachupate |
| Chartered Accountant | Shashank R Jain and Associates |
| Chartered Accountant | Paras Thakkar and Associates |
| Partner | Role in project |
|---|---|
| SIDHIVINAYAK CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Quality Assurance Certificate of Kranti.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 Kranti Heights 310326.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 Kranti Heights 310326.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form-3 Kranti Heights 310326_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Kranti 31122025.pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: Form-2-Kranti signed.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: Form-3-Kranti 31122025 signed Compressed.pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: Kranti Heights.PDF | 19 Oct 2025 |
| Withdrawal Update Form 2File: Form-2 Kranti Project.PDF | 19 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 -30092025.pdf | 19 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5- Signed 1.PDF | 27 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A of Kranti Heights 2024-25.pdf.pdf | 20 Aug 2025 |
| Form 1File: Form-1_Kranti.PDF | 1 Jul 2025 |
| Form 2File: Form-2_Kranti.PDF | 1 Jul 2025 |
| Form 3File: Form 3 Final 31032025.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold.PDF | 1 Jul 2025 |
| Withdrawal Update Form 1File: Form-1_Kranti.PDF | 1 Jul 2025 |
| Withdrawal Update Form 2File: Form-2_Kranti.PDF | 1 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Final 31032025.pdf | 1 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Kranti.PDF | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final 31032025.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Kranti.PDF | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 31122024.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024 Final.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-KRANTI.PDF | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate-Kranti.PDF | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Kranti 30092024 Final.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate-Kranti.PDF | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1- KRANTI APT.PDF | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- KRANTI APT.PDF | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Roop 30062024.pdf | 8 Aug 2024 |
| Proforma of Agreement for saleFile: Agreement For Sale Kranti Heights.pdf | 7 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report-Kranti.PDF | 7 Jun 2024 |
| Other - TechnicalFile: Revised Order 50.pdf | 7 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC with BMC.pdf | 29 May 2024 |
| Other - TechnicalFile: Draft of declaration regarding Form1.PDF | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kranti Heights - to be upload_compressed.pdf | 9 May 2024 |
| Copy of the legal title reportFile: Legal Title Report - To upload.pdf | 19 Apr 2024 |
| Declaration about Commencement CertificateFile: Format D- Declaration about CC-Other one.pdf | 19 Apr 2024 |
| CERSAI detailsFile: Cersai Report_merged.pdf | 19 Apr 2024 |
| Proforma of Allotment letterFile: Allotment Letter_compressed.pdf | 19 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf | 19 Apr 2024 |
| Other - TechnicalFile: Architects Carpet Area Statement Certification for MahaRERA Registration.pdf | 19 Apr 2024 |
| Layout approvalFile: Approved Plan.pdf | 4 Apr 2024 |
| Building plan approvalFile: Approved Plan.pdf | 4 Apr 2024 |
| PAN CardFile: SVC Pan Card.pdf | 4 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Encrumbance - Finance and legal merged.pdf | 4 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Encrumbance - Finance and legal merged.pdf | 4 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Approved Plan.pdf | 4 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan.pdf | 4 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: First CC_and revalidation merged.pdf | 4 Apr 2024 |
| Declaration in FORM BFile: Form B- Promoter_compressed.pdf | 4 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Kaushik.PDF | 4 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Kusum.PDF | 4 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Shravan.PDF | 4 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Sidharth.PDF | 4 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discolsure_Satyen.PDF | 4 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration od Bank Acc.pdf | 4 Apr 2024 |
| Other - LegalFile: Order 50.pdf | 4 Apr 2024 |
| Other - LegalFile: Partnership Deed_17022016.pdf | 4 Apr 2024 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shivpuri Building No 10 CHS Ltd - Shivam Heights | Kurla Mumbai 400071 | 25 | Completed | Dec 2020 | Dec 2020 |
| Opulence | Deonar Mumbai - 400088 | 68 | Completed | Dec 2020 | Late, Sep 2021 |
| Apurva CHS | Kurla Mumbai 400071 | 72 | Completed | Dec 2020 | Late, Jul 2021 |
| SIDHIVINAYAK RESIDENCY | Plot No 8 and Shivpuri Chembur Mumbai 400071 | 23 | Completed | Mar 2016 | Late, Jul 2016 |
| ARUNDHATI HEIGHTS | ARUNDHATI CHS LTD Plot No 35 Swastik Park Chembur Mumbai 400 071 | 23 | Completed | Jan 2015 | Late, Sep 2015 |
| PURBANI CHS LTD | PLOT NO 38 SION TROMBAY ROAD CHEMBUR MUMBAI 400071 | 14 | Completed | Jul 2013 | Late, Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kranti Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chembur Naka6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 255 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: SIDHIVINAYAK CONSTRUCTIONS
SIDHIVINAYAK CONSTRUCTIONS has 6 registrations on MahaRERA, including APURVA and OPULENCE. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Kranti Heights is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kranti Heights?
The registered promoter entity is SIDHIVINAYAK CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kranti Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kranti Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kranti Heights?
The professionals named in the filing: Architect: PARIKH KULKARNI; Architect: Ms Atelier Pachupate Partner; Engineer: PARIKH KULKARNI; Engineer: Atmaram P Pachupate; Chartered Accountant: Shashank R Jain and Associates; Chartered Accountant: Paras Thakkar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kranti Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback