Home / Browse projects / Thane, Maharashtra / Kohinoor Highland

Completed Litigation declared Residential / Group Housing project

Kohinoor Highland

By KGI REALTY PRIVATE LIMITED

RG-MH-05487 · RERA P51700051023 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Staircases, 90%
49 of 266Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Kohinoor Highland is a Residential / Group Housing project by KGI REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700051023 on 22 May 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 217 of the 266 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKohinoor Highland
  • TypeResidential / Group Housing
  • Location
    • Diva road
    • Usarghar
    • Dombivili
    • Usarghar
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051023
  • ReraGenie IDRG-MH-05487

Builder

  • NameKGI REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109MH2019PTC323777
  • GSTIN27AAHCK5827B1ZM
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsAashish Shankar Hotchandani, Amit Anil Hotchandani, Sonu Anil Hotchandani
  • Other registrations15 more →
  • Completed3 of 16
  • No longer live2 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Current status

82%217 of 266 units booked
84.4%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kohinoor HighlandNA20202606266

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Kohinoor Highland: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Open Space150

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,757 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2026

Approvals and building plan

Permissible FSI18288.53
Proposed, not sanctioned14,289 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRatan Mansion, near furniture Bazar, Nehru Chowk, Ulhasnagar 2
Estimated costRs 45.00 cr
Cost incurredRs 38.00 cr
Work done84.44%
BuildingWingEstimatedIncurred
Kohinoor HighlandNARs 40.00 crRs 34.80 cr
-NARs 5.00 crRs 3.20 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay Pandey
EngineerG A Bhillare Consultants
EngineerAtesh PRAHLAD JADHAV
Chartered AccountantVikas Kamra and Co
Chartered AccountantMANISHA GERELLA
Chartered AccountantRidhi Shah
Chartered AccountantRaashi Kapil Kataria
PartnerRole in project
KGI REALTY PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
78/2023kalyan civil court Jr Divongoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Archi-mar.pdf3 Jun 2026
Withdrawal Update Form 1File: Archi-mar.pdf3 Jun 2026
Withdrawal Update Form 1File: Archi-mar.pdf3 Jun 2026
Withdrawal Update Form 2File: Eng marc.pdf3 Jun 2026
Withdrawal Update Form 2File: Eng marc.pdf3 Jun 2026
Withdrawal Update Form 2File: Eng marc.pdf3 Jun 2026
Withdrawal Update Form 3File: ca form 3 upload_compressed.pdf3 Jun 2026
Withdrawal Update Form 3File: ca form 3 upload_compressed.pdf3 Jun 2026
Withdrawal Update Form 3File: ca form 3 upload_compressed.pdf3 Jun 2026
Occupational CertificateFile: OC highland.pdf3 Jun 2026
Withdrawal Update Form 1File: Arc-dec.pdf2 Jun 2026
Withdrawal Update Form 2File: Eng dec.pdf2 Jun 2026
Withdrawal Update Form 3File: ca dec upload_compressed.pdf2 Jun 2026
Withdrawal Update Form 1File: Architect upload.pdf1 Jun 2026
Withdrawal Update Form 2File: HIGHLAND ENGINEER CERTIFICATE.pdf1 Jun 2026
Withdrawal Update Form 3File: CA Certificate.pdf1 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 highland 31032025.pdf18 May 2026
Form 1File: Architect Certificate.pdf21 Jul 2025
Form 2File: Engineers Certificate Highland.pdf21 Jul 2025
Form 3File: CA Certificate.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rera Letter.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate Highland.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 4 sold unsold inventory.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5 kohinoor highland.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Kohinoor Highland.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Kohinoor Highland.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Highland signed.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Signed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE HIGHLAND.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Highland.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Highland Certificate.pdf29 Apr 2024
Layout approvalFile: Revised plan sheet-1.pdf27 Feb 2024
Building plan approvalFile: Revised plan sheet-2.pdf27 Feb 2024
Building plan approvalFile: Revised plan sheet-3.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: Revised plan sheet-1.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised plan sheet-2.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised plan sheet-3.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate - 2024.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Highland_11zon.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 highland_11zon.pdf27 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold disclosure highland_11zon.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 highland_11zon.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Highland to upload_11zon.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Highland to upload_11zon.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: booking inventory_11zon.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold-Highland_11zon.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_11zon.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Highland to upload_11zon.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf14 Aug 2023
Disclosure of sold/ booked inventoryFile: sold unsold 30062023 highland_11zon.pdf14 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf14 Aug 2023
Layout approvalFile: Highlighted Layout.pdf16 May 2023
Copy of Layout Approval (in case of layout)File: Highlighted Layout.pdf16 May 2023
Declaration about Commencement CertificateFile: Declaration_CC.pdf16 May 2023
Declaration in FORM BFile: FormB.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngineerCertificate.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: 6 Disclosure of Sold unsold.pdf16 May 2023
CERSAI detailsFile: Cersai.pdf16 May 2023
Other - TechnicalFile: other technical.pdf16 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation_AFS.pdf9 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SeparateBankAccHighland.pdf21 Apr 2023
Copy of the legal title reportFile: Title Certificate_compressed.pdf20 Apr 2023
Details of encumbrances concerned to FinanceFile: Fencumbrances.pdf20 Apr 2023
Details of encumbrances concerned to FinanceFile: Lencumbrances.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: Fencumbrances.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: Lencumbrances.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAcertificate-compressed.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf20 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kohinoor AashiyanaChichpada188CompletedOct 2024Oct 2023

How this compares with Thane

82%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Highland on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Usarghar, Dombivili7,600+ in Thane

2 kmKohinoor HighlandCompleted 14Lapsed / revoked 6Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: KGI REALTY PRIVATE LIMITED

KGI REALTY PRIVATE LIMITED has 16 registrations on MahaRERA, including KOHINOOR AASHIYANA and Kohinoor Eden. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Kohinoor Highland is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Highland?

The registered promoter entity is KGI REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2019PTC323777 and GSTIN 27AAHCK5827B1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Highland?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kohinoor Highland?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Highland?

The professionals named in the filing: Architect: Vijay Pandey; Engineer: G A Bhillare Consultants; Engineer: Atesh PRAHLAD JADHAV; Chartered Accountant: Vikas Kamra and Co; Chartered Accountant: MANISHA GERELLA; Chartered Accountant: Ridhi Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Highland?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Highland. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Highland to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one