Completed No litigation declared Residential / Group Housing project

K TOWN PHASE 1

By UNIQUE AMS SPACES LLP

RG-MH-17371 · RERA P52100028608 · Last updated on MahaRERA portal: 17 Jun 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 94%
2Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

K TOWN PHASE 1 is a Residential / Group Housing project by UNIQUE AMS SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100028608 on 25 Mar 2021. The registration is recorded completed; possession was promised by 30 Sep 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameK TOWN PHASE 1
  • TypeResidential / Group Housing
  • Location
    • 30M WIDE ROAD FROM MUKAI CHOWK TO MUMBAI BENGALURU HIGHWAY
    • KIWALE
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100028608
  • ReraGenie IDRG-MH-17371

Builder

  • NameUNIQUE AMS SPACES LLP
  • Entity typePartnership
  • PartnersSUMIT SUBHASH TAYAL, SUBHASH RAMKISAN TAYAL
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2021PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Mar 2021
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA200000
A2NA200000
ENA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 94%.

A190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%
A290%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%
E90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%

Progress on shared amenities15

As on 17 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,405 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DILIP VIJAY SAHASRABUDHEKothrudPune
SHUBADHA VIJAY SAHASRABUDHEKothrudPune

Approvals and building plan

Permissible FSI37399.15
Proposed, not sanctioned37,317 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYANINAGAR, PUNE MH, MARIGOLD PREMISES, GROUND FLOOR, SURVEY 15 VADGAONSHERI KALYANI NAGAR PUNE 41

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOLESPACE
ArchitectSPACE CRAFT ASSOCIATES
EngineerPHAROHAJ MAHABRI
Chartered AccountantP S Z & ASSOCIATES
PartnerRole in project
UNIQUE AMS SPACES LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12600038UNIQUE AMS SPACES LLPRushikest Sampat Chavan03/01/2026
CC12600736UNIQUE AMS SPACES LLPMahir Yunus Karjikar09/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Apr 2024

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: K TOWN FORM 4_merged.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K TOWN PH 1 FORM 2 Q2.PDF21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K TOWN PH 1 FORM 2 DEC 23.PDF21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K TOWN PH 1 FORM 2 MAR 24.PDF21 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K TOWN PH 1 FORM 1 MAR 24.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: K TOWN PH 1 SOLD INVENTORY MAR 24_compressed.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 K TOWN PHASE 1_compressed.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K TOWN PH 1 FORM 3 Q1_compressed_compressed.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K TOWN PH 1 FORM 3_compressed_compressed.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K TOWN PH 1 FORM 3 DEC 23_compressed (2).pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K TOWN PH 1 FORM 3_compressed (2).pdf12 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: UNIQUE A1 A2 E Bldg - Completion Certificate.pdf10 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: K TOWN PH 1 FORM 5.PDF20 Jan 2024
Disclosure of sold/ booked inventoryFile: K TOWN PH 1 SOLD INVENTORY Dec 2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K TOWN Form 1 PH 1.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K TOWN PH 1 FORM 2 Q1.PDF30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K TOWN PHASE 1.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K TOWN PHASE 1.PDF20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K TOWN PH 1 FORM 1 Q2.PDF20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: K TOWN PH 1 FORM 2A.PDF20 Oct 2023
Disclosure of sold/ booked inventoryFile: K TOWN PH 1 SOLD INVENTORY Q2_compressed.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_PHASE I_2022.PDF4 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY K TOWN PHASE 1.PDF25 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY DT 31032023 A1 A2 E.PDF5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Phase 1 2122.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Phase 1 2122.pdf20 Feb 2023
Disclosure of sold/ booked inventoryFile: K TOWN DISCLOSURE OF SOLD INVENTORY DT 31-12-2022-PHASE I compressed.pdf23 Jan 2023
Disclosure of sold/ booked inventoryFile: K TOWN DISCLOSURE OF SOLD INVENTORY - 30-09-2022-PHASE - I_compressed.pdf12 Nov 2022
Disclosure of sold/ booked inventoryFile: Phase - i K- Town_compressed.pdf27 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - K TOWN PHASE 1_compressed.pdf28 May 2022
Layout approvalFile: K Town new sanction_compressed.pdf6 Jan 2022
Copy of Layout Approval (in case of layout)File: K Town new sanction_compressed.pdf6 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC New_compressed.pdf6 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227593117_For_Asset_Based_Search_06_01_2022_17_43_56_664.pdf6 Jan 2022
CERSAI detailsFile: CERTIFICATE OF NO SECURITY INTEREST.pdf27 Dec 2021
CERSAI detailsFile: CERTIFICATE OF NON ENCUMBRANCE.pdf27 Dec 2021
Copy of the legal title reportFile: Title Search.pdf14 Sep 2021
Disclosure of sold/ booked inventoryFile: K Town - Sold.pdf14 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Unique_Spaces_compressed.pdf24 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf9 Jul 2021
Declaration about Commencement CertificateFile: circular 32 (1).pdf3 Jul 2021
Disclosure of sold/ booked inventoryFile: circular 29.pdf3 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf3 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf3 Jul 2021
Layout approvalFile: 4 5 Sanction Plan KTOWN.pdf9 Mar 2021
Building plan approvalFile: 4 5 Sanction Plan KTOWN.pdf9 Mar 2021
PAN CardFile: 1 PAN CARD K TOWN.pdf9 Mar 2021
Copy of the legal title reportFile: 2 LEGAL TITLE SEARCH REPORT_compressed.pdf9 Mar 2021
Details of encumbrancesFile: 3 No encumbrances letter K TOWN.pdf9 Mar 2021
Copy of Layout Approval (in case of layout)File: 4 5 Sanction Plan KTOWN.pdf9 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 4 5 Sanction Plan KTOWN.pdf9 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: 6 CC KTOWN_compressed.pdf9 Mar 2021
Declaration in FORM BFile: 7 FORM B BUILDER KTOWN.pdf9 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate for RERA K TOWN_compressed.pdf9 Mar 2021
Proforma of Allotment letterFile: 9 Proforma of allotment letter and agreement for sale K TOWN.pdf9 Mar 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K TOWN PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KIWALE13,700+ in Pune

Builder: UNIQUE AMS SPACES LLP

UNIQUE AMS SPACES LLP has 5 registrations on MahaRERA, including K TOWN PHASE 1 and K Town Building A3 and C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if K TOWN PHASE 1 is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K TOWN PHASE 1?

The registered promoter entity is UNIQUE AMS SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K TOWN PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against K TOWN PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for K TOWN PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K TOWN PHASE 1?

The professionals named in the filing: Architect: SOLESPACE; Architect: SPACE CRAFT ASSOCIATES; Engineer: PHAROHAJ MAHABRI; Chartered Accountant: P S Z & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K TOWN PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K TOWN PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K TOWN PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.