Home / Browse projects / Mumbai City, Maharashtra / Kapil Tirth

Registered No litigation declared Residential / Group Housing project

Kapil Tirth

By Prathamesh Projects LLP

RG-MH-72946 · RERA P51900050770 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 6 months from the original
8 of 11Construction stages donefurthest along: Internal walls, 90%
22 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Kapil Tirth is a Residential / Group Housing project by Prathamesh Projects LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900050770 on 3 May 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 6 months from the original filing. 10 of the 32 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameKapil Tirth
  • TypeResidential / Group Housing
  • Location
    • PANDURANG NAIK MARG
    • MAHIM
    • Mumbai City
    • 400016
  • Pincode400016
  • RERA no.P51900050770
  • ReraGenie IDRG-MH-72946

Builder

  • NamePrathamesh Projects LLP
  • Entity typePartnership
  • PartnersKinjal Ramesh Pithadia, Bipin Pandurang Pasalkar, Shreeya Viaks Date, Ravi Namdev Koyale, Amarendra Sudhakar Phatak

Key dates

this monthRegisteredMay 2023First promiseJun 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed104 files

Current status

31%10 of 32 units booked
62.7%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAPIL TIRTHnull201532032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

KAPIL TIRTH · wing null: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area493 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
Declared on3 Oct 2024
LandownerVillageDistrict
Mohan Keshav JoshiMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2574.7
Proposed, not sanctioned2,574 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFP NO 350 NEMINATH APRT OFF S K BOLE ROAD DADAR WEST MUMBAI 28
Estimated costRs 18.90 cr
Cost incurredRs 11.86 cr
Work done62.73%
BuildingWingEstimatedIncurred
KAPIL TIRTHnullRs 18.90 crRs 11.86 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Vishnu Kadam
EngineerRamesh D Deshpande
EngineerAmarendra S. Phatak
Chartered AccountantVMD & Co.
Chartered AccountantAbhishek D Gharpure
PartnerRole in project
Prathamesh Projects LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13052620944Jun 2026 → Dec 2026

Reason as filed by the promoterExtension Application for Project Name: KAPIL TIRTH, RERA No.: P51900050770 1. Introduction & Global Geopolitical Impact on Material Supply The Promoter is committed to completing the project with good quality and safety standards. However, due to certain reasonable circumstances beyond our control, we require an extension of time for project completion. The project was affected by global geopolitical conflicts and war situations, which disrupted international shipping and delayed the supply of important imported machinery such as passenger lifts and car lifts. These delays affected the final

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 FY 2025 26 27072026.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 Arch cert no 14 KT 090726.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Engg cert no 13KT 240426.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 CA cert no 14 KT 100726.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 Arch cert no 12 KT 120126.pdf2 May 2026
Withdrawal Update Form 2File: Form 2 Engg cert no 13KT 240426.pdf2 May 2026
Withdrawal Update Form 3File: Form 3 CA cert no 13 KT 150426.pdf2 May 2026
Form 2A (FY 2025-2026)File: Form 2 A 202526.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A QA cert no 2024 25 KT 100625.PDF3 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch cert no 12 KT 120126.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 Engg cert no 12 KT 140126.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 CA cert no 12 KT 071025.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024 25 30102025.pdf18 Nov 2025
Form 1File: Form 1 Arch cert no 11 KT 070725.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 161025.pdf16 Oct 2025
Form 2File: Form 2 Engg cert no 11 KT 160725.pdf16 Oct 2025
Form 3File: Form 3 CA cert no 11 KT 071025.pdf16 Oct 2025
Form 1File: Form 1 Arch cert no 10 KT 070725.pdf17 Jul 2025
Form 2File: Form 2 Engg cert no 10 KT 160725.pdf17 Jul 2025
Form 3File: Form 3 CA cert no 10 KT 160725.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 170725.pdf17 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA cert no 2024 25 KT 100625.PDF10 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 9 KT 030425.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 9 KT 010425.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 9 KT 120425.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 8 KT 150125.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 8 KT 140125.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 8 KT 130125.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023 24 19092024.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 7 KT 091024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 7 KT 151024.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 7 KT 171024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 6 KT 010724.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 6 KT 190724.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 6 KT 150724.pdf26 Jul 2024
Building plan approvalFile: Amended plan showing parking and area highlighted 060724.pdf6 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended plan showing parking and area highlighted 060724.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 5 KT 060724 UPTO 310324.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 5 KT 060724 upto 310324.pdf6 Jul 2024
Other - TechnicalFile: Application for correction by Promoter 060724.pdf6 Jul 2024
Other - TechnicalFile: Consent for Correction from purchaser.pdf6 Jul 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET1.pdf27 May 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET2.pdf27 May 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET3.pdf27 May 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET4.pdf27 May 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET5.pdf27 May 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET6.pdf27 May 2024
Building plan approvalFile: KT Amended IOD Drawing 240124 SHEET7.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET1.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET2.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET3.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET4.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET5.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET6.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KT Amended IOD Drawing 240124 SHEET7.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 5 KT 100524.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA cert no 4 KT 100524.pdf27 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC upto 17th Flr dtd 040424.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 4 KT 031024.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 4 KT 070124.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA cert no 3 KT 080124.PDF3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 4 KT 290124.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 3 KT 031023.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 3 KT 071023.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA cert no 2 KT 031023.PDF12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 3 KT 051023.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert no 2 KT 100823.pdf10 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert no 2 KT 040823.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert no 2 KT 040823.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA cert no 1 KT 040823.pdf4 Aug 2023
Building plan approvalFile: Page 1 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building plan approvalFile: Page 2 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building plan approvalFile: Page 3 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building plan approvalFile: Page 4 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building plan approvalFile: Page 5 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building plan approvalFile: Page 6 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Copy of the legal title reportFile: Title Cert by Shabbir Kapadia 06042023 KT New.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 1 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 2 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 3 resubmitted IOD 27042022 signed KT.pdf8 Apr 2023

How this compares with Mumbai City

31%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 6 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kapil Tirth on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM780+ in Mumbai City

Builder: Prathamesh Projects LLP

Prathamesh Projects LLP has 1 registration on MahaRERA, including Kapil Tirth. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Kapil Tirth is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kapil Tirth?

The registered promoter entity is Prathamesh Projects LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kapil Tirth?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kapil Tirth?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kapil Tirth?

The professionals named in the filing: Architect: Avinash Vishnu Kadam; Engineer: Ramesh D Deshpande; Engineer: Amarendra S. Phatak; Chartered Accountant: VMD & Co.; Chartered Accountant: Abhishek D Gharpure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kapil Tirth?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kapil Tirth. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kapil Tirth to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.