KEKARAV SECTOR 4

By MIDORI REALTY LLP

RG-MH-56324 · RERA P52100053981 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
34 of 100Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

KEKARAV SECTOR 4 is a Plotted project by MIDORI REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100053981 on 18 Dec 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 66 of the 100 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKEKARAV SECTOR 4
  • TypePlotted
  • Location
    • BAVDHAN BK
    • BANDHAN BK
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053981
  • ReraGenie IDRG-MH-56324

Builder

  • NameMIDORI REALTY LLP
  • Entity typePartnership
  • PartnersASHISH MADHAV MALPANI, MANISH MADHAV MALPANI, SANJAY OMKARNATH MALPANI, RAJESH OMKARNATH MALPANI, GIRISH MADHAV MALPANI

Key dates

this monthRegisteredDec 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • BuildingsNot stated in filing
  • Documents filed89 files

Current status

66%66 of 100 units booked

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes65%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area29,641 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2025
LandownerVillageDistrict
Midori Realty LLpPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINSIDE LICCA EXTENTION COUNTER AKASHGANGA BLDG KHADKI ROAD GANESH KHIND PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a Architecture
EngineerGeetanjali Chappar
Chartered AccountantN N Bagwan and Associates
Chartered AccountantV S A P & Company
PartnerRole in project
MIDORI REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07032620134Dec 2025 → Dec 2026

Reason as filed by the promoterThe project involves infrastructure development for plotted project, which has presented unforeseen challenges. Development progress stands at approximately 45% completion. However, delays have occurred due to: i. Our project is located in hilly area, due to Prolonged monsoon seasons in 2024 and 2025, causing landslides and soil erosion typical to hilly areas, halting work for approximately 4-5 months cumulatively. ii. Supply chain disruptions for materials suited to hilly construction, such as reinforced concrete and drainage systems iii. Challenges in obtaining specialized equipment and skil

