ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / KAVYA RESIDENCY

Registration lapsed No litigation declared Others project

KAVYA RESIDENCY

By KAVYA MIRA REALTY

RG-MH-33992 · RERA P51700010584 · Last updated on MahaRERA portal: 4 Oct 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • 14 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
15 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 95%
14Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

KAVYA RESIDENCY is a Others project by KAVYA MIRA REALTY in Thane, Maharashtra, registered with MahaRERA as P51700010584 on 31 Aug 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. The completion date has moved by 24 months from the original filing. 14 complaints are on record with the regulator.

At a glance

Project

  • NameKAVYA RESIDENCY
  • TypeOthers
  • Location
    • THANE
    • Thane (M Corp.)
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010584
  • ReraGenie IDRG-MH-33992

Builder

  • NameKAVYA MIRA REALTY
  • Entity typePartnership
  • PartnersMANSUKHALAL CHATRABHUJ VORA, JIGNESH MANSUKHLAL VORA, KAJAL NIMISH VORA
  • Declared earlier projects4 →

Key dates

58 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAVYA RESIDENCY A WINGNA150000
KAVYA RESIDENCY C WINGNA90000
KAVYA RESIDENCY B WINGNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.

KAVYA RESIDENCY A WING88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.93%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
KAVYA RESIDENCY C WING88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
KAVYA RESIDENCY B WING88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.93%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 4 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes25%
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
KAVYA RESIDENCY A WING11
KAVYA RESIDENCY C WING11
KAVYA RESIDENCY B WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,270 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15469.67
Proposed, not sanctioned10,431 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, VENUS APRTMENT GROUND FLOOR WADIA STREET TARDEO MUMBAI -400034

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKRUTI CONSULTANT
EngineerPARAS COUNSULTANTS
PartnerRole in project
KAVYA MIRA REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700008483Dec 2019 → Jun 2021

Reason as filed by the promoterDUE TO NON PROCUREMNET OF OC THOUGH FULL WORK ON SITE HAS BEEN COMPLETED. WE WOULD LIKE TO TAKE EXTENSION FOR 1 YEAR.

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC006000000001488Kamni HingoraniKavya Mira Realty27/10/2017
CC006000000001508Kamni HingoraniM/s. Kavya Mira Realty28/10/2017
CC006000000001543Modern Abodes Pvt LtdM/s. kavya Mira Realty28/10/2017
CC006000000054879JASPAL SINGH KHANNAKavya Mira Realty07/07/2018
CC006000000054925KAUSHAL KUMAR MODIKAVYA MIRA REALTY08/07/2018
CC006000000054933GITA DEVI MODIKAVYA MIRA REALTY07/07/2018
CC006000000054934MANGESH CHAVANKAVYA MIRA REALTY07/07/2018
CC006000000054935BHAGAT SINGH BUTOLAKAVYA MIRA REALTY07/07/2018
CC006000000054936ANANT LADKAVYA MIRA REALTY07/07/2018
CC006000000056067Sandip Dinesh RajeMr Nimesh Vora03/09/2018
CC006000000056840SANDIP DINESH RAJEKAVYA MIRA REALTY08/11/2018
CC006000000056286Kavya flat owners groupnimish Vora14/10/2018
CC006000000100300M/s. B.K. Finance Corporation Pvt LtdM/s. Kavya Mira Realty25/07/2019
CC006000000292464TARAK DINESH SHAHKavya Mira Realty26/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 1.pdf4 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 2.pdf4 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 3.pdf4 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 4.pdf4 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 5.pdf4 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 6.pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form- 2 (1).pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form- 2 (2).pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form- 2( 3).pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form- 2 (4).pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form- 2 (5).pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form- 2A (1).pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form- 2A (2).pdf4 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KAVA_MIRA.pdf31 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A KMR 2020.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A KMR 2021.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - 19-20.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Kavya Mira Realty 20-21.pdf26 Jul 2021
Declaration about Commencement CertificateFile: CC COVERING LETTER RESIDENCY.pdf21 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KMR F5.pdf12 Nov 2020
OtherFile: OC Apllication.pdf13 Feb 2019
Certificates of CA (Form 3)File: CA Cert KMR.pdf26 Oct 2018
Certificates of CA (Form 5)File: KAVYA RESIDENCY Compressed.pdf9 Oct 2018
Building plan approvalFile: IOD4.pdf31 Jul 2017
Layout approvalFile: Layout Plan.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD4.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CER.pdf31 Jul 2017
PAN CardFile: KMR PAN CARD.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE.pdf30 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Kavya Residency CC.pdf30 Jul 2017
Declaration in FORM BFile: FORM B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT NEW.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KMR_Engineer Certificate.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE2.pdf30 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT.pdf30 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KAVYA HILL VIEWTHANE107CompletedJan 2012Late, Mar 2012
ATLASTHANE45CompletedMar 2011Late, May 2011
Atlantis, ThaneTHANE84CompletedMar 2010Late, Jul 2010

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAVYA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE7,600+ in Thane

2 kmKAVYA RESIDENCYCompleted 76Lapsed / revoked 25Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: KAVYA MIRA REALTY

KAVYA MIRA REALTY has 1 registration on MahaRERA, including KAVYA RESIDENCY. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that KAVYA RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KAVYA RESIDENCY is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAVYA RESIDENCY?

The registered promoter entity is KAVYA MIRA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAVYA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAVYA RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAVYA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAVYA RESIDENCY?

The professionals named in the filing: Architect: AKRUTI CONSULTANT; Engineer: PARAS COUNSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAVYA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAVYA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAVYA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.