Completed No litigation declared Others project

KARMA PALACE

By SHREE SAI DEVELOPERS

RG-MH-50175 · RERA P99000031586 · Last updated on MahaRERA portal: 20 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

KARMA PALACE is a Others project by SHREE SAI DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000031586 on 31 Oct 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameKARMA PALACE
  • TypeOthers
  • Location
    • .
    • TEMBHODE
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000031586
  • ReraGenie IDRG-MH-50175

Builder

  • NameSHREE SAI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEIFS8639F1ZJ
  • PartnersMEHUL SUNIL SATRA, AJAY SURESH SOGALE, KARORE BABURAM SHARMA
  • Other registrations28 more →
  • Completed9 of 29
  • No longer live11 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredOct 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Oct 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KARMA PALACENA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KARMA PALACE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 20 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Compound wallYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area287 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2024

Approvals and building plan

Sanctioning authorityPALGHAR NAGARPARISHAD PALGHAR
Permissible FSI645.11
Proposed, not sanctioned645 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKACHERI ROAD,PALGHAR

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGESH MHATRE MHATRE
EngineerMAHENDRA RANE
EngineerATUL CHAUDHARI
Chartered AccountantYOGESH WALAVALKAR
Chartered AccountantYOGESH JAYKUMAR WALAVALKAR
Chartered AccountantAMIT ARUN JOSHI
Chartered AccountantRISHABH VORA
PartnerRole in project
SHREE SAI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Oct 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSD WORK COMPLETION.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD Form 3 Q2 FY 24 25.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SSD Q2 FY 24 25.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: SSD SOLD UNSOLD 30 09 24.pdf20 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: SSD FORM 4.pdf15 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SSD OC.pdf15 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SSD WORK COMPLETION.pdf15 Oct 2024
Other - TechnicalFile: SSD WORK COMPLETION.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Q 4 FY 23 24 Signed.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf8 Oct 2024
Form 5 (FY 2023-2024)File: FORM 5 23-24 jayant.pdf3 Oct 2024
Form 5 (FY 2021-2022)File: Form 5 FY 2021-22 LAT.pdf1 Oct 2024
Form 5 (FY 2022-2023)File: Form 5 Shree sai Developers FY 22 23.pdf29 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SING.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SING.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: sold unsold SSD Q1 FY 24-25.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SIGN.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD Q4 FY 23 24 FORM 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q 4 FY 23 24 signed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q 4 FY 23 24 signed.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOL Q 4 FY 23 24.pdf19 Apr 2024
Other - TechnicalFile: FORM 2A Q 4 FY 23 24 Signed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD FORM 3 Q3 FY 23 24.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold SSD Q3 FY 23 24.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSD FORM 1 Q2 FY 23 24 SIGNED.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSD FORM 2 Q2 FY 23 24 SIGNED.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY 22 23 SIGNED.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SSD SOLD UNSOLD Q2 FY 23 24.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SSD SOLD UNSOLD Q2 FY 23 24.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Q 2 FY 23 24.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shree sai Developers FY 22 23.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED.pdf8 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIGNED.pdf8 Jul 2023
Disclosure of sold/ booked inventoryFile: sold unsold SSD_page-0001.pdf8 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 SIGNED.pdf8 Jul 2023
Proforma of Agreement for saleFile: Mehur Satara Blank Draft AFS LATEST.pdf23 May 2023
Disclosure of sold/ booked inventoryFile: sold unsold SSD.pdf27 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Apr 2023
Other - TechnicalFile: FORM 2A.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SSD.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SHREE SAI DEVELOEPR FORM 2A.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PSC FORM 1.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf13 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PSC FORM 1.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf7 Oct 2022
Other - FinanceFile: Form 5 FY 2021-22.pdf22 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_compressed.pdf24 Jul 2022
Proforma of Allotment letterFile: Mehul_Satra_RERA_Fresh Draft.pdf24 Jul 2022
Proforma of Allotment letterFile: Mehul_Satra_RERA_Fresh Draft.pdf6 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mehul Sunil Satre ( Rera Certificate ) 001.pdf4 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree sai developer Form 2.pdf4 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf4 Jul 2022
Other - TechnicalFile: SHREE SAI DEVELOEPR FORM 2A.pdf4 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 1.pdf13 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf13 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SINGED.pdf22 Oct 2021
Details of encumbrancesFile: letter of encumbrance.pdf21 Oct 2021
Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf21 Oct 2021
Layout approvalFile: PLAN_compressed.pdf20 Oct 2021
Building plan approvalFile: PLAN_compressed.pdf20 Oct 2021
PAN CardFile: FIRM PANCARD.pdf20 Oct 2021
Copy of the legal title reportFile: TITLE.pdf20 Oct 2021
Copy of Layout Approval (in case of layout)File: PLAN_compressed.pdf20 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: PLAN_compressed.pdf20 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Oct 2021
Declaration in FORM BFile: FORM b_compressed.pdf20 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed (1).pdf20 Oct 2021

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KARMA PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TEMBHODE3,200+ in Palghar

2 kmKARMA PALACECompleted 104Lapsed / revoked 43Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 250 registered projects within 2 km.

Builder: SHREE SAI DEVELOPERS

SHREE SAI DEVELOPERS has 29 registrations on MahaRERA, including SAI ENCLAVE and CAPETOWN VILLAS. Its filings disclose 9 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if KARMA PALACE is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KARMA PALACE?

The registered promoter entity is SHREE SAI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEIFS8639F1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KARMA PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KARMA PALACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KARMA PALACE?

The professionals named in the filing: Architect: YOGESH MHATRE MHATRE; Engineer: MAHENDRA RANE; Engineer: ATUL CHAUDHARI; Chartered Accountant: YOGESH WALAVALKAR; Chartered Accountant: YOGESH JAYKUMAR WALAVALKAR; Chartered Accountant: AMIT ARUN JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KARMA PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KARMA PALACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KARMA PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.