Home / Browse projects / Nashik, Maharashtra / KASTURI SPACE

Completed No litigation declared Others project

KASTURI SPACE

By KALPANA HIRAJI PAWAR

RG-MH-61095 · RERA P51600050950 · Last updated on MahaRERA portal: 2 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

KASTURI SPACE is a Others project by KALPANA HIRAJI PAWAR in Nashik, Maharashtra, registered with MahaRERA as P51600050950 on 15 May 2023. The registration is recorded completed; possession was promised by 8 Jun 2027.

At a glance

Project

  • NameKASTURI SPACE
  • TypeOthers
  • Location
    • AMBAD SHIWAR
    • NASHIK
    • Nashik (M Corp.)
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600050950
  • ReraGenie IDRG-MH-61095

Builder

  • NameKALPANA HIRAJI PAWAR
  • Entity typeIndividual

Key dates

this monthRegisteredMay 2023PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 May 2023
  • Promised completion8 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KASTURI SPACENA97000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

KASTURI SPACE: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area502 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI2029.82
Proposed, not sanctioned2,030 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREE GANESH PLAZA UNIT NO G-1 TO G-5 TIDKE NAGAR NASHIK-422002

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVI AMRUTKAR
EngineerBHANUVILAS PUNDLIK BHAVSAR
Chartered AccountantSHIKHA RAJESH MADAN
Chartered AccountantSANDEEP CHANDRAKANT CHAVANKE
PartnerRole in project
KALPANA HIRAJI PAWAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Mar 2025

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf2 Jun 2025
Form 2File: form 2.pdf2 Jun 2025
Form 3File: FORM 3.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf2 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration of quarterly progress.pdf2 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf2 Jun 2025
Occupational CertificateFile: Full Occpancy Certificate.pdf2 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occpancy Certificate.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.PDF22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_11zon.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024 Kasturi.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024 Kasturi.pdf30 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 310302024 Kasturi.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032024 Kasturi.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf31 Oct 2023
Details of encumbrances concerned to FinanceFile: Details Of Encumbrances Finance.pdf4 May 2023
Details of encumbrances concerned to FinanceFile: Details Of Legal Encumbrances.pdf4 May 2023
Details of encumbrances concerned to LegalFile: Details Of Encumbrances Finance.pdf4 May 2023
Details of encumbrances concerned to LegalFile: Details Of Legal Encumbrances.pdf4 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Model Copy of Agreement.pdf4 May 2023
Proforma of Agreement for saleFile: RERAREG DRAFT FINAL.pdf12 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200263503717_For_Asset_Based_Search_19_03_2023_12_10_46_124.pdf19 Mar 2023
Layout approvalFile: plotscanfinal-min.pdf18 Mar 2023
Building plan approvalFile: BULDPLAN-min.pdf18 Mar 2023
PAN CardFile: pan.pdf18 Mar 2023
Copy of the legal title reportFile: title search-min.pdf18 Mar 2023
Details of encumbrances concerned to FinanceFile: encumrances.pdf18 Mar 2023
Details of encumbrances concerned to LegalFile: encumrances.pdf18 Mar 2023
Copy of Layout Approval (in case of layout)File: plotscanfinal-min.pdf18 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: BULDPLAN-min.pdf18 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Revise Commencement Certificate-final.pdf18 Mar 2023
Declaration about Commencement CertificateFile: declartion about commencement.pdf18 Mar 2023
Declaration in FORM BFile: FINAL FORM B.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect.pdf18 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE KASTURI SPACE.pdf18 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf18 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annedture A no interest in other project.pdf18 Mar 2023
Proforma of Allotment letterFile: ANNEXURE 1 MODEL FORM OF ALLOTMENT LETTER.pdf18 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf18 Mar 2023
Deviation Report with respect to Allotment letterFile: declaration about deviation.pdf18 Mar 2023

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KASTURI SPACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmKASTURI SPACECompleted 52Lapsed / revoked 14Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: KALPANA HIRAJI PAWAR

KALPANA HIRAJI PAWAR has 1 registration on MahaRERA, including KASTURI SPACE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if KASTURI SPACE is delayed beyond 8 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KASTURI SPACE?

The registered promoter entity is KALPANA HIRAJI PAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KASTURI SPACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KASTURI SPACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KASTURI SPACE?

The professionals named in the filing: Architect: RAVI AMRUTKAR; Engineer: BHANUVILAS PUNDLIK BHAVSAR; Chartered Accountant: SHIKHA RAJESH MADAN; Chartered Accountant: SANDEEP CHANDRAKANT CHAVANKE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KASTURI SPACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KASTURI SPACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KASTURI SPACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.