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1 Kekarav Sector Architect Form 1 as on 31032026.pdf26 Jun 2026
Withdrawal Update Form 2File: 2 Kekarav Sector Engineer Form 2 as on 31032026.pdf26 Jun 2026
Withdrawal Update Form 3File: 3 Kekarav Sector CA Form 3 as on 31032026-compressed.pdf26 Jun 2026
Commencement certificateFile: 250428 - CC.pdf7 Mar 2026
Layout approvalFile: 01-07_compressed.pdf7 Mar 2026
Layout approvalFile: 02-07.pdf7 Mar 2026
Layout approvalFile: 03-07_compressed and highlighted .pdf7 Mar 2026
Layout approvalFile: 04-07.pdf7 Mar 2026
Layout approvalFile: 05-07.pdf7 Mar 2026
Layout approvalFile: 06-07.pdf7 Mar 2026
Layout approvalFile: 07-07.pdf7 Mar 2026
Withdrawal Update Form 1File: Kekarav Sector 4 Form 1 Architect as on 31122025.pdf7 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Kekarav Sector 4 as on 31122025.pdf7 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Kekarav Sector 4 as on 31122025 (1)-compressed.pdf7 Mar 2026
Form 1File: Arch Certificate Form1 Q2.PDF6 Mar 2026
Form 2File: Engineer Form 2 as on 31122024.pdf6 Mar 2026
Form 3File: CA Form 3 as on 31122024.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: KS4 Sold Unsold as on 31122024.pdf6 Mar 2026
Form 1File: Kekarav Sector 4 Form 1 Architect as on 31032025.pdf6 Mar 2026
Form 2File: Engineer Form 2 as on 31032025.pdf6 Mar 2026
Form 3File: CA Form 3 as on 31032025.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: KS4 Sold Unsold as on 31032025.pdf6 Mar 2026
Withdrawal Update Form 1File: Kekarav Sector 4 Form 1 Architect as on 30062025.pdf6 Mar 2026
Withdrawal Update Form 1File: Kekarav Sector 4 Form 1 Architect as on 30092025.pdf6 Mar 2026
Withdrawal Update Form 2File: Engineer Form 2 as on 30062025.pdf6 Mar 2026
Withdrawal Update Form 2File: Engineer Form 2 as on 30092025.pdf6 Mar 2026
Withdrawal Update Form 3File: CA Form 3 as on 30062025.pdf6 Mar 2026
Withdrawal Update Form 3File: CA Form 3 as on 30092025.pdf6 Mar 2026
Form 1File: Arch Certificate Form1 Q4.PDF3 Oct 2025
Form 2File: Form2 310324.pdf3 Oct 2025
Form 3File: CA Form 3 Midori Realty LLP- Kekarav S4 as on 31-03-2024_compressed.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 24.pdf3 Oct 2025
Form 1File: Arch Certificate Form1 Q1 24-25.PDF3 Oct 2025
Form 2File: Engineer Form 2 30062024 Kekarav S4_Midori Realty LLP.pdf3 Oct 2025
Form 3File: CA form 3 30062024 Kekarav S4_Midori Realty LLP Scan.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold as on 30062024 KS4- Midori Realty.pdf3 Oct 2025
Form 1File: Arch Certificate Form1 Q2.PDF3 Oct 2025
Form 2File: Engineer Form 2 30092024 Kekarav S4_Midori Realty LLP.pdf3 Oct 2025
Form 3File: CA form 3 30092024 Kekarav S4_Midori Realty LLP Scan.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold as on 30092024 KS4- Midori Realty.pdf3 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 30062024 Kekarav S4_Midori Realty LLP Scan_compressed.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 30092024 Kekarav S4_Midori Realty LLP Scan_compressed.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 30062024 Kekarav S4_Midori Realty LLP.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 30092024 Kekarav S4_Midori Realty LLP.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Form1 Q2.PDF6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Form 1 as on 300924 - Midori_compressed.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Midori Realty LLP- Kekarav S4 as on 31-03-2024_compressed.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer- as on 31032024 Midori Realty KS4.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold as on 30062024 KS4- Midori Realty.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold as on 30092024 KS4- Midori Realty.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer- Quality Assurance as on 31032024- Midori KS4.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Form 1 as on 310324 - Midori.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Form 1 as on 300624 - Midori_compressed.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Form 1 as on 300924 - Midori_compressed.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory as on 310324- Midori.pdf26 Dec 2024
Home Buyer /Allottee Grievance Redressal CellFile: Home Buyer Redressal Cell - Midori.pdf26 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format A- Bank Declaration by Promoter - Midori.pdf26 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Final.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: No Legal Encum.pdf10 Nov 2023
Details of encumbrances concerned to LegalFile: No Legal Encum.pdf10 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AMM - Annexure A.pdf10 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GMM - Annexure A.pdf10 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MOM - Annexure A.pdf10 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ROM - Annexure A.pdf10 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SOM - Annexure A.pdf10 Nov 2023
Other - LegalFile: Declaration for Sanction with Index 2.pdf3 Nov 2023
Other - TechnicalFile: Confrimation Mail - PMRDA to RERA Authority.pdf28 Oct 2023
CERSAI detailsFile: 1 CERSAI details (1)_compressed.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf25 Oct 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (1).pdf25 Oct 2023
Declaration about Commencement CertificateFile: MIDORI SELF DECLARATION -COMMENCEMENT CERTIFICATE.pdf19 Oct 2023
Declaration in FORM BFile: Form B - AFFIDAVIT CUM DECLARATION_compressed.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Oct 2023
Proforma of Allotment letterFile: MIDORI ALLOTMENT LETTER_compressed.pdf4 Oct 2023
Proforma of Agreement for saleFile: MIDORI AGREEMENT TO SALE.pdf4 Oct 2023
Deviation Report with respect to Allotment letterFile: MIDORI NO DEVIATION ALLOTMENT LETTER.pdf4 Oct 2023
Deviation Report with respect to model copy of AgreementFile: MIDORI DEVIATION REPORT - Agreement to Sale.pdf4 Oct 2023
Copy of the legal title reportFile: Advocate- 01 Title Report.pdf5 Sep 2023
Copy of the legal title reportFile: Advocate- 02 RERA Format A.pdf5 Sep 2023
Layout approvalFile: Sheet 1of3.pdf19 Jul 2023

How this compares with Pune

66%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KEKARAV SECTOR 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDHAN BK13,700+ in Pune

2 kmKEKARAV SECTOR 4Completed 17Lapsed / revoked 6Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: MIDORI REALTY LLP

MIDORI REALTY LLP has 1 registration on MahaRERA, including KEKARAV SECTOR 4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KEKARAV SECTOR 4 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KEKARAV SECTOR 4?

The registered promoter entity is MIDORI REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KEKARAV SECTOR 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KEKARAV SECTOR 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KEKARAV SECTOR 4?

The professionals named in the filing: Architect: VK a Architecture; Engineer: Geetanjali Chappar; Chartered Accountant: N N Bagwan and Associates; Chartered Accountant: V S A P & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KEKARAV SECTOR 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KEKARAV SECTOR 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KEKARAV SECTOR 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.