ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / KONARK ALPHA

Completed No litigation declared Commercial project

KONARK ALPHA

By Treon Developers LLP

RG-MH-14641 · RERA P52100023108 · Last updated on MahaRERA portal: 27 Jul 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

KONARK ALPHA is a Commercial project by Treon Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100023108 on 2 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameKONARK ALPHA
  • TypeCommercial
  • Location
    • NAGAR ROAD
    • KHARADI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023108
  • ReraGenie IDRG-MH-14641

Builder

  • NameTreon Developers LLP
  • Entity typePartnership
  • PartnerSAMIT NITIN KARIA
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Dec 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KONARK ALPHANA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KONARK ALPHA: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed161

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots161
Closed/Covered151
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,625 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13501.0
Proposed, not sanctioned10,575 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK, UPPER GROUND FLOOR, SHOP NO 10, VICTORIA - i, FORTALEZA, NEAR LUNKAD SKY LOUNGE, KALYANI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL SAYKAR
EngineerMr Ashish Dhuru
Chartered AccountantR S BIRADAR & CO
Chartered AccountantSUNIL JAKHITE & CO
PartnerRole in project
Treon Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jul 2022

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Index II ABFL.pdf27 Jul 2022
Disclosure of sold/ booked inventoryFile: Alpha Inventory July 22.pdf27 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Konarl Alpha Final Completion Certificate.PDF27 Jul 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form IV Alpha RERA.pdf27 Jul 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form IV Alpha Rera.PDF27 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Alpha Decl Index II.PDF27 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Index II Alpha Corr Dec.PDF27 Jul 2022
Layout approvalFile: 1.pdf4 May 2022
Building plan approvalFile: 2.pdf4 May 2022
Building plan approvalFile: 3.pdf4 May 2022
Building plan approvalFile: 4.pdf4 May 2022
Building plan approvalFile: 5.pdf4 May 2022
Copy of Layout Approval (in case of layout)File: 1.pdf4 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf4 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf4 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf4 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf4 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Part 1.pdf4 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Part 2.pdf4 May 2022
OtherFile: change 2.pdf19 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alpha Architect Certificate Mar 22.PDF9 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alpha Engineer Certificate Mar 22.PDF9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Alpha Quality Certificate Mar 22.PDF9 Apr 2022
Disclosure of sold/ booked inventoryFile: Alpha Unsold Inventory Mar 22.PDF9 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alpha CA Certificate Mar 22.PDF9 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf25 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alpha Architect Certificte Dec 2021.PDF24 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alpha Engineer Certificate Dec 21.PDF14 Jan 2022
Disclosure of sold/ booked inventoryFile: Alpha Inventory Dec 21.PDF14 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alpha CA Certificate Dec 21.PDF14 Jan 2022
Building plan approvalFile: 1.pdf11 Nov 2021
Building plan approvalFile: 2.pdf11 Nov 2021
Building plan approvalFile: 3.pdf11 Nov 2021
Building plan approvalFile: 4.pdf11 Nov 2021
Building plan approvalFile: 5.pdf11 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf11 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf11 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf11 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf11 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf11 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement_Certificate.pdf11 Nov 2021
OtherFile: Consent.PDF11 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept21.PDF4 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sept21.PDF4 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Alpha Quality Assurance Certificate Sept21.PDF4 Oct 2021
Disclosure of sold/ booked inventoryFile: Alpha Inventory Sept21.PDF4 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alpha CA Cert Sept21.PDF4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate July21.PDF8 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate July21.PDF8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Form 2A.PDF8 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate July21.PDF8 Jul 2021
Layout approvalFile: Sheet1.pdf29 Jun 2021
Building plan approvalFile: Sheet2.pdf29 Jun 2021
Building plan approvalFile: Sheet4.pdf29 Jun 2021
Building plan approvalFile: Sheet5.pdf29 Jun 2021
Building plan approvalFile: Sheet3.pdf29 Jun 2021
Copy of Layout Approval (in case of layout)File: Sheet1.pdf29 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet2.pdf29 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet3.pdf29 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet4.pdf29 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet5.pdf29 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC070521.PDF29 Jun 2021
Proforma of Allotment letterFile: Konark Alpha Draft Agreement 4.pdf25 Jun 2021
Disclosure of sold/ booked inventoryFile: Rera Sold Inventory.PDF20 May 2021
Details of encumbrancesFile: Index II Mortgage Deed Aditya Birla Finance Ltd.pdf14 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA_CA_Certificate_31033021_new (1).PDF14 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera_CA_Certi_Form_3 (1).PDF20 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect_Certifticate till Nov 2020.pdf4 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate till Nov 2020.PDF4 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Treon_Devlopers_LLP_-Konark_Alpha_till_Nov_2020 (3).pdf4 Dec 2020
Proforma of Allotment letterFile: Booking Letter 2.pdf6 Feb 2020
Proforma of Allotment letterFile: Konark Alpha Draft Agreement 3.pdf6 Feb 2020
Layout approvalFile: sheet1.pdf3 Feb 2020
Building plan approvalFile: sheet2.pdf3 Feb 2020
Building plan approvalFile: sheet3.pdf3 Feb 2020
Building plan approvalFile: sheet4.pdf3 Feb 2020
Building plan approvalFile: sheet5.pdf3 Feb 2020
Copy of Layout Approval (in case of layout)File: sheet1.pdf3 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: sheet2.pdf3 Feb 2020

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Konark Orchid I and JWagholi Kesanand Road Pune98CompletedJun 2019Oct 2018
Konark BellavistaNear Magarpatta city Hadapsar104CompletedAug 2017Jul 2017
Konark OasisWagholi Kesanand Road Pune104CompletedJul 2017Jun 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KONARK ALPHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI13,700+ in Pune

2 kmKONARK ALPHACompleted 43Lapsed / revoked 20Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 100 registered projects within 2 km.

Builder: Treon Developers LLP

Treon Developers LLP has 1 registration on MahaRERA, including KONARK ALPHA. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KONARK ALPHA is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KONARK ALPHA?

The registered promoter entity is Treon Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KONARK ALPHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KONARK ALPHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KONARK ALPHA?

The professionals named in the filing: Architect: ANIL SAYKAR; Engineer: Mr Ashish Dhuru; Chartered Accountant: R S BIRADAR & CO; Chartered Accountant: SUNIL JAKHITE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KONARK ALPHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KONARK ALPHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KONARK ALPHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.