KANAKIA MIAMI
By KANAKIA SPACES REALTY PRIVATE LIMITED
RG-MH-02162 · RERA P51900000206 · Last updated on MahaRERA portal: 10 Feb 2022
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KANAKIA MIAMI is a Residential / Group Housing project by KANAKIA SPACES REALTY PRIVATE LIMITED in 400016, registered with MahaRERA as P51900000206 on 10 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. 4 complaints are on record with the regulator.
At a glance
Project
- NameKANAKIA MIAMI
- TypeResidential / Group Housing
- Location
- 400016
- Pincode400016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900000206
- ReraGenie IDRG-MH-02162
Builder
- NameKANAKIA SPACES REALTY PRIVATE LIMITED
- Entity typeCompany
- CINU70109MH2019PTC331509
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsRasesh Babubhai Kanakia, Himanshu Babubhai Kanakia
- Other registrations10 more →
- Completed11 of 11
- Declared earlier projects15 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Jul 2017
- Promised completion30 Sep 2020
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KANAKIA MIAMI | NA | 28 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
KANAKIA MIAMI: 99% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 10 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 92% |
| Open Parking | Yes | 92% |
| OTHERS | Yes | 100% |
Parking filed113
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr. Rushikesh Hadnoorkar |
| Architect | Mr.Tarun Motta |
| Architect | Mr. Ajay Sawant |
| Engineer | Mr. Watve |
| Engineer | Mr. Charudatta V. Samant |
| Partner | Role in project |
|---|---|
| KANAKIA SPACES REALTY PRIVATE LIMITED | - |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000141101 | NILANJAN DAS | Kanakia Spaces Realty Private Limited | 01/10/2019 |
| CC006000000193308 | Kanakia Spaces Realty Pvt Ltd | Hawa Farhan Pettiwala and Anr | 18/06/2020 |
| CC006000000193392 | Mr. Farhan Pettiwala and Mrs.Hawa Pettiwala | Kanakia Spaces Realty Private Limited | 07/07/2020 |
| CC006000000195527 | Jaikishan Udhav Lakhwani andRahul Raju Lakhwani | Kanakia SpacesRealty Pvt Ltd | 05/01/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Aug 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of ConveyanceFile: mail asking docs for execution of miami conveyance.pdf | 10 Feb 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: miami Society Registration Certificate_compressed.pdf | 23 Dec 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Miami.pdf | 27 Nov 2019 |
| OtherFile: Miami OC.pdf | 18 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Miami.pdf | 4 Nov 2019 |
| Certificates of CA (Form 5)File: miami.pdf | 7 Sep 2019 |
| Certificates of CA (Form 3)File: CA Cert Miami 30062019.pdf | 21 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Miami Arch Certificate 3062019.pdf | 8 Aug 2019 |
| Certificates of CA (Form 3)File: Miami Rera Certificate.pdf | 9 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Miami Architect Certificate 310319.pdf | 8 Jul 2019 |
| Certificates of CA (Form 3)File: Kanakia Miami 22 January 2019.pdf | 29 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate - Miami_31-12-18.pdf | 11 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Miami 30-09-2018.pdf | 19 Nov 2018 |
| Certificates of CA (Form 3)File: Levels Certificate 30 September 2018.pdf | 6 Nov 2018 |
| Certificates of CA (Form 3)File: Miami Certificate 30 Sept 2018.pdf | 6 Nov 2018 |
| Certificates of CA (Form 5)File: Form 5 Miami Rera Registration no P51900000206.pdf | 29 Sep 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: MIAMI CC 30 07 2018.pdf | 4 Sep 2018 |
| Building plan approvalFile: MIAMI IOA 5 07 2018.pdf | 22 Aug 2018 |
| Building Plan Approval (IOD)File: MIAMI IOA 5 07 2018.pdf | 22 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIAMI ARCHITECT CERTIFICATE.pdf | 22 Aug 2018 |
| Certificates of CA (Form 3)File: Miami CA Certificate.pdf | 22 Aug 2018 |
| Certificates of CA (Form 3)File: Miami Cost Certificate.pdf | 11 May 2018 |
| Building plan approvalFile: Sheet No- 4,5.pdf | 21 Feb 2018 |
| Building plan approvalFile: Sheet No- 6,7,8.pdf | 21 Feb 2018 |
| Building plan approvalFile: Sheet No- 9,10.pdf | 21 Feb 2018 |
| Building plan approvalFile: Sheet No- 11,12.pdf | 21 Feb 2018 |
| Building plan approvalFile: Sheet No- 2,3.pdf | 21 Feb 2018 |
| Building Plan Approval (IOD)File: Sheet No- 4,5.pdf | 21 Feb 2018 |
| Building Plan Approval (IOD)File: Sheet No- 6,7,8.pdf | 21 Feb 2018 |
| Building Plan Approval (IOD)File: Sheet No- 9,10.pdf | 21 Feb 2018 |
| Building Plan Approval (IOD)File: Sheet No- 11,12.pdf | 21 Feb 2018 |
| Building Plan Approval (IOD)File: Sheet No- 2,3.pdf | 21 Feb 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: MIAMI CC 6 12 2017.pdf | 21 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Miami Architect Certificate 31 12 2017.pdf | 20 Feb 2018 |
| Certificates of CA (Form 3)File: Miami 31 December 2017.pdf | 20 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate kanakia miami.pdf | 29 Sep 2017 |
| Layout approvalFile: Layout Plan and Letter.pdf | 7 Jul 2017 |
| Building plan approvalFile: Layout Plan and Letter.pdf | 7 Jul 2017 |
| Building plan approvalFile: Sheet No 2 to 4.pdf | 7 Jul 2017 |
| Building plan approvalFile: Sheet No 5 and 6.pdf | 7 Jul 2017 |
| Building plan approvalFile: Sheet No 7 and 8.pdf | 7 Jul 2017 |
| Building plan approvalFile: Sheet No 9 and 10.pdf | 7 Jul 2017 |
