Kaleshwara Heights

By Kirti Construction

RG-MH-02338 · RERA P52400014372 · Last updated on MahaRERA portal: 6 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 38 months past the filed date
  • Litigation declared, 1 case
  • Completion date moved by 29 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Aug 2023Possession promised38 months past this date
17 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Kaleshwara Heights is a Residential / Group Housing project by Kirti Construction in Latur, Maharashtra, registered with MahaRERA as P52400014372 on 27 Nov 2017. Possession was promised by 31 Aug 2023 and is now 38 months past that date. The completion date has moved by 29 months from the original filing.

At a glance

Project

  • NameKaleshwara Heights
  • TypeResidential / Group Housing
  • Location
    • Hatte Nagar
    • Latur (M Cl)
    • Latur
    • 413512
  • Pincode413512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400014372
  • ReraGenie IDRG-MH-02338

Builder

  • NameKirti Construction
  • Entity typePartnership
  • Authorized PartnerSantosh Kumar Hatte
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

38 months past promisethis monthRegisteredNov 2017First promiseMar 2021Revised toAug 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Nov 2017
  • Promised completion31 Aug 2023
  • Revised completionRevised to 31 Aug 2023 (originally 23 Mar 2021)
  • Buildings2 building records
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA70000
Building BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,346 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Somshekhar Mohan HatteLatur (M Cl)Latur

Approvals and building plan

Permissible FSI2287.48
Proposed, not sanctioned1,431 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchhatte chowk, Latur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVipul Nikam & Associates
EngineerManoj R Suryvanshi
Chartered AccountantShilpa
PartnerRole in project
Kirti Construction-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52400009838Mar 2021 → Feb 2022

Reason as filed by the promoter1) Because of poor Customer response 2) Effect of Covid-19 3) Availability of Labor

EXT52400011492Mar 2021 → Feb 2023

Reason as filed by the promoter- Because of low customer response - Existing Customer payment is not in proper time - But Within 10 months Project will complete

EXT52400014028Mar 2021 → Aug 2023

Reason as filed by the promoter-poor booking of flats -Because of litigation some flats are cancelled -Around 90% work was done -Out of 15 4 flats are cancelled - In September we revised the permission -Document is Uploaded

Litigation declared1

CaseCourtStatus
Spl C S 466/2022/2022six joint civil judge senior division laturShow Cause Notice Received

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Nov 2024

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Appl Extn 1.pdf6 Jan 2025
Other - TechnicalFile: Concent of Alloteess.PDF6 Jan 2025
Other - TechnicalFile: Extenssion.PDF6 Jan 2025
Building plan approvalFile: Epson428compressed.pdf4 Jan 2025
Building plan approvalFile: Epson429compressed.pdf4 Jan 2025
Building plan approvalFile: Epson430compressed.pdf4 Jan 2025
Building plan approvalFile: Epson431compressed.pdf4 Jan 2025
Building plan approvalFile: Epson419compressed.pdf4 Jan 2025
Building plan approvalFile: Epson420compressed.pdf4 Jan 2025
Building plan approvalFile: Epson421compressed.pdf4 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.PDF4 Jan 2025
Building Plan Approval (IOD)File: Epson420compressed.pdf4 Jan 2025
Building Plan Approval (IOD)File: Epson421compressed.pdf4 Jan 2025
Building Plan Approval (IOD)File: Epson419compressed.pdf4 Jan 2025
Building Plan Approval (IOD)File: Epson431compressed.pdf4 Jan 2025
Building Plan Approval (IOD)File: Epson430compressed.pdf4 Jan 2025
Building Plan Approval (IOD)File: Epson429compressed.pdf4 Jan 2025
Building Plan Approval (IOD)File: Epson428compressed.pdf4 Jan 2025
Other - TechnicalFile: Concent of Alloteess.PDF4 Jan 2025
Other - TechnicalFile: Extenssion.PDF4 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.PDF1 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.PDF28 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occpancy Certificate.PDF28 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventry.PDF28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2022 2023.PDF20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Kale Apr.PDF21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Kale Apr.PDF21 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventery Kale Apr.PDF21 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventry.PDF20 Jan 2024
Certificates of CA (Form 3)File: Form 3.PDF20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng Q A Form 2A 2023.PDF20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2023.PDF20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate 2021-2022.PDF26 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.PDF13 Feb 2023
Proforma of Agreement for saleFile: A_TO_S_RERA.pdf13 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: D Bank.PDF13 Feb 2023
Deviation Report with respect to Allotment letterFile: D Allotment.PDF13 Feb 2023
Deviation Report with respect to model copy of AgreementFile: D Agreement.PDF13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A1.PDF1 Feb 2023
PAN CardFile: download (4).pdf24 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200238078081_For_Asset_Based_Search_24_05_2022_20_52_07_252.pdf24 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENG Certificate.PDF20 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate (8).PDF20 May 2022
Disclosure of sold/ booked inventoryFile: Scan123.PDF27 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory2.PDF6 Aug 2021
Building plan approvalFile: Permmision.PDF7 Jul 2021
Building Plan Approval (IOD)File: Permmision.PDF7 Jul 2021
Declaration about Commencement CertificateFile: Commencement.PDF7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Scan2.PDF3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Scan3.PDF3 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventry.pdf3 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-18.PDF3 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.PDF3 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.PDF3 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.PDF3 Jul 2021
Building plan approvalFile: Layout11.pdf22 Nov 2017
Building Plan Approval (IOD)File: Layout11.pdf22 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Parwana.pdf22 Nov 2017
Proforma of Allotment letterFile: Allotment Letter.pdf22 Nov 2017
Certificates of CA (Form 3)File: C A 11.pdf14 Nov 2017
Layout approvalFile: Layout.pdf8 Nov 2017
Copy of the legal title reportFile: Legal Report1111.pdf8 Nov 2017
Details of encumbrancesFile: Encumbrance certificate.pdf8 Nov 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf8 Nov 2017
Declaration in FORM BFile: Affidavit1.pdf8 Nov 2017
Proforma of Allotment letterFile: Microsoft Word - AGREEMENT TO SALE WITHOUT POSSESSION2.pdf8 Nov 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Laxmi AnganHatte Nagar8CompletedDec 2014Dec 2014
Laxmi DhamKaneri ChowkMore Nagar40CompletedAug 2014Late, Sep 2014

How this compares with Latur

10%of Latur projects moved their completion datethis one moved by 29 months
31%of Latur registrations have lapsed or been cancelledthis one is among them

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep Kaleshwara Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hatte Nagar150+ in Latur

Builder: Kirti Construction

Kirti Construction has 2 registrations on MahaRERA, including Goolden Woods and Kaleshwara Heights. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What does it mean that Kaleshwara Heights shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Kaleshwara Heights is delayed beyond 31 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kaleshwara Heights?

The registered promoter entity is Kirti Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kaleshwara Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kaleshwara Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kaleshwara Heights?

The professionals named in the filing: Architect: Vipul Nikam & Associates; Engineer: Manoj R Suryvanshi; Chartered Accountant: Shilpa. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kaleshwara Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kaleshwara Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kaleshwara Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.