ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / K VILLE PHASE IV

Registered No litigation declared Others project

K VILLE PHASE IV

By Unique Chintamani Development LLP

RG-MH-48313 · RERA P52100049230 · Last updated on MahaRERA portal: 20 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

K VILLE PHASE IV is a Others project by Unique Chintamani Development LLP in Pune, Maharashtra, registered with MahaRERA as P52100049230 on 3 Feb 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameK VILLE PHASE IV
  • TypeOthers
  • Location
    • Bhakti Shakti to Mukai Chowk 45 Mtr Road
    • Kiwale
    • Pune
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100049230
  • ReraGenie IDRG-MH-48313

Builder

  • NameUnique Chintamani Development LLP
  • Entity typePartnership
  • PartnersManoj Ashok Agarwal, Hemant Shantilal Jain, Anuj Manish Sabade, Nirmala Sunil Agarwal
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA160000
Commercial ANA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

A97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Commercial A97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed116

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots116
Closed/Covered116

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,962 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12810.34
Proposed, not sanctioned12,810 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround And Mezzanine Loft Floor, Udchalo House, Arena Building, Plot No 10, Viman Nagar, Pune

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Unique Chintamani Development LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Kville P4 (2023-24).pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - P4.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - P4.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P4.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P4.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - P4.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P4.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory P4.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P4.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - P4.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P4.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory P4.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P4.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - P4.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P4.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory P4.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P4.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5 Phase IV.pdf18 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory P4.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P4.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - P4.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P4.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory P4.pdf1 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - P4.pdf16 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - P4.pdf16 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P4.pdf16 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf6 Mar 2023
Proforma of Agreement for saleFile: Draft Agreement.pdf21 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf25 Jan 2023
Other - TechnicalFile: output.pdf17 Jan 2023
Building plan approvalFile: Scan_1484-01.pdf22 Dec 2022
Building plan approvalFile: Scan_1485-01.pdf22 Dec 2022
Building plan approvalFile: Scan_1485-02.pdf22 Dec 2022
Building plan approvalFile: Scan_1485-03.pdf22 Dec 2022
Building plan approvalFile: Scan_1485-04.pdf22 Dec 2022
Building plan approvalFile: Scan_1485-05.pdf22 Dec 2022
Building plan approvalFile: Scan_1485-06.pdf22 Dec 2022
Building plan approvalFile: Plan 31 - A Commercial.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1484-01.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1485-01.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1485-02.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1485-03.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1485-04.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1485-05.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan_1485-06.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 31 - A Commercial.pdf22 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf22 Dec 2022
CERSAI detailsFile: CERSAI Report.pdf22 Dec 2022
Layout approvalFile: Layout.pdf21 Dec 2022
Building plan approvalFile: Plan.pdf21 Dec 2022
PAN CardFile: PAN Card.pdf21 Dec 2022
Copy of the legal title reportFile: Title Search Report Annexure.pdf21 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf21 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf21 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf21 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf21 Dec 2022
Declaration about Commencement CertificateFile: Format D.pdf21 Dec 2022
Declaration in FORM BFile: Form B.pdf21 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Dec 2022
Proforma of Allotment letterFile: Allotment Letter.pdf21 Dec 2022
Proforma of Agreement for saleFile: Sample Agreement.pdf21 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Details.pdf21 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf21 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf21 Dec 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K VILLE PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kiwale, Pune13,700+ in Pune

Builder: Unique Chintamani Development LLP

Unique Chintamani Development LLP has 4 registrations on MahaRERA, including K Ville Phase I and K Ville Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if K VILLE PHASE IV is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K VILLE PHASE IV?

The registered promoter entity is Unique Chintamani Development LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K VILLE PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for K VILLE PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in K VILLE PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K VILLE PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K VILLE PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.