| Building plan approvalFile: Sheet no 11 and 12.pdf | 7 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan and Letter.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: Layout Plan and Letter.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: Sheet No 2 to 4.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: Sheet No 5 and 6.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: Sheet No 7 and 8.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: Sheet No 9 and 10.pdf | 7 Jul 2017 |
| Building Plan Approval (IOD)File: Sheet no 11 and 12.pdf | 7 Jul 2017 |
| Declaration in FORM BFile: Form B Part I Miami.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Miami- Architect Certificate.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part II Miami.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part III Miami.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part IV Miami.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part V Miami.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part VI Miami.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part VII Miami.pdf | 30 Jun 2017 |
| Building plan approvalFile: Miami-Proposed Plan.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: Miami-Proposed Plan.pdf | 29 Jun 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MIAMI-Engineer Certificate.pdf | 29 Jun 2017 |
| Certificates of CA (Form 3)File: MIAMI CERTIFICATE.pdf | 29 Jun 2017 |
| Proforma of Allotment letterFile: Proforma Allotment Letter and Agreement for Sale 29062017.pdf | 29 Jun 2017 |
| Building plan approvalFile: Layout Plan.pdf | 26 Jun 2017 |
| Building Plan Approval (IOD)File: Layout Plan.pdf | 26 Jun 2017 |
| Details of encumbrancesFile: MIAMI-INDEX II.pdf | 22 Jun 2017 |
| Layout approvalFile: Layout Plan.pdf | 21 Jun 2017 |
| Layout approvalFile: Building Plan.pdf | 21 Jun 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 21 Jun 2017 |
| Copy of Layout Approval (in case of layout)File: Building Plan.pdf | 21 Jun 2017 |
| Copy of the legal title reportFile: Title Certificate and Court Order_Miami.pdf | 14 Jun 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: miami cc.pdf | 14 Jun 2017 |
| PAN CardFile: KANAKIA SPACES REALTY PAN.PDF | 7 Jun 2017 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KANAKIA MIAMI | Plot No 766 Junction of Causeway Mori Road Mahim W Mumbai 400016 | 47 | Completed | Sep 2018 | Late, Nov 2019 |
| WALL STREET WING B | CHAKALA ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 400093 | 211 | Completed | Dec 2017 | Mar 2017 |
| KANAKIA AROHA | DATTAPADA ROAD DONGRI OFF VILLAGE KANHERI NEAR LOHANA MARRIAGE HALL BORIVALI EAST MUMBAI 400066 | 183 | Completed | Dec 2017 | Mar 2017 |
| ZILLION PHASE 2 | LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070 | 107 | Completed | Dec 2016 | Late, Jan 2017 |
| BOOMERANG PHASE 2 | MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 400072 | 56 | Completed | Jun 2015 | Late, May 2016 |
| ZILLION PHASE 1 | LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070 | 100 | Completed | Dec 2014 | Aug 2014 |
| ATRIUM II | NEXT TO 215 ATRIUM BEHIND COURTYARD MARRIOT ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 400093 | 64 | Completed | Dec 2014 | Late, Jan 2015 |
| SAMARPAN EXCOTICA | WESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066 | 189 | Completed | Apr 2014 | Late, Jun 2014 |
| 351 ICON | WETSERN EXPRESS HIGHWAY ANDHERI EAST MUMBAI 400069 | 9 | Completed | Sep 2013 | Jul 2013 |
| ANANTA | BEVERLY PARK MIRA ROAD EAST THANE 401107 | 56 | Completed | Jun 2012 | Late, Dec 2012 |
| WESTERN EDGE II | WESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066 | 152 | Completed | Dec 2011 | Late, Jul 2012 |
| BOOMERANG PHASE 1 | MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 400072 | 159 | Completed | Apr 2010 | Late, Aug 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
Keep KANAKIA MIAMI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 60 registered projects within 2 km.
Island Cove
LH Residential Housing Private Limited
Midtown Bay
Rising Sun Impex Private Limited
Island Cove Tower 4
LH Residential Housing Private Limited, Sh
Bayline Residences
HRUB Infra Projects Pvt Ltd
VITALIS
SURAJ ESTATE DEVELOPERS LTD
Suraj One Business Bay
ICONIC PROPERTY DEVELOPERS PVT LTD
Builder: KANAKIA SPACES REALTY PRIVATE LIMITED
KANAKIA SPACES REALTY PRIVATE LIMITED has 11 registrations on MahaRERA, including KANAKIA MIAMI and KANAKIA WALLSTREET WING A. Its filings disclose 15 earlier MahaRERA projects: declares 5 of 15 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if KANAKIA MIAMI is delayed beyond 30 Sep 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KANAKIA MIAMI?
The registered promoter entity is KANAKIA SPACES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2019PTC331509 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KANAKIA MIAMI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KANAKIA MIAMI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KANAKIA MIAMI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KANAKIA MIAMI?
The professionals named in the filing: Architect: Mr. Rushikesh Hadnoorkar; Architect: Mr.Tarun Motta; Architect: Mr. Ajay Sawant; Engineer: Mr. Watve; Engineer: Mr. Charudatta V. Samant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KANAKIA MIAMI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.