Home / Browse projects / Pune, Maharashtra / K PUNE BUILDING A, B

Registered No litigation declared Residential / Group Housing project

K PUNE BUILDING A, B

By VMC LANDMARK REALTY LLP

RG-MH-61371 · RERA P52100047630 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 80%
29 of 328Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

K PUNE BUILDING A, B is a Residential / Group Housing project by VMC LANDMARK REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100047630 on 14 Nov 2022. Possession is promised by 30 Sep 2027. 299 of the 328 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameK PUNE BUILDING A, B
  • TypeResidential / Group Housing
  • Location
    • Bavdhan
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100047630
  • ReraGenie IDRG-MH-61371

Builder

  • NameVMC LANDMARK REALTY LLP
  • Entity typePartnership
  • PartnersRakesh Chandrabhan Agarwal, Sunil Rameshwardas Agarwal, Shyamlal Patiram Goel
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2022PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2022
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed80 files

Current status

91%299 of 328 units booked
97.5%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA24211640164
Building BNA24211640164

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.

Building A72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes40%
Street LightingYes20%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed328

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots328
Closed/Covered328
BuildingClosed/CoveredTotal
Building A164164
Building B164164

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,367 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jan 2026

Approvals and building plan

Sanctioning authorityPune Municipal corporation
Permissible FSI41052.88
Proposed, not sanctioned39,171 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 15, Ground Floor, Marigold Premises, Kalyani Nagar - Wadgaon Sheri Road, Pune
Estimated costRs 157.34 cr
Cost incurredRs 153.32 cr
Work done97.45%
BuildingWingEstimatedIncurred
Building ANARs 70.80 crRs 70.53 cr
Building BNARs 70.80 crRs 70.53 cr
-NARs 15.73 crRs 12.27 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHirak Shah
EngineerAmit Laxman Nanaware
Chartered AccountantAmol Shah & Associates
Chartered AccountantDeo & Company
Chartered AccountantDarshan Shah
PartnerRole in project
VMC LANDMARK REALTY LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600314Ram GawaliVMC LANDMARK REALTY LLP12/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: K PUNE BUILDING A B 2022-23.pdf7 May 2026
Form 5 (FY 2023-2024)File: K PUNE BUILDING A B 2023-2024.pdf7 May 2026
Withdrawal Update Form 1File: FORM 1.PDF23 Apr 2026
Withdrawal Update Form 2File: FORM 2.PDF23 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf23 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A FY 2024-25.PDF5 Feb 2026
Withdrawal Update Form 1File: FORM 1.PDF20 Jan 2026
Withdrawal Update Form 2File: FORM 2.PDF20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: J 302 Reg Agreement_15122025112931 (1).PDF12 Dec 2025
Withdrawal Update Form 1File: K PUNE AB FORM 1.PDF3 Nov 2025
Withdrawal Update Form 2File: K PUNE AB FORM 2 Q1.PDF3 Nov 2025
Withdrawal Update Form 3File: K PUNE AB FORM 3_compressed (1).pdf3 Nov 2025
Form 1File: K PUNE AB FORM 1.PDF3 Oct 2025
Form 2File: K PUNE AB FORM 2.PDF3 Oct 2025
Disclosure of Sold and Booked InventoryFile: K PUNE AB SOLD INVENTORY.PDF3 Oct 2025
Form 3File: K PUNE AB FORM 3 Q1_compressed (2).pdf3 Oct 2025
Form 1File: K PUNE AB FORM 1.PDF15 Jul 2025
Form 2File: K PUNE AB FORM 2.PDF15 Jul 2025
Form 3File: K PUNE AB FORM 3 Q4_compressed (1).pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: K PUNE AB SOLD INVENTORY.PDF15 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K PUNE AB FORM 2.PDF20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE AB FORM 1.PDF12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE AB FORM 3 Q4_compressed.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: K PUNE AB SOLD INVENTORY_compressed (1).pdf12 Apr 2025
Building plan approvalFile: plan (3).pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: plan (3).pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE AB FORM 1 Q3.PDF18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE A B FORM 3_compressed.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K PUNE AB FORM 2.PDF18 Jan 2025
Disclosure of sold/ booked inventoryFile: K PUNE AB SOLD INVENTORY_compressed.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE AB FORM 3_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K PUNE AB FORM 2.PDF19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: K PUNE AB FORM 2A.PDF19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: K PUNE AB FORM 5.PDF19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE AB FORM 1 Q2.PDF15 Oct 2024
Disclosure of sold/ booked inventoryFile: K PUNE AB SOLD INVENTORY Q2.PDF15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE AB FORM 1 Q1.PDF19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K PUNE AB FORM 2 Q1.PDF19 Jul 2024
Disclosure of sold/ booked inventoryFile: K PUNE AB SOLD INVENTORY Q1.PDF19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE AB FORM 3 Q1_compressed.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K PUNE.PDF20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K PUNE FORM 2 MAR 24.PDF20 Apr 2024
Disclosure of sold/ booked inventoryFile: K PUNE SOLD INVENTORY MAR 24.PDF20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE BUILDING AB FORM 3 MAY.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE FORM 3 DEC 23_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K PUNE FORM 3 MAR 24_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE FORM 1 DEC 23.PDF19 Jan 2024
Disclosure of sold/ booked inventoryFile: K PUNE SOLD INVENTORY.PDF19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: K PUNE FORM 5.PDF19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: K PUNE AB FORM 2A.PDF30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE FORM 1 Q1.PDF20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K PUNE FORM 1 Q2_compressed.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: K PUNE AB SOLD INVENTORY.PDF20 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY K PUNE AB.PDF27 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY K PUNE BUILDING A,B DT31032023.PDF8 May 2023
Building plan approvalFile: Building Plan Sheet.pdf20 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Sheet.pdf20 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Building CC.pdf20 Mar 2023
Other - LegalFile: Sample Agreement.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf28 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Details.pdf28 Sep 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf22 Sep 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf22 Sep 2022
Declaration about Commencement CertificateFile: Format D.pdf22 Sep 2022
Declaration in FORM BFile: Form B.pdf22 Sep 2022
CERSAI detailsFile: CERSAI Report.pdf22 Sep 2022
Proforma of Allotment letterFile: Allotment Letter.pdf22 Sep 2022
Proforma of Agreement for saleFile: Allotment Letter.pdf22 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf22 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf22 Sep 2022
Layout approvalFile: Layout.pdf19 Sep 2022
Building plan approvalFile: Plan.pdf19 Sep 2022
PAN CardFile: PAN Card.pdf19 Sep 2022
Copy of the legal title reportFile: Title Search Report Annexure.pdf19 Sep 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf19 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf19 Sep 2022

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K PUNE BUILDING A, B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavdhan13,700+ in Pune

Builder: VMC LANDMARK REALTY LLP

VMC LANDMARK REALTY LLP has 3 registrations on MahaRERA, including FLOW BAVDHAN and K PUNE BUILDING A, B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if K PUNE BUILDING A, B is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K PUNE BUILDING A, B?

The registered promoter entity is VMC LANDMARK REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K PUNE BUILDING A, B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against K PUNE BUILDING A, B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for K PUNE BUILDING A, B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K PUNE BUILDING A, B?

The professionals named in the filing: Architect: Hirak Shah; Engineer: Amit Laxman Nanaware; Chartered Accountant: Amol Shah & Associates; Chartered Accountant: Deo & Company; Chartered Accountant: Darshan Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K PUNE BUILDING A, B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K PUNE BUILDING A, B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K PUNE BUILDING A, B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.