Home / Browse projects / Pune, Maharashtra / Karma Rejoice

Registered No litigation declared Residential / Group Housing project

Karma Rejoice

By Rejoice homes LLP

RG-MH-12833 · RERA P52100024825 · Last updated on MahaRERA portal: 15 Jul 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 18 months from the original
14 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 98%
78 of 97Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Karma Rejoice is a Residential / Group Housing project by Rejoice homes LLP in Pune, Maharashtra, registered with MahaRERA as P52100024825 on 9 Mar 2020. Possession is promised by 30 Jun 2028. The completion date has moved by 18 months from the original filing. 19 of the 97 units on this registration are recorded sold or booked, and 14 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKarma Rejoice
  • TypeResidential / Group Housing
  • Location
    • Undri Pisoli Shiv Road
    • Bricks Collage
    • Undri Pisoli Shive Undri Pune
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024825
  • ReraGenie IDRG-MH-12833

Builder

  • NameRejoice homes LLP
  • Entity typePartnership
  • PartnersPANKAJ PURUSHOTTAM MANTRI, MAYUR PURUSHOTTAM MANTRI
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2020First promiseDec 2026Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2020
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2026)
  • Buildings4 building records
  • Documents filed67 files

Current status

20%19 of 97 units booked

Figures as on 15 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA150000
WING DNA160000
WING ANA16043043
WING BNA151454054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 15 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 98%.

WING C93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING D93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed195

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots195
Closed/Covered119
Open Space76
BuildingClosed/CoveredOpen SpaceTotal
WING C301444
WING D371552
WING A263157
WING B261642

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
kaluram abnavePune (M Corp.)Pune
Lata Kaluram AbnavePune (M Corp.)Pune
Ajinkya AbnavePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION
Permissible FSI11475.0
Proposed, not sanctioned5,606 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEast Street, Camp Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY AERAM
EngineerHEMANTKUMAR A NIMBALKAR
EngineerKAILAS NAZIRKAR
Chartered AccountantCA.DIPTI NITIN LADDHA
PartnerRole in project
Rejoice homes LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027109Dec 2026 → Jun 2028

Reason as filed by the promoterIn 2017, the Maharashtra government issued a Government Resolution (GR) to include 11 new villages, including Undri areas, into the Pune Municipal Corporation (PMC) limits. With the expansion of PMC’s jurisdiction, it was expected that the corporation would publish a Development Plan (DP) for the newly merged villages, as PMC would act as the planning authority for these areas. However, due to unforeseen circumstances, the Development Plan for these newly merged villages has not been published to date. This delay has had an impact on the approval process for Transfer of Development Rights (TDR

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12504689Bhumesh Kumar SRejoice homes LLP30/12/2025
CC12504437Anish Charudatta GalgateRejoice homes LLP13/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q1 FY 25-26.pdf15 Jul 2025
Form 2File: Form 2 Q1 FY 25-26.pdf15 Jul 2025
Form 3File: Form 3 Q1 FY 25-26.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclouse of Inventory.pdf15 Jul 2025
Form 3File: Form 3 Q4 FY 24-25.pdf14 May 2025
Form 1File: Form 3 Q4 FY 24-25.pdf14 May 2025
Form 2File: Form 1 Architect's Certificate Q-3.pdf14 May 2025
Form 3File: Form 2 Engineer's Certificate Q-3.pdf14 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 24-25.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 24-25.pdf13 May 2025
Details of encumbrances concerned to FinanceFile: Legal encumbrances certificate - RJ.pdf15 Feb 2025
Declaration about Commencement CertificateFile: Commencement Certificate_compressed.pdf15 Feb 2025
Details of encumbrances concerned to LegalFile: Legal encumbrances certificate - RJ.pdf15 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf15 Feb 2025
Proforma of Agreement for saleFile: Rejoice Home LLP Sale Agreement Profoma.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Engineer's Certificate Q-3.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate Q-3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate Q-3 (1).pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 Rejoice Home LLP.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rejoice Home LLP Form 5 FY 23-24.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rejoice Home LLP Q2 FY 24-25.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q2 FY 24-25.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginers Certificate - Rejoice Form 2.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 23-24 Rejoice.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 23-24 Rejoice.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: Karma Rejoice 30923.pdf5 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rejoice homes LLPform 3 Q-1 23-24.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rejoice Homes LLP form 3 Q-2 23-24.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Karma Rejoice Q-1.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Karma Rejoice Q-2.pdf4 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 REJOICE Q-1.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 REJOICE Q-2.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Karma Rejoice form 5.pdf20 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 karma Rejoice_compressed.pdf9 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rejoice form 2.pdf7 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rejoice Homes LLP 2A -22-23.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rejoice Homes LLP Form 1.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate of Rejoice Site.pdf6 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Rejoice Homes LLP.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RHLLP ARCHITECT CERTIFICATE.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rejoice Form 2A FY 2021-22.pdf12 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rejoice homes llp- form 5.pdf12 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rejoice Form 2 July to Sept 2022_compressed.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rejoice Form 3 July to Sept 2022_compressed.pdf11 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Rejoice.pdf23 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Rejoice_compressed.pdf23 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Rejoice_compressed_compressed (1).pdf23 Jul 2022
Disclosure of sold/ booked inventoryFile: karma rejoice.pdf1 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aRCHITECT CERTIFICATE 2 ND.pdf24 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate scan 2 nd.pdf24 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 2 nd.pdf24 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: DocScanner Jan 29, 2022 Rejoice.pdf31 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: rejoice llp.pdf30 Dec 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf19 Mar 2021
Details of encumbrancesFile: Encumbrance .pdf2 Mar 2020
Declaration in FORM BFile: FORM B Pankaj Mantri .pdf2 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rejoice Form 3.pdf2 Mar 2020
Proforma of Allotment letterFile: final allotment letter format (2).pdf2 Mar 2020
Proforma of Allotment letterFile: rejoice agreement .pdf2 Mar 2020
Layout approvalFile: Scan_0511-02-DP LAYOUT PLOT -1A_compressed (1).pdf27 Feb 2020
Building plan approvalFile: Building Plan Approval.pdf27 Feb 2020
Copy of Layout Approval (in case of layout)File: Scan_0511-02-DP LAYOUT PLOT -1A_compressed (1).pdf27 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf27 Feb 2020
Copy of the legal title reportFile: Title Search undri_com (1).pdf23 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate .pdf23 Dec 2019
PAN CardFile: REJOICE HOMES LLP PAN.pdf16 Oct 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
TIERRAP52100006109WAGHOLI, PuneAug 2017CompletedDec 2018Late, Mar 2019

How this compares with Pune

20%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Karma Rejoice on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bricks Collage, Undri Pisoli Shive Undri Pune13,700+ in Pune

2 kmKarma RejoiceCompleted 62Lapsed / revoked 27Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 130 registered projects within 2 km.

Builder: Rejoice homes LLP

Rejoice homes LLP has 1 registration on MahaRERA, including Karma Rejoice. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Karma Rejoice is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Karma Rejoice?

The registered promoter entity is Rejoice homes LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Karma Rejoice?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Karma Rejoice?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Karma Rejoice?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Karma Rejoice?

The professionals named in the filing: Architect: JAY AERAM; Engineer: HEMANTKUMAR A NIMBALKAR; Engineer: KAILAS NAZIRKAR; Chartered Accountant: CA.DIPTI NITIN LADDHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Karma Rejoice?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Karma Rejoice. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Karma Rejoice to